

Atmos
Members-
Content Count
83 -
Joined
-
Last visited
Content Type
Profiles
Forums
Gallery
Everything posted by Atmos
-
Sorry to be away for so long. Everything came to a stop for 7th month (i "pan dang"). Still missing my sofa and dining table. Schedule to come in after 7th month. Then is the installation of the wooden blinds for living room and roller blinds for the rooms and solar film for all. Still have minor touch ups needed from Mr. K. Too lazy to take photos nowadays. Will definitely update once everything is up. To Bettarism: I am doing parquet for my rooms and tiles for living + kitchen. The cement screed that you saw is the prep.
-
Yes, homogeneous tiles for the flooring stretching from the living room to the kitchen. Rooms will be parquet.
-
Hi Tangie, There is a dent in the wall, metal frame to flush with the wall. Hope you understand what i'm talking. You can check out 2nd pic for better understanding.