Today I guess they stopped work at 6 pm sharp as they are now doing the false ceiling which involves a lot of drilling and thus noisy..... Went there are 8 pm and saw the living and dining area false ceiling is already up.
-
Below is the plan of the power socket, network points and SCV socket.... I didn't put in the downlight points as it will be too cluttered...
-
Yes, everything.... but even I myself was surprised how how literally they took the work, rewiring... it really mean all wires removed.... They even removed the SCV cables and rewire from the electrical riser. One good thing is, previous crappy SCV cable is now properly done.
-
This is because I have a lot to do... All rooms with down light and network port in all rooms. Also, this is before package discount. Anyway, definitely, if you were to engage independent electrician, it will be cheaper if you can manage. If I do not 1) do down light on all rooms I will save, 26 x 46 = 1196 2) Install internet ports on all rooms, 6 x 80 = 480 3) Change the circuit board, 360 (actually this one I didn't intend to install new, just relocate but they really dismantled everything when we agreed to do rewiring). So you can see, this 3 items itself is over 2000 already
-
One month in advance to be safe for ad-hoc case...
-
Yea.... Anyway, I do like the way they do the trunking. Really try to hide it as much as possible.
-
Yea hor.... Possible also.... Macam pay corkage (dunno how to spell) fee, not to use house liquor in wedding dinner... hahha
-
Yea I know... Should be able to get at least 20% cheaper outside, but bo pian lor... schedule so tight, no confidence to manage myself. Also, I work at Loyang area and the place is at CCK, impossible to run about managing....
-
I calculated, the Variable orders is going to cost $5347! :~ Some more this is excluding the 1/2/3/4 gang switch which I don't see it in the list. Dunno how they charge or is it already inclusive?
-
Photo of electrical works... Yesterday night: This morning.... Electrical, network and SCV are mostly done... Windows installation will start today instead of next week as mentioned by ID. It seems they put another project at that is less urgent at Rumah Tinggi to do mine first.....
-
Just kidding laa.... Hmm... OK, will do something about it...
-
Never actually seen the downstair neighbour. Door always shut but can see some lights from outside compound.... The side neighbours got see. One of them, the relative came from MY and kaypoh kaypoh came in to see the lighting works.
-
Yea hor.... Maybe I should.... Can I order 4 pandan cakes from you then? HAHAHAHAHA
-
Dropped by later and the most senior electrician, his assistant and one bangla still there working. He said need to finish by today so that false ceiling work can begin tomorrow by another team. Seeing that they have not eaten, went to tapao food and drinks for them.
-
Value Of Executive Condomeniums?
beluga replied to DreamHome1's topic in HDB New/Resale Flats, Executive Condominiums
DBSS is still HDB flat no matter how they market it. So DBSS and Condo is different league. Even if you put this aside, what amenities does DBSS have? Pay premium for build-in reno? With that kinda premium, you can pay lesser with better reno. To me, DBSS is only worth looking if the location is good. -
These kind of issue should be easy to rectify. Just hack away the affected tiles, use the remaining tiles and redo it....
-
Though not on scale, but still must be there laa... Must be sure where got groove, This area do like this OK? Not OK? Probably drawing itself need not be actuall on site but carpenter and me definitely must be there to survey the area and discuss through. Even drawing the perspective, if got some idea throws out, but not sure whether implementable due to size or shape then how? Must be there also right
-
Looks good!
-
It is gonna take a long time as the amount of carpentry for my house is a lot. They will draw pespective design on the spot until we all agree. Also, it has to be done on site and Now no lightings yet, impossible to do at night.... Orr soh soh, how?
-
The leave is mainly for the Opennet guys. Cannot rely anyone else as none in my family is techie enough to handle.
-
So fast that before you press enter it's done? hehehe Yea, timing was really ngam-ngam ho.... It so happen it rained today, the schedule was delayed from 9 am to 10 am and the contractor guys came at 10 am also....
-
Heh.... I guess CCK is not a hot place, so less ppl read the thread.... I was wondering why mine not so many ppl reply also coz I'm also in CCK zone... Generally, BTO has bigger interests I suppose as a lot are on the same boat...
-
Took half day today to wait for the Opennet guys to come to fix up the termination point at my living room. ID coincide today to do up the electrical points since I am around. By today, all the electrical point, network points and SCV points will be up! So, since the electrical guys, opennet guys and the cosntruction guys are all around at the same time, you can imagine how packed the place was! Progress so far - Service yard tilings done - Toilet tilings done - Kitchen tilings done - Door and creation of wall for the study room done - Electrical points, done by today Upcoming - Discussion of carpentry this monday. Need to take leave again, sigh.... - Early coming week, windows.
-
Yea, I'm sure it will turn out nice...
-
The place looks very 90s.... Just like my old place. The kitchen pattern is same.