S/N DESCRIPTION T/PRICE PROFESSIONAL SERVICE 1 Design consultation & space planning 2 Design proposal & 3D prespective drawings ( *$300.00 ) *F.O.C 3 Selection of colour, material & accessories , decoration advice 4 Site co-ordination & supervision A PLUMBING WORK (OWNER SUPPLY FITTING) 1 Supply & install new Stainless steel piping for Kitchen sink (Cold only) $180.00 2 Supply labour to install 01 nos of Kitchen sink $80.00 3 Supply labour to install 01 nos Storage heater $100.00 4 Supply labour to install 01 nos Kitchen sink Tap fitting $60.00 5 Supply labour to install shower set F.O.C 6 Supply labour to install Accessories & mirror F.O.C B PAINTING WORKS 1 Painting of whole house with ICI/NIPPON Pentalite paint(Up to 6 colour) $1,250.00 a main gate, frames & piping C TIMBER WORKS 1 Supply & install Classic door at 03 nos bedrooms & 02 nos toilets c/w $950.00 round door knob sets with magnetic stopper D ALUMINIUM BI-FOLD DOOR 1 Supply & install 02 nos Aluminium Bi-fold door at Both toilets CUSTOM-MADE FURNITURE (EDL LAMINATE) E MASTER BEDROOM 1 Design & fabricate (L8ft) full ht Sliding doors Wardrobe $2,240.00 a Selected Laminate finish b internal carcass in white pvc finish c heavy top hung tracks d lockable drawer unit e top storage cabinet F KITCHEN CABINET 1 Design & fabricate Suspended kitchen cabinet complete with : $2,720.00 a doors in seleted laminate finish and ABS trimmings b (L21ft) bottom cabinet internal carcass in white pvc finish c 01 nos of Aluminium frames with sandblasted glass door d s/s dish rack e installation of hob, hood (item supply by owner) f soft closing for casement S/N DESCRIPTION T/PRICE G SOLID SURFACE 1 Supply & install solid surface top at kitchen approx (L21ft) $1,785.00 H CLEANING WORK 1 Clearing of debris, uploading, downloading of haulage $350.00 2 Supply & lay corrugated paper for affected flooring $150.00 3 Provide chemical washing for whole house (Flooring Only) $180.00 T/TOTAL : $10,045.00 I REMARKS 1 No 7% GST Charges 2 No Hidden Cost 3 5 years warranty on workmanship (Warranty letter will be given after work completion) J TERMS & CONDITIONS Payment Terms 10% of Contract Sum upon Signing & Confirmation 50% of Contract Sum upon Commencement of works 35% of Contract Sum upon Commencement of Carpentry works at Factory 05% of Contract Sum upon Completion Note * Quotation above does not include any P.E Submission hacking of wall super budget reno as quoted by SDS. feel free to comment.