nichsua
Members-
Content Count
62 -
Joined
-
Last visited
Content Type
Profiles
Forums
Gallery
Everything posted by nichsua
-
From the album: 440C Fernvale Link
-
From the album: 440C Fernvale Link
-
From the album: 440C Fernvale Link
-
From the album: 440C Fernvale Link
-
From the album: 440C Fernvale Link
-
From the album: 440C Fernvale Link
-
From the album: 440C Fernvale Link
-
From the album: 440C Fernvale Link
-
Prior to my reno, i signed up with Legate at one of their roadshows at expo for invisible grilles for my place. thinking that this wouldn't be part of the contract so my ID wouldn't have the obligation to arrange for me, i checked with him on the schedule on when best for the arrangement so i can take leave, but without any complaints, he just requested i passed him the number to the person who i signed with, and days later, my grilles were installed, and like normal, i didn't have to even go down to the place to check. After which, the major work came, and our excitement gauge was extreme. Carpentry installation. Delivery of the Carpentry Installation of the Carpentry and an ingenious idea by Kenneth on how to conceal the unsightly air con ledge window, a pull out full length mirror
- 17 replies
-
- newhouse
- fromscratch
-
(and 5 more)
Tagged with:
-
From the album: 440C Fernvale Link
-
From the album: 440C Fernvale Link
-
From the album: 440C Fernvale Link
-
From the album: 440C Fernvale Link
-
From the album: 440C Fernvale Link
-
From the album: 440C Fernvale Link
-
From the album: 440C Fernvale Link
-
From the album: 440C Fernvale Link
-
From the album: 440C Fernvale Link
-
From the album: 440C Fernvale Link
-
From the album: 440C Fernvale Link
-
From the album: 440C Fernvale Link
-
From the album: 440C Fernvale Link
-
Kenneth visited the place together with us before our start of works, and the moment he stepped in, he did a thorough defects check for us and saved us a lot of time and trouble as we had no idea what to look out for,We had a couple of issues with HDB during the process of the rectification works, and due to the architectural design of our place, we were faced with numerous problems which i would point out bit by bit. Electrical works were carried out first together with the construction of kerbs for our shower areas, kitchen cabinets and washing machine area, where we faced our first issue. HDB only allowed a spacing of 40cm beside our service yard door to house a washing machine. Where do they actually sell such small washing machines!?! This point was pointed out to us by Kenneth during the defects check and whilst he was doing measurements for us. It caused us a huge panic when he pointed out the issue, and we got almost hysterical and didn't have the slightest clue to how to solve this issue. Luckily for us, Kenneth suggested running the outlet pipe across my service yard, and then concealing it up with tiles so it looks like a kerb to the other side of the service yard which has a depth of 60cm, which would allow space for the washing machine to sit in snugly, and solved the issue in a matter of minutes. Heaving a sigh of relief, we continued on with the measurements and found another issue, for my kitchen entrance, one side of the wall has a depth of 70cm, but the other side has only 50cm, we had plans to have kitchen cabinets on both sides of our kitchen, and now with this issue arising, we looked helplessly as we were on the verge of giving up one side of the kitchen cabinet. Then Kenneth suggested lengthening the wall by building up a hollow block extension and the kitchen will look just like it has enough space on both sides for the kitchen cabinet. At this point in time, my wife and i really felt grateful that we had Kenneth with us during this period, at points where the constructional error of HDB has stumped us, he has solved the issue just by looking at the space. And we're truly thankful and felt assured to leave the place to him to complete. Henceforth, once the renovation began, my wife was pregnant, and she was unable to go up to the place during the reno, and i was in the midst of a company change and was busy with training and work that we didn't have the chance to go up to check on the progress, but Kenneth was really helpful, during the progress of the works, he posted photos in our whatsapp group everyday on the progress of the work. First with the aircon pipe running and false ceiling installation. Thereafter the painting completion
- 17 replies
-
- newhouse
- fromscratch
-
(and 5 more)
Tagged with:
-
From the album: 440C Fernvale Link
-
From the album: 440C Fernvale Link