Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

gregina aka cpl

Members
  • Content Count

    16
  • Joined

  • Last visited

Community Reputation

0 Neutral

About gregina aka cpl

  • Rank
    Bronze Member

Previous Fields

  • Gender
    Female
  1. Thanks The Systemind not cheap...abt 5k+. But their installers quite pro and experienced, they made sure all the gaps are aligned to each other. So the end product swee swee!
  2. Common toilet Light we bought from IKEA for MBR toilet...guess what, it's installed wrongly Living room downlights. Others which are up! Kitchen sink + solid surface top TV console wallpaper Dining area wallpaper Okie...that's abt it. Think we're about 80% done for reno....
  3. Lights up! Foyer light Kitchen light Service yard light MIL's room light Passageway light
  4. 7/7/07 - Good day to buy bathroom accessories! haha....j/k. Anyway, bought almost ALMOST the whole set of accessories (ie toilet paper holder, toiletries holder, etc etc). In total, we spent $500+ at Sim Siang Choon on accessories for both toilets. Then ID took us to Goodrich building to look at wallpapers. Then also, to decide on the colour for our CRESTO solid surface top. At night, we pop by Ikea to see if there are suitable towel rail for our common toilet (need 50cm or smaller). And....we found it! hahaha....so cheap...only $6 :X hopefully it won't rust too fast tho... 9/7 - Decided on the design of our grilles. Sat down and discuss what wallpapers to put at our dining area and TV console area. Shortlisted 2-3 designs, then pass over to ID for his opinion. Hmm hmm...hope it turns out nice With the above, all pending confirmations are done liao....hopefully, when we go down this weekend, the house will be almost done
  5. Pics of those items we planning to buy or the house? The house nothing much to take leh. items wise...haha, already too tired from walking when we confirm and it's delivered, then will take and post ba Yesterday went Ikea for shopping. Spent abt $350!! Bought the following items: - 60cm long mirror cabinet (for common toilet) - 80cm long mirror cabinet (for MBR toilet) - 3 bags of drawers stoppers (similar to blum system) - 2 bags of kitchen hooks - 80cm long kitchen rail - 60cm long kitchen rail - 2 tier spice rack - 1 towel holder - 1 toilet light - 2 paper lights for hall and MIL's room + accessories - Wastebin with lid + the side hook to hook it on the door
  6. Updates to reno: Ceiling works done. We had some discussions over the 2 curtain pelmet in our MBR. errr...looks extremely weird and unsightly leh....but ID assured that it'll be ok once the curtains are up. hmmm hmmm.... Sat went down for a short visit @ 4pm. To our surprise, 2 workers were there. heh heh...one doing the bases for our cabinets and stuff. The other??? No idea leh....mabbe it's the carpenter ba? Coz we saw some cabinets lying on the floor + our glass backsplash! so exciting! Our walls still unpaint....according to the schedule, supposed to have base coat and 1 coat last week....but at that point in time, we still have not decided on the colours. ID informs us (at the last meeting), the painter will be painting the base coat supposedly on 19 June...err...but the walls are still white leh O.o Updates to furnishings: Bought the fibretanks for our planting-cum-fish tank area....$800 gone ... Bought 2 tower fans @ $148 each (Best Denki). Finally decided on our hob-$380 (Fujioh) and hood-$540 (Cuizino). Gonna order them from Admas during this week ba. Laundry sink- $399 and tap- $75 paid and will be delivered mid July (Hoe Kee). Kitchen sink-$188 and tap-$98 + chopping board-$45 will be getting from Sim Siang Choon (Oliveri). 1st bedsheet set-$108 from Robinsons sales. To do: Make measurements for toilet fittings. Make measurements for bamboo chicks. Decide on the mirror cabinets to buy for the toilets.
  7. Unfortunately, the piping was everywhere ard the house...coz our flat have 2 structural beams which the aircon ppl say not authorised to hack. sigh...hopefully with the false ceilings up, the unsightly piping will be less visible. Today ID says starting on electrical works. Time to buy the lights!!
  8. Finally, HDB rectify the leaking pipe and patched up the wall and tiles. Tomorrow Gain City ppl will be coming down to run the piping together with the consultation of our ID. Hmm...have to double chk the kitchen again, hopefully the wall looks as good as new. Else another delay on our reno Yesterday we sat down and went thru/update our budget. The damage estimated came up to a whooping 55k (reno + furnishings) Dunno where we gonna cough up the $$ from...guess we'll have to cut down on our furnishings. Hopefully, the $$ is well-spent on the reno....else....
  9. Clearme, it was just by luck that one weekend, we decided we had nothing to do and went down to walk in our empty lovenest... Then francaisco saw some residue of water marks (the ceiling whitewash) in the kitchen. We got worried, so informed our ID to check it out the next time he pops by. ID confirmed that it's water leak, so...now HDB is doing the retification. Our reno is going to be delayed by 1 week coz they gonna hack the top 2 rows of wall tiles and check the water pipes. well, in a way, it's a blessing in disguise. Imagine if we just done up our reno...then this happened...all our new kitchen cabinets will be gone....
  10. Hi neighbour! Just went to your blog. *whistles* Nice leh! Very classy...and I love your lights! *drools* oh, btw, mod if you are reading...hee~~ sorry, but can help me edit my topic to "Little Japan @ Punggol"? Dunno why I cannot edit previous posts leh...
  11. hey diva, I saw ur T-blog yesterday *Drools* wah....your place so chio lor....now getting a bit apprehensive whether mine will turn out swee swee not keke...but urs at the meadows right? Can't be that CMI ba.... and you shifted in liao huh? keke...yeah, must admit, everytime I go up my lovenest, there will always be some breezes Won't really sweat even tho there's no fan ard
  12. wah...got official franchise liao haha *hopz hopz* Thanks thanks. I'm also quite happy with the finishings But then you have to consider my location ulu leh + small toilet + small kitchen...haha...so more or less even out lor.
  13. Hi Krisie I think the new premium flats come with the toilets nicely done up? keke...thanks! I also like the tiles HDB gave us. It was a pleasant surprise to see that in our toilets
  14. Diva (u divasan? ), my floor is on the 8th. My ID I got reply u in SG lar. haha....next day got time, then I slowly do up my siggy... bubblepearl....heh...yeah, no wonder ur nick so familiar aiya, just come back and chit chat lar. keke...I'm also forever trying to catch up.
  15. More pics This is where my circuitboard breaker cum shoe cabinet is (need to ask ID to put in shelves FOC for us ) Walkway to rooms MIL's bedroom Study room (future baby's room) Outside my MBR wah seh!! Those from sg brides....you all real fast lor! I haven't post finish leh...no need to work huh??? mutters okie...last instalment of pics MBR - where my bed going to be Ultra-small MBR toilet (entrance view) MBR - shower area (HDB gives nice tiles, not too bad) This is how SMALL my MBR toilet is... Common toilet Oops...one more picture to go Common toilet - shower area Well, that's all, folks! Next upload will be when my reno starts
×