Suwanti Tan
Members-
Content Count
74 -
Joined
-
Last visited
Content Type
Profiles
Forums
Gallery
Everything posted by Suwanti Tan
-
Potatoes: Thanks! Sitiosman: Me and Fiance design the house ourself. However the Contractor did give us quite a number of good suggestion that we then use for our house. I'll PM you his contact. Personally, i feel that using contractor to renovate the house is much more cheaper. But, of course it will be good if you have what you wanted for your house in mind.
-
Future Kids room / current study room: the shelf is installed, it is at above where the study table will be placed. TV in our room is also installed!! Last items that the renovator will do: 1. Secure the glass railing on the stairs (Thursday/Today) 2. Retouch the wall paint (Friday) 3. Clean the house (Friday) 4. Re-varnish the parquet floor and timber stairs (Saturday) And the handover will be on Tuesday Morning, 07 August 2012. Cant wait!!! I will updates all items that we purchase for the house as well. Keep on checking the T-Blog guys!!! So Excited!!
-
Here are some updates on the house!!! Our stairs glass railing is up, however need to wait for the cement to harden before they can secure it. All our tabs also installed and in working condition Parents bathroom, accessory is installed
-
Hey Casa, u ready to move in? I cant wait to see your house (The final product with all furnitures)
-
Casa: got long meh? i posted on 21st July leh... haha, only 9 days... Just hope that the furniture match the house. cross my fingers....... I'll update again ya. Thanks for following my T-Blog
-
Our Living room TV console with small feature wall to hide all the cables. Our small small and humble sound system. haha The feel of the living room Till then.... have a good day everyone!!!
-
Parents BIG BIG Wardrobe Parents Bathroom Ahh... this is the curb for the newly request shower curb with glass door. They will install the door on Monday.
-
-Master Bathroom: With the solid top installed. It is ready!!
-
- Kitchen area: The kitchen is ready to be used. all the solid top is installed. The hood, hob, sink, microwave and oven is all working fine. I love how the kitchen look like, white and wooden tone. simple yet cozy. I'll stay there whole day to cook!!! Look!!! My breakfast table with magazine holder!!!
-
Here you go my readers... Below is the picture updates. The house almost ready, and Mom out of sudden wanted a shower curb and a glass door. Hence we beg our contractor to help us. We left with parents bathroom shower glass door (the curb is ready 2 days after we beg him!!! so fast and efficient!!) and our stairs glass railing. Repaint all the walls, revarnish our stairs timber strip, parquet floor and clean the house before the curtain and furniture come in. - Dining area to kitchen door: I personally choose the light and i love it!!! i think it will suit our dining set perfectly - Master Bedroom: Thats the bed!! we leave a small gap between the side table and wardrobe. As per my fiance, he wanted to put a coat stand there. and between bed and wardrobe we will have enough space for baby cot in future - Master Bedroom TV Console: our hanging TV console with 2 drawer at the sides and 2 open top to bottom cabinet
-
Thanks alot Potatoes, will be updating the progress soon!!
-
- Parents Bathroom: The area where my fiance's mom choose the tiles and match it by herself, and it turns out nice... The shower, wc and sink up. Left with solid top and the cabinet. - Our Hope soon to be Kids room (Meanwhile: study room): We only need a simple wardrobe in this room, coz we dont know what our future kids will like. I'll update again soon!!!
-
- Master Bathroom: Bathtub is installed, Jacuzzi is ready, wc installed. Left with the cabinet, sink, solid top and mirror. - Master bedroom: Wardrobe is ready, but without the door. The rest of the thing still in progress - Parents Room: Bed head specially designed to be thick to avoid the trunking above head (due to feng shui). 2 small drawer below bed to keep things. Specially designed and BIG BIG BIG wardrobe (I want to have a BIG wardrobe like this too!! but too bad, it's parents room...). The tv in this room will be inside the wardrobe. so when the wardrobe open you will see tv, when it's closed, you cant see the tv. It's more or less like MAGIC...
-
- Praying Hall: This is the sliding door to our study room, which we currently use as our big storage for my fiance business usage. (The room left untouched). we only change the door to match with the whole house feel. Praying Altar, is a must for the parents The first thing you see as soon you open the door. The Praying Crystal area.
-
- Cooking Cabinet: This cabinet located just below my hob. View of my hood and hob area, with my fave stacking microwave and oven. - Living room: Basically this room is ready, except the feature wall. (You might find that this room in 3D drawing is with white wall, without any feature wall. But our contractor suggest us to put a small feature wall to hide the cables, as we have alot of cables' machine and also a small bose system to install).
-
3 More weeks... About 3 more weeks we can start to move in already. Both my fiance and me feels so happy when we visited the house. Below are the updates: KITCHEN - Washing area: with super low dish drying rack and my fave rectangle tile (even when my contractor say that using tile might make my life harder. he suggested us to use glass, but i die die also want to have tiles ). The Dish drying rack glass, separator, sink and solid top is not ready yet. - Breakfast Table and Washing machine/Dryer Area: We installed 2 pendant bulb on top of our small small breakfast table. The breakfast table is not ready yet. But the white full length cabinet to keep all the washing detergent is ready.
-
Interesting... I love that tile on your bathroom!!! Creative work. How i wish to have Scandi and Raw feel in my house.
-
Hi HappyMommy, i had just PM you the contractor details.
-
We also change the BIG BIG pipe coz it's old and leaks! We will cover all big pipes with cabinet Our Kitchen and Dining area separator Wish to see everything with the cabinets already!!!! Oh ya, we bought all the LED light for the down light and the cove lights.
-
Kitchen Area Dish washing area with my fave tile!! Washing machine, Dryer and Fridge area Cooking area with my fave tiles!!!
-
Our stairs, ready for Parquet steps and afterwards installation of the glass Part of our Dining room and kitchen with common bathroom Dining area
-
Part of Future kids wall Our Parquet floor is here!!!!! Oh yeah!!! And It's UP Up UP!!!!
-
Our Master Bedroom, the partition is used to keep all the wires and wardrobe wall Part of Our Master Bedroom Our Master Bedroom's cove light is done too!! Future kids room (There my beloved HTB in white!!!!) Future kids room (the partition is used to keep all the wires and wardrobe wall)
-
Hi, Thanks for your reminder. Too excited about the progress when i visited the house and automatically forgotten to take the picture. Ok, here you go... The renovation work progress' pictures... Living room (My seatee wall at the window area is up, the cove light is done too) Our small storage below the stairs (will install tictac door and painted same color as our wall) Our beloved Master Bathroom (The bath tub is installed and it's working already!! Waiting for the bathroom Glass wall and door to be installed) Part of our Master bathroom (Waiting for the WC, sink and cabinet to be installed)