Hi all, Need some advise on the following: 1)Say when there is an existing lighting point, the electrician taps that point to make it a total of 4 points, do they charge this as 3 or 4 additional lighting points? 2) For looping of T5 cove lights, lets say I need 3 T5 tubes to make up the cove light, how would they charge? Do they charge it as 1 lighting point and 3 installation of T5 light with looping? Sorry for sounding so noob hee, just wanted to know what is the standard practice in the industry. Thanks!