Ya they are **** slow... and their work sucks. after they are gone, i still have to touch up here and there myself... grrh... think ur HDB contractor and mine shld be the same 1 lah... After u submit the defects list, u still gotta wait for the contractor to contact u, then he will go thru' everything u wrote down on the list (go to ur unit to walk the gnd) , they wan u to show them the actual defects... then they will say when and when they will start to fix... but hor usu. not accurate one... they got alot of excuses... I've been thru' all these before... must keep chasing them...call them, bug them... somemore there are more than 1 contractor, 1 electrical stuffs, 1 for general works, one for metal, and 1 for sanitary... wah... chase them 1 by 1... sianz...