Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Dotty8

Members
  • Content Count

    6
  • Joined

  • Last visited

Everything posted by Dotty8

  1. Uneven Bi-folded door edge that will cut hand Wall are cover with holes under air-con piping Toilet cabinet chip-off.
  2. Balcony full-size Windows leaking and bad water drainage –Used silicon but still not resolved Balcony tilings are full of silicon mark Balcony false ceiling cracked due to force on assembly the cabinet and try to seal up with silicon
  3. Master Bedroom waste pipe box up edges drop used silicon to touch up
  4. Kitchen Island solid surface full of scratches and uneven edges Kitchen tiling chip-off and cover up with paint Kitchen windows tiling - chip-off (refuse to change)
  5. It seems that it doesn't allow me to upload more photos... in my previous post... trying to post more here.... Uneven shelving and bad alignment, all shelves are with multiple raw holes from error drilling
  6. Hey there, you are not alone. I pay a total of 57K for my 5-room renovation and I am in great pain now. The contractor I engaged is Akron Interior‏ Furnishing. My kitchen cabinet is done by his partner company D& B Interior Design & Renovation. My ID name is Albert and he only shows his face initially and disappeared half-way because he screwed up in laying the network cables and lighting. So I only deal with the D & B Interior & renovation guy name ah Boon. He is totally irresponsible and did not supervise the work through out. I am sharing the defects list and photos below: Cabinets come with a lot of scratches and internal cabinet skin torn but touch up with paint. Uneven shelving and bad alignment, all shelves are with multiple raw holes from error drilling All Cabinets’ doors are uneven Kitchen Island solid surface full of scratches and uneven edges Island bottom are not cover up and leave 2 big holes Kitchen Floor uneven (Puddle of Water) – refuse to change Kitchen tiling chip-off and cover up with paint Kitchen windows tiling - chip-off (refuse to change) Master Bedroom toilet Wall (oil stain) – never use chemical wash and refuse to rectify Master Bedroom waste pipe box up edges drop used silicon More than 3 Balcony tiling are hollow – refuse to rectify Balcony full-size Windows leaking and bad water drainage –Used silicon but still not resolved Balcony tilings are full of silicon mark Balcony pipe box up cabinet internal skin torn and tear badly; again touch up with paint Balcony false ceiling cracked and try to seal up with silicon silicon to touch up More than 2 Room tiling are hollow – refuse to rectify Glass Panel Door **** room fixed the screw wrongly and uses a translucent sticker on the glass trying to cover up Uneven Bi-folded door edge that will cut hand
×