Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Rover

Members
  • Content Count

    382
  • Joined

  • Last visited

Everything posted by Rover

  1. Yup. Dat part is my dining table (it's extended frm the kitchen island). But the narrow part u see in the pic is the skeleton of the dining table. They'll install an Indian granite top over it as the table top proper.
  2. Haha.. Still got few hiccups along the way lar. Hopefully nw last phase phase oredi, will be soon soon..
  3. Toilet vanity cabinet: Testing of lights: MBR wardrobe also in progress but too messy inside to go in for photo taking. Also noticed dat all my kitchen & sanitary wares are oredi in the house, awaiting installation. Within dis week shld be done up.
  4. Carpentry started today. Kitchen cabinet & island: TV feature wall partially up: Lower portion of display cabinet:
  5. Toilet shower area (full black wall tiles for shower feature wall): Pipes boxed up: Painting and first cleaning shld be done by tml. Thurs will start carpentry works. TWO & A HALF MORE WEEKS TO MOVE-IN
  6. Kitchen: False beam for glass wall/door:
  7. False ceilings all completed. Nw painting in progress. Living room: * unevenness of the false ceiling at TV feature side due to the unevenness of the actual ceiling. No choice. MBR:
  8. Juz came back frm Cellini. Ordered the sofa n bedroom set frm Cellini le. Topped up $100 for a better/firmer mattress. The mattress they giving in the package is selling at $600, while the one I chose is $1200 (orthopedic masters quality). So worth it to juz top up addn $100 ☺ Color scheme choose grey fabric over black PU for both sofa n bed (to hv a uniform scheme). Also topped up $190 for the coffee table. Yest also confirmed my blinds. Will be using full white PVC (timber alike) blinds wif black strips:
  9. Ya.. I luv the sofa. Gotta do some space planning to ensure it'll not be too crampy..
  10. Ya it's abit narrow cos of the pipes. Dun wanna hv trouble wif hdb so I din do any 'mod'. Kekeke.. Din really measure but hv to tilt body a little bit to walk thru. Actually still ok cos the two boxed up are not directly opp each other, ie at an angle. Next time take better pics so dat u understand wat I meant
  11. My aircon trunking gaps were patched up using plaster:
  12. Gaps at aircon trunkings plastered: Toilet boxed up:
  13. False ceilings almost done: Cosy corner cum balcony ceiling & false beam: * glass wall & glass door will be installed soon. Aircon compressor ledge boxed up:
  14. Eh? Thot I saw urs look like Blanco?
  15. Can be done lar.. I oso did it Its the space planning datz impt.
  16. Wld vy much wished for a Blanco but reno budget vy tight oredi.. Since I'm doing under-mount, might as well spend lesser on another sink which is cheaper but yet ard the same durability/look.
  17. Changed hod cos the initial funnel of the hod can't be fabricated in time for installation:
  18. Getting Samsung SH5230 digi lock: Water pipes done: False ceilings in progress:
  19. Copy the IMG link frm photobucket, not the direct link.
  20. Go to Qoo10 (former GMarket) n search for dolce gusto. There are a few different stands to choose frm.
  21. Rain shower (the square one at the centre): * will be changing the hand shower to the above design. Original hand shower too small n looks weak.
×