Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

kosiowpeng

Banned
  • Content Count

    8
  • Joined

  • Last visited

Community Reputation

0 Neutral

About kosiowpeng

  • Rank
    Member

Previous Fields

  • Gender
    Male
  1. It wasting my time early in the morning back to office to reply all this rubbish. So you Husband and Wife still got things to say? If yes carry on putting up in this forums. Oh Yar forget what you say only you yourself know well and missing point, wire not well screw up only you know. So many of them just listen to you guys saying about me only and you guys is the only one saying K & J Electrical Engineering Enterprise is con. Just mind your words when saying all this. So far i have done so many units on this forums do they complain a post about my jobs? Only you Husband and Wife do it. only you should know well. One more things i will comfirm my campany name will not change and maybe you are right but i'm not so sure too my no will change if i drop my phone again. Anyway you still can get my new no in my blog as i will update it so people can look for me. Lastly thanks for your feedback on my guy ENGLISH. I'll ask him to study more. Thanks & Rdgs Tham Ying Quan K & J Electrical Engineering Enterprise Manager
  2. Conman at work, stay clear of Kelvin Tham Ying Quan and his accounts here recommending himself using other people's name. Will post all his details and prove of my claims soon.

  3. It is very clear. Suddenly now you are Kelvin Tham, earlier forging someone's identity huh! Dishonesty at work again!

  4. please get it clear when you saying ppl.

    Thanks

  5. yoyoyo ying quan told me about your case yesterday when i see this you put this up ask yourself who is the one who go wrong first then you put up ok. Below are the question and please answer in this forums thanks 4 out of 7 IR sensor not working after a few days, I told him to replace as it is under his warranty but he disppeared into thin air. Answer can i ask you anyway the job was not hand over and he tested all for you and let on not fix up as your LED was not here yet and last you say 1 IR sensor was not working and he changed for you the next day? have or don't have ask yourself.and this should be done by your ID we only install and i got to do up his job as you the one who say listen to him and what he say just do it so we just follow what youi say. 3 out 6 LAN cables are faulty or wired wrongly. answer why dont you ask him back to do it as it not hand over yet.n he ever tell you think is not connect properly and he want to come back to fix up for you and you say your ID will do it and i correct to say this. 1 out of 3 SCV cables are faulty as he short the earth and the core. Answer you sms him that the SCV at MAster room Cant use but can ask you as for doing hacking do they damage it first as they can damage the Cat 6 cable after they lay and standby. 1 out of 4 telephone points faulty. Answer so are you sure of that before putting it up the only help you to shift without doing anythings on the cable omg dont put things anyhow think before you put 2 power points not working as he did not connect them properly. answer who did not connect properly Ying Quan or your ID guys common toilet he already inform you and he say will do it on friday and plus the kitchen glass is up will do all the power connection up but in the end friday he sms you saying your ID never pick up the call and what you say to him SMS him am i correct to say that. one already info you the others is done by your own guys and you can put the blame to him in this forums omg. 3 damaged faceplates (sockets and telephone etc) and he kept quiet about it. answer the faceplates is all brought from you yourself so how he know the telephone is damage and ksingle socket he already sms you in hand or you want me to take down all the picture and put it up here to let everybody see what he sms you. Holes in the wall, ceiling, tiles etc all not patty-patched up after he digs them. My contractor has to patch it up for him again and again at my cost. answer tiles put it aside first. Hole we open and we still working on it light opening for lightinbg hole all this and gap at the side of the light come on you the one 1 hole ask ppl to come 1 hole as ppl to come as they haven't complete yet and you want them to pay is it funny for it. last is the tiles we patch back and you want to replace the tiles am i correct. Suppose to pass me back all the MK switches that comes in the package but he didn't (I bought my own switches instead) answer is clipsal not mk and the first time he show you you dont like it so you say you buy your own am i correct. he say in the end of the day will pass you the new faceplate. yar we never pass you this will be lastly give an answer here in this forums. Alignment of lights all crooked. answer anyway you want 100% he try to do it for you did he. come on ask yourself the light he fix up on the same day you ask gain city guy to do the remote taking the light up and down correct anot. anyway we not pushing blame aways as i know you will say that please think before you put this up in forums. Don't put words inside Ying Quan mouth ok he lost his phone and that the new phone no. old phone - and new no *unauthorized electrical ad* correct. Lastly that all comment on you. First of all did you keep changing point and change. that last 8 T5 points you request to add and we say it already do the ceiling how to add and this what you say open up i will ask ppl to do up the plasting the (cost on him). before the floor was done up and Ying Quan got ask you and your ID for a Handover to see is there anythings missing and all the points is there. And when your study table is up 0one of the SCV point was not there so you put the blame on him is there correct as the first place all points already handover when it ready to you and your ID. He never attend to your call why ask yourself first not he run away from anyone. first you and your ID is pushing to each other as he want to finish up his job but you the one ask the ID ppl to do it when the job is still havent handover. but all costb you charge on Ying Quan so that mean you doing the right things by asking other ppl to do the balance job. And stop all the crap **** saying his job not properly done or what he show me the sms of what you sent addition point some already in the invoices so dont have to tell only two things you added not in and he tell you the cost already so more you say never omg isnt too much. the last cost he ever email to you on what point is deduct and what is add and the total come to $5000 plus in the end omg the sms say he still got to pay you $800 plus. that mean all the point of power 1x13A qty5 2x13A qty19 lighting point qty 48 SCV point qty 4 and so on for $2000 plus only why not you do it for me as we not on hand got many point to install. somemore all conceal. he never pick up or reply your sms as do you think he will still listen for you comand as no money pay and pushing all the blame and cost on him as you that one who do all this crap ****. wasting time and salay just to go up fix some light fitting which never say where and what the distance from light to light. one whole day can just fix 5 fittings.
  6. hei...why you so rubbish man...doing ppl house like a ****..hope god will bless u

  7. good day, not really. if you want to test by lew yes there will be a charge for that but you dont want the amount can wave off. as you not touching the main incoming so you dont need for testing. anyway $250 for lew testing is cheap.so depand on you want it anot.
  8. depand on how many point you need or you need the cost call *unauthorized electrical ad* for more info on it
  9. that not the correct way of doing the L-box. i thinks you should change the contractor as if you pay him up will he do a good job for you again. if im not wrong the price that you get is cheap that why the job out is soso. im saying what i thinking hope you not angry. you can call *unauthorized electrical ad* to check whether he can help on the reno anot.
  10. Hi this is easily to assemble if you ask a electrician to do it will be $10 per pieces if the amount is less then 10 qty will be $20 per pieces
  11. can call *unauthorized electrical ad* for free quota
  12. im sell that at $16.70 per transformers
×