Everything posted by muska1119

  1. Aya there is an inspection by hdb officer be4 handover.. He will let owner know what to fix.. Like my old hse, we are asked to fix window stopper cost around $100+ .. then need to submit receipt to town council n hdb. They are strict in this
  2. And wats the size of sofa especially the length.. We hv the same floor plan and I found the living rm size is quite small to take in 3m sofa.. But most sofa r abt this size
  3. Aya, Hmmm for Once I thought Albert is your direct upstair neighbor? He seemed so hot on issue? Haiz I also hv a leaking issue to spent $ on.. Old hse is really a lot of trouble
  4. Day 9 27 March Tuesday Both toilets tiles are done, kitchen floor tiles are also done Hub rushed home to meet hdb officer for water leaking issue at MBR aircon opening.. Wood frame already rotten.. Which means another hole on our pocket.. Seek Help from ID Cyrus, he offered to work on Aluminium frame which helped us save some $..and never will worry of water., hopefully won't cost so much cos wood one likely to cost 400-500 The trouble woodframe My favourite part of the hse, grill removed, window changed at service balcony.. And the bottom opening which tend to wet when it rains is fix with sliding window.. The sliding window look so neat. Found a tile which doesn't look good, gonna highlight to ID tomor..
  5. What's the reason? Make me worry .. I hv plastering for whole hse. Your sofa look very nice, where did u get it and how much?
  6. Yup definitely picking up.. I see urs even faster , contractor work extensively during weekend also
  7. I thk I need to rub my window better, bit yellowish on the aluminum rails hah
  8. 2 big drawer for 120 ? Not bad .. Then I can hv a few more heh Think look nicer w more drawer
  9. Yes did made some diff but becos of this extra cost for plastering I didn't change the window.. Still sob over it..
  10. Did u get the soft closing supply fr carpenter or buy own ?and top up for additional drawers? I plan to put drawers underneath the cooker hob for easy assess of pots but read there will be ex for heavy weight
  11. Day 8 26 Mar Monday.. The tiles for both toilets are up, window grills fix and kitchen window are change.. Love the hor window grill at least don't feel like staying in jail.. We survived past 8 yrs at old hse without grill with very young kids .. Sure will take some time to get used to it again. The toilet tiles didn't manage to do 2 tone.. Oos again.. Can't see clearly if the joining are perfect as we got there late.. The workers put this type of steel at all edges of hse be4 plaster.. Super nice after effect
  12. Hi can I know where u get the display stairs? How much is It?
  13. Hv to re paint also.. Got left over paint? Or top up again?
  14. Wah.. Just a wall $400??? U r too perfectonist already..but it will look good.. I see my walls now quite nice.. All the edges especially on the small window opening in bedroom which we removed the grills.. They patch till v smooth edges..
  15. Day 7 25 March We visited the hse after breakfast but no one was working. When we visit again around 3pm+. there was a Worker building the hollow partition wall to separate MBR with bedroom 2 Did a rough check on the plastering .. It was very well done especially at edges which they added the steel to get a sharp corner.. Tomorrow they will start the tiling for the toilets but the kitchen tiles oos .. Coming only on 28th..
  16. Hah... True, even we hse owner also never realize a big hole there.. The thief sure cannot find heh
  17. So u decided to top up for the paint? How much was it?
  18. Day 6 24 March Saturday; today only got 1 plaster guy working . 2 rooms are done, working on the 3rd room. Both living room and masterbedroom are full with sand and tiles
  19. Yeah really dun understand why hdb design such way above and below window are all recess area.. Don't hv any use and hv to spend $ to cover
  20. Wow your place is very 'livable' already.. All clean up. Where do you put the db box?
  21. You chosen your paint colour oredi? Which shade of white is good for wall?
  22. Day 5 23 Mar Surprised to find out there's recess above every window in the rooms which was covered up by a board.. When the cornice were tear down, the board was affected too...so need to build back the partition board... The aircon contractor Aktiff was really nice, arranged his staff to remove the aircon in the evening for plastering work.. I'm sure if we engaged gain city or best tech they would charge us extra to come so many times..
  23. Actually few days ago I also changed my Mind wanna open an opening at kitchen wall .. Cos I saw on tv program .. Looking good.. Then call him.. He also said too late heh..
×