All HDB main doors must be fire-rated I think... I was contemplating to change too... Called up Yontat and another company which is wellknown in this forum but forgot the name. So far cheapest is also 1000. The will need to send to some gov body to certify 30 min fire proof for each door. Don't ask me how they certify it.... Takes 1 week to process upon ordering....
-
[quote name='yeese' timestamp='1332925415' post='704755' Wah, the suggested ceiling fan is dangerously low....
-
Just throw away all their letters.... Don't ever bother to do them any favours....
-
Dunno simi groove... I am using Supreme AC3.... dunno what kind of locking is that.
-
The broom was left behind by the laminate guys. They were speaking in heavy chinese accent, "will leave the broom here as it is useful for them"....
-
What broom? That's my transport.... hehehe.... Wah, your contractor's worker use vacuum one aa... so high tech
-
Yes, most annoying is, can see the gap between the 2 planks. My room's laminate is cengal color so, can't see the gap and it looks nice!
-
It was direct discussion with the carpenter.... Both agreed it should be boxed-up. Workmanship so far so good. Cabinet not 100% straight and aligned but close to it. Only from very close view can notice not very aligned. Hopefully it can be further rectified later....
-
Yea that one I selected the laminate one... So naturally, it's nice.... hahaha.... All rooms have it, except for MBR as the recess area in MBR is too shallow. Plan to put roller blind up to the top of the cabinet.
-
You all eng siew me laa....
-
I do like light color too... It's jsut that I find this one too pale... There is a darker tone but still light color one but it is not continuous tone type. Patchy type like parquet, some piece lighter, some piece darker.
-
Hahaha.... kam siah.... Makes me feel 0.00001% 1% better now.... Come to my house warming ok?
-
Recess cabinit cum show cabinet is not up yet....
-
Floor laminate still ok laa... Just need to train my eyes to accept it. Probably will change my downlight to warm color to enhance the creaminess of the flooring color. Dunno if this is a good idea or not.... Anyway, wait till you see the shoe cabinet.... Laminate also chose by wife one... That will be a bigger heart attack.... The pattern is moldy-moldy type.
-
Too light color can see the linings between 2 planks....
-
Kitchen cabinet assembling is also in progress....
-
Was there whole afternoon to supervise the work and also wait for the kitchen appliance to arrive from Zero. Floor laminating was in progress but completed by evening time: Picture taken this morning: Color of the flooring is too pale to my liking actually but wife wants it.... Bo pian... Need to train my eyes to accept it....
-
The Nest
beluga replied to Valerie Low's topic in Reno t-Blog Chat - HDB Resale Renovation & Interior Design
Each downlight is smelly smell 70 bucks. 30+ for the light, 30 for each electrical point, 10 for installation fee. -
Nvm, next time when you kek sim thinking of the windows, go rub the koot koot walls... It will surely make you feel better....
-
Went up at 9+ and the moment I opened the door, the odour of the glue smut my eyes so much that I couldn't open for like 30 seconds. They are laminating the room floors now. All the unassembled cabinets are also all already in the living rooms. Wish I could take a good picture but it's dark and my mobile's LED light is just not strong enough. The glass panels and doors are also already up.
-
The drawer underneath the cooker is usually the casement drawer type, not the pull out type. Why? This is because underneath the cooker has piping and some depth needed for ventilation also. As such, you should spare another section for drawers. Yea, I do have another section for drawers too for my pots and pans. and plates. Those bigger pots will be put into the casement cabinets. Please refer to the drawings I did for the non-cooking washing cabinet area. For these additional drawers, I need to pay extra 120.
-
Painting is done but some parts will be repainted as I requested some part of the wall(as shown in previous pictures) will be plastered and one part of the MBR's wall has vertical gaps between 2 prefab slabs will be patched too. Floor lamination will be done from tomorrow and will take 2 days Kitchen will be up tomorrow too as well as the rest of the room's cabinet will be up on thursday. Keeping my fingers crossed these major stuff has no screw ups. Met Mae29 yesterday night to pass her some stuffs and asked her for a good day to move. She said April 9th and 11th is a good day to shift. Looks like the reno could be done by then but need to confirm with ID.
-
You should make it "Spot what's still the same"... More challenging this way....
-
Serangoon North Renovation By Defong Interior Design
beluga replied to Akitsuki's topic in Reno t-Blog Chat
Same for our case, they do full tiles first, them cabinet. same thing for floor laminate...