  1. This evening I went over to our new house after work and see that the capentry work is 90% done. contractor has advised that the solid surface top will up this thursday. Just hope that my house can be fully done and clean up latest by early dec 2011. I have arranged with all the suppliers to deliver the furnitures and electronic items on 15 Dec 2011 and curtains will also install by that week as well. just pray hard that we can move in our new house by mid dec 2011. following are the photos of the capentry works for bedrooms, kitchen and living room: bedroom 2 wardrobe
  2. I think the leadtime to do the curtains shld be fast - shld be 1-2 wks leadtime (also need to depends on the supplier schedule - seems now is coming year-end - will be busy). For me I have advised my curtains to be installed on the week 12-16 Dec 2011 but my wooden blinds will be delayed as materials imported delay (just hope that can do it by Dec'11). Yesterday I went to my friend hse warming - she stays in the condo..her curtains for living room and 3 bedrooms only S$1,200. your kitchen can't fit a fridge but I went to blk 269A a 5 rm unit that my contractor has done - kitchen is small but the owner still get a 2 door side by side fridge - the sink is near the windows which outside is the aircon ledge and the cooking area is just opposite the toilet...i find it so crampy.
  3. My hubby and I also like the Kotoku fan as well - we love it at the first sight but due to budget constraint and worry about the HDB ceiling issue - we have to give it up..love the fan
  4. Thanks sis. oh yeah i'm happy with my kitchen size and quite shock to see a small kitchen size for the 5 room flat (actually Sengkang Fernvale 4 room flat - the kitchen also so small - I got a friend stay there & during his hse warming..i got a shock to see such a small kitchen and pray hard that my kitchen not that small) My curtain and wooden blind contact is Shaddai-Plan (the shop is @ Simei Eastpoint level 4) look for Joseph. He charged me S$1,900 for 3 bedrooms half length night curtains with track and wooden blinds for living room (I find his price ok but some said is expensive, some said reasonable - so depends on individual - i find it ok as my living room wooden blinds already costs $800+ i have checked with other places also the same price). Maybe you can check other forumers which have cheaper price for curtains (especially those from JB).
  5. On Tuesday evening - I have went to my new house and see the reno progress and was happy to see that all the grey wall paintings are done (have taken the pics will upload soon). Window grilles **** room, balcony, service yard, bedroom 3 and aircon ledge are up and done. I have talked to the contractor (George) and he confirmed that all capentry works will be up by 2 wks time. Curtain measuremnets for all bedrooms and wooden blinds for living room have been done on Wednesday. Just crossed my fingers that all things and reno will be finished by end of this mth or by 1st week of Dec'11 as I have arranged most of furntiure delivery on the 2nd week of Dec '11. I have arranged contractor to help me get the toothbrush holder with cup for MBR and common toilet, the tempered glass for holding the shampoo and shower gel in the 2 toilets and L-shape storing rack in the house shelter. After spending big $$ on reno and furniture - pocket already big big hole but still yet have things not yet buy..nvr ending shopping stuff..lucky have sponsor for some household appliances and furniture..otherwise really big headache..hehe
  6. Attached the floor plan drawn up by the contractor (not 3D one) but there is some changes to the TV console feature wall, shoe rack and house shetler feature wall pattern.
  7. Hi reine, welcome to the RT . where's your new house? is it punggol sapphire?
  8. balcony (one of our favourite lighting) wall lamp for buddha oil painting ceiling fan - fanco ffm6000
  9. last friday, contractor had instructed the electrician to do up all the lightings for the whole house and painting has been done for the whole house except service yard and certain walls of the house in grey colour still yet to paint. all lightings are simple and transparent colour as hubby don't like fancy pattern or lightings. main door entrance (false ceiling downlight) kitchen bedrooms passage way
  10. thanks bro. oh yeah have done lotsa shopping but still got things yet to buy..nvr ending purchase
  11. false ceiling with the tv feature wall another false ceiling for cove lighting at the sofa area false ceiling for downlight IMG]http://i1208.photobucket.com/albums/cc371/sccy2/SDC10837.jpg
  12. i have gotten the rinnai hob, hood & built-in oven from the renotalk forumer zero (jerome)
  13. forget to mention that kitchen i got do a 4ft table fixed to the wall and top cabinet - FOC by contractor
  14. Besides the package of $11,388, i have also got the contractor to do the following with the additional of approx. $12K: - 10ft kitchen cabinet & 5ft solid surface for sink side - living/dinning & passage way fasle ceiling c/w foyer - electrical works ****/dinning f/c & foyer - masterbedrm toilet install 10mm fixed panel temper glass c/w shower kurb - masterbedrm toilet install cabinet c/w mirror at basin side - side install 1no. wooden frame c/w laminated at kitchen entrance - living install tv feature wall & tv console (6ft) - masterbedrm & bedrm 2 bay windows install fixed panel laminated finishing - balcony and service yard install aluminium grilles - masterbedrm install computer table l-shape 6ft & 6ft top shelving - bedrm 2 install study table 4ft c/w wft top cabinet - main door entrance install 3ft shoe cabinet c/w seater - install feature wall 1 side for hsehold shelter
  15. Below is the list of thingy that i am getting the contractor to do: Package of $11,388: Designing - perspective drawing by dedicated design team - conceptualise space & furniture planning - detailed floor plan layout Masonary works - supply & construct cabinet base (50mm ht) - supply & construct fridge base with tiles finished (50mm ht) - supply & construct machine base with tiles finished (50mm ht) Plumbing works - instllation of inlet & outlet piping for washing machine - installation of inlet & outlet piping for kitchen sink - installation of water heater - installation of 2 sets of toilet accessories - installation of kitchen sink - installation of kitchen tap Window works 150ft - supply & install aluminium window grills for whole unit (NA/BA) Electrical works - supply labour to install ceiling lights by HDB original light point Painting works - to paint all walls up to 5 no. colours (ICI / Nippon paints) - to paint all ceiling (white) - to paint all sewerage pipes - to paint all doors, frames & main metal gate Capentry works - supply labour to install cooker hob & hood - supply & install laminated kitchen cabinet both top & bottom (23ft) - supply & install 1 set of glass panel door - supply & installation of solid surface top for kitchen (13ft) - all internal carcass & panel doors (solid plywood) - ABS trimming for all door panels Capentry works for bedrooms - build-in wardrobe with laminated solid plywood & sliding door for all rooms (5ft) - build-in wardrobe with laminated solid plywood & sliding door for Masterbedroom (6ft) Ohers - professional project arrangement & coordination - acid wash for whole unit - supply labour to submit HDB application for all renovation works - workmanship warranty for 2 years - supply and lay protection sheet
  16. Hi Bro, thanks for the greeting. I will try to bring my drawings to office and scan (not 3D as my contractor always said he is not designer - can't draw 3D drawing - he only do up a simple one for our viewing). Anyway till date - We are still happy with the work being done now waiting for the capentry to finish to see the capenter quality work (so far I do like the capenter work as per I see from the show house in another unit (5 rooms) at my opp block). I will try to uploads more pics soon..(still trying to figure out how to uploads pics/videos..hehe
  17. oh yes, we have a nice and big garden - my kids are so keen and excited to see such a big garden..hehe
  18. i'm trying to upload a video but can't - anyone can teach me how to do so. thanks.
×