Hi All, Need your quick advice for the quotation that I got from 1 ID. But after I reviewed it, seem like the quotation bit ridiculous especially on payment term and it's not negotiable for the term. Anyone has experience to build new brick wall for 2.5 meter length? He quoted me $5,200 for it...... Is it so expensive just for 1 brick wall? Thanks for your help.... Demolition Works - $2,800 Supply & Lay 30cm x 30cm for Kitchen - $2,800 Cement Screeding whole wall at kitchen - $1,800 Supply * overlay 30cmx30cm floor tiles for 2 bathroom - $1,600 Supply and lay 60cmx60cm tiles for living, dining and 3 bedrooms - $12,000 Supply & Construct kitchen base, shower kerd for 2 bath room, fridge & washing machine base - $500 Electrical Works (re-wiring only follow design floor plan) - $3,500 Supply & Install 2no bedoroom door with level lock - $700 Supply & Install 2no bi-fold door at 2 bathrom - $600 Paint whole house - $1,800 Application of sealer base at selected ceiling - $250 Ceiling for living, dining and master bedroom - $3,700 Plumbing (supply * install exposed water piping, and installation of basin / closet & accessories ) - $1,420 Carpentery Work Kitchen: 2ft full height cabinet in laminated finishing - $700 16ft Kitchen Top & Bottom - $4,800 16ft Solid surface kitchen worktop - $1,280 Living & Dining 6ft TV Console - $900 6ft TV Panel - $1,500 10ft Full height feature wall - $3,000 Master Bedroom - 12ft full height wardrobe - $3,600 5ft Study Table - $900 Laminated platform - $1,800 8ft full height headboard - $2,800 8ft full height TV panel + sliding door - $2,400 Bedroom: Wardrobe 6ft - $1,800 Bathroom: - Vanity 3ft + 2ft $750 - Surface Vanity worktop $400 Total = $60,100 Additional: Bedroom #2: Build new brick wall to replace existing partition (2.5m) - $5,200 Payment Terms - 50% upon signing and confirmation - 25% upon commencemnet of works - 20% of commencement of carpentery works at factory - 5% of upon completion