marble
Members-
Content Count
112 -
Joined
-
Last visited
Community Reputation
0 NeutralAbout marble
-
Rank
Gold Member
Previous Fields
-
Gender
Male
Recent Profile Visitors
The recent visitors block is disabled and is not being shown to other users.
-
Sorry for the lack of updates. Baby has arrived since Monday. Been busy the entire week.
-
Overall it's completed. Now whats left is for us to find the kinks for the final touch up together with the curtains and gas connection on Monday.. Currently in the process of moving stuff over and cleaning up the house(this needs to be done at least 3-4 times) before we think it's livable.
-
Actually he has not more ports than yours because 2 ports are used for uplink. 3 + 5 - 2 = 6
-
Erm.. might be a geek thing but here's a non-exhaustive list of reasons why I did it. 1) Do now so all can be concealed and neater 2) Wifi can get congested i.e. you transfer large amount of data can affect other users. 3) For wifi to cover the WHOLE house you need to have high transmission power, btw FYI, wifi runs on 2.4GHz which is the same as your microwave.. Which means, if the output is high enough the antenna can cook. I dont really want to cook anything nor risk anything to be cooked. Studies can say whatever but if my microwave can cook my wifi can too. Remember a small tealight candle can keep food warm too. 4) Ethernet has higher speed, up to 10-100 times faster than wifi anytime. 5) Common set-top box by MDA/IDA/Whatever A. More likely than not your future set-top boxes gonna look like what MIO has to offer. If you want paid tv in your room you need ethernet.
-
Because it is really stupid when my wife is due and my priorities MUST be with my kid. Hindsight always have 20/20 vision but it's useless already. On a professional level, he made the decision, he answer for it.
-
This is the reason why this forum existed in the first place. Consumers pay to outsource tasks that cannot be done by themselves. ID or otherwise, you accepted the job the responsibility is yours especially when you choose to push back the delivery. If I run the job myself then it's incredibly stupid to hire the main con in the first place. You want to earn your fair share, you do your fair share. You screw up, I hold you responsible. Either way it's not my company to run. how the heck i know when he got resources to put at my place. This is plain silly assumption.
-
It should be transparent to me. You cock up the timing you answer. Especially so if you're the boss. Why am I paying if I'm doing your job? Seriously..
-
The joker contractor happens to be the boss of the carpentry as well...
-
Actually, the stuff were supposed to be delivered 3 weeks ago. the Joker contractor say hold it at warehouse first if not get damaged..
-
Only the frame in the kitchen is done, there's still a few more to go..
-
Was not given any handover date.. he has been okaying us the whole reno..
-
The contractor is not helping by NOT sending workers to my place today... Carpentry is on going since last Wednesday. Which he said 4-5 days. Tmr is the 4-5 days. Dunno how he gonna pull out the miracle since only the kitchen frame is installed. Bloody pissed. Doesn't seem to be taking I need the freaking house now seriously.
-
It's 4.5 inches. Should be able to put most of the things. Probably looks skinny because it's really long.
-
Huh? Your gas pipe run thru the bath?
-
Tiles should be fine. They take a long time to show. My parents place kitchen tiles made loud cracking noises and popped up after 15 years. Gotta be careful with laminates. If water seeps thru the gaps it's gone. My mil place ac leaked while we were sleeping. Woke up to damaged floors