Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

ncsl999

Members
  • Content Count

    67
  • Joined

  • Last visited

Everything posted by ncsl999

  1. Hi ynwa, Your place is super nice, if you dont mind can you email me your quotation from your ID too.. my email add: ninacsl@gmail.com Another question, is that your toilet all the pipes are conceal.. are they already conceal when you bought the place? ncsl999
  2. Hi cjred, My reno also started abt the same time, your ID work seem so fast .. while is stalling here and there haiz .. sad...
  3. Hi Sleek, Thanks for confirming the matter, but I went to Ikea yesterday and looked hard.. not all but most of the cabinets have either veneer trim or ABS trimming.. the finishing is pretty neat & nice .. not to mention , they feel smooth running my hands on them.. ncsl999
  4. Thanks for sharing your advice, I will have monitor more closely and see if they have sealed every corner or not.. I hate insects or bugs nesting inside them... OMG ...
  5. Some House items bought: Lucia WC Pozzi Tall Basin Mixer for MBR MBR Toilet Basin Dinning Light - Eglo Oxana
  6. Continue air-con trunking pictures: My living room ceiling fan wiring casing is not straight as compared to the old wiring:
  7. Air-con trunking continue:
  8. As mentioned earlier: The Air-con trunking pictures (sorry I took them during night time so the quality not too good) Can anyone tell is this normal .. for such holes & gaps?
  9. As for the kitchen: I will using the Blum tamdem box plus.. Got them Kiang Sing Hong (upper bukit timah) also got the silicone 168 which is better quality one with anti fungal
  10. After 6 weeks of reno, not much has changed since, we changed the false ceiling structure and now the partition is up for the study area. They are now constructing the false ceiling in the dry kitchen and toilet tiles all up.. Air con trunking done and installation of fancoils. To my Horror is that I felt that the air-con trunking is done up very poorly.. with all kinds of gaps.. I will post up the pictures later, can everyone, pls kindly advice me if this is the norm. I called my ID and he said they will plaster ... but I feel cant they do it neater and nicer .. instead they broke a BIG hole is my common toilet very nice tile.. Hopefully painting and pipping work can start next week.. As of now we are way behind the original schedule (Haiz target completion date suppose to be 26 Dec 2011) (
  11. More info: Tiles: Soon Bee Huat Laminate: Jennings Led Lights: From China Kitchen Appliances: Hood: Hobz Island Hood Hob: Rinnai 3Si Oven: Rinnai Oven - RBO-7MSO Fridge: Samsung Samsung Washing Machine cum Dryer TV samsung with LG sound Bar.
  12. Hi, Pls help help help Can any senior forum mate, advice me on ABS trimming, just found out that all cabinet will only have trimming on the doors and drawers and not the whole structure.. dont that will look very ugly with those black lines expose. Well the stuff are still in the ID's factory, is it too late to request to have fulll ABS trimming?? I m willing to pay for it .. does anyone knows how much will be the additional cost? Can anyone .. pls educate me why I visited some ID showroom.. the cabinet structures are all look seemless... joint...they are laminate too... I dont even see the ABS trimming on them.. they look just like a full pieces with no joints? Regards, ncsl999
  13. MBR toilet Wall Tiles up: Common Toilet Wall Tiles coming up
  14. Reno progress after one month - progress is slow for the past few weeks. False ceiling structure: False ceiling or L-box at room: Living Room
  15. Conclusion the most part of the false ceiling needs to be taken down and changed design. My Id guy: Alvin nearly faint when we told him to tear the false ceiling down...
  16. Reno progress delayed due to false ceiling issue at the living & dinning area. The stupid ceiling is lower by 3inches .. than other areas of the house, hence after the false ceiling is up the whole living & dinning is so much lower than the rest of the place.. so now got a unbalance view from the living to study and kitchen. As I have done most of the layout sketches myself .. which includes all the 'Needs" of all the family members. Below are the changes: 1. I will be hacking away the store room to give more space to the MBR. 2. Mother inlaw says Toilet inside Kitchen no good for feng shui. Anyway we have overcome this problem by create a false wall using hollow block to separate the kitchen area from the toilet. I will posting only manual drawn skecthes as my contractor cum ID does not provide 3D. So we have just imagine hard... god help us hee hee
  17. Hi Ronald, you are r already on my friend list :))

  18. Tried to contact many ID at the expo, non came back with a quotation. Finally found an ID cum contractor which can match my budget to revamp this 18 yrs old flat. My id is Alvin from Matrix Concept. Will continue to post most pictures .. as I have not the time to load many of the reno .. picture .. The reno is now already a month and all floor & wall tiles are up... ncsl999
  19. Kitchen to common toilet Living room
  20. Reno Progress - After 1st week Front door Living room MBR Toilet MBR
  21. Before: Entrance into Living room: Living Room: MBR
  22. Nice nice pictures & work ncsl999
  23. Common Room1: Common room 2 Common Toiet:
×