Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

ccube1982

Members
  • Content Count

    2
  • Joined

  • Last visited

Everything posted by ccube1982

  1. Hi bro, i'm interested in getting the V60wk thanks to share the contact.
  2. Hi, If you are an ID, please drop me a quote for the following items @ ccube1982@gmail.com, thanks. I like to do up my place start either early or mid Jun. Requirements Professional Services 1 Space Planning & furniture Layout 2 Design Consultation 3 Furnishing Consultation 4 Perspective Drawing On Carpentry Works 5 Materials & colour Proposal 6 Project Management & Site Supervision & Audit 7 Warranty With Guaranteed After Sales Service Demolition & Hacking Works 1 To hack away existing floor tiles & tiles skirting @ living, dining room & store room. 2 To hack away existing floor tiles & tiles skirting @ 3 bedroom. 3 To dismantle existing 3 bedroom & storeroom door frame. 4 To hack away existing floor & wall tiles @ kitchen. 5 To dismantle existing kitchen cabinet, stove & sink support 7 To hack away existing floor & wall tiles @ master & common toilet. 8 To dimantle existing toilet accessories @ master & commom toilet. 9 To dismantle door & door frame @ master & common toilet. 10 To dismantle living room & masterbed room cornices Sub Total: $- Mansory Work 1 Supply & lay 600mm x 600mm polished Homogenous tiles @ Living & Dining & store room. (390 Sqft) Included: -main door kerb finish -tiles skirting 2 Supply & lay 600mm x 600mm polished Homogenous tiles @ 3 rooms. (490 Sqft) Included: -door kerb finish -tiles skirting 3 Supply & lay 300mm x 600mm non-slip homogenous flooring @ kitchen (140 Sqft) Included: -Laying concealed drainage pipe for Kitchen sink. -Laying concealed drainage pipe for washing machine. 4 Supply & lay water proofing membrane @ kitchen. (Approved by HDB) -1st layer = laying K-11 water proofing -2nd layer = laying water proofing 3 in 1 cement -3rd layer = laying Non-shrink grout water proofing cement 5 Supply & lay homogenous/ceramic wall tiles up to ceiling height @ kitchen. (180 Sqft) Included: -make good defect area @ kitchen entrance. 6 To construct kitchen cabinet mortal base. 7 To construct fridge & washing machine cabinet base in tiles finish. 8 Supply & install flat stainless steel rubbish chute. 9 Supply & construct low wall to support L-shape kitchen cabinet, finished by: -63mm cement block -In tiles finish 10 Supply & lay 300mm x 300mm non-slip homogenous flooring @ both bathroom. Included: -toilet entarnce door kerb. -20mm step down shower kerb finish. -Laying concealed drainage pipe for shower area -Laying concealed drainage pipe for wash basin 11 Supply & lay water proofing membrane @ both bathroom. (Approved by HDB) -1st layer = laying K-11 water proofing -2nd layer = laying water proofing 3 in 1 cement -3rd layer = laying Non-shrink grout water proofing cement 12 Supply & lay homogenous/ceramic wall tiles up to ceiling height @ both bathroom. (447 Sqft) Included: -make good defect area after hacking @ bathroom entrance 13 Supply & lay homogenous tiles (non-slip) for 2 step staircase. Sub Total: $- Plumbing Work 1 Replacement of standard stainless steel piping. (Cold Points) 2 Installation of 2 sets toilet bowl for labour charges only. 3 Installation of 2 sets toilet basin & tap for labour charges only. 4 Installation of 2 no's instant heater for labour charges only. 5 Installation of whole house accessories for labour charges only. 6 Installation of 1 no'stainless steel kitchen sink & tap for labour charges only. 7 Supply 1 no' stainless steel kitchen sink & tap. (Optional) 8 Supply 2 no's of toilet bowl (water saver), basin & tap. (Optional) 9 Supply & change main sewerage pipe (To be approved by HDB) 10 Supply & install 1 no' wash basin in kitchen area (Optional) Sub Total: $- Door Works / Window Works 1 Supply & install 1 no's 3ft x 7ft solid nyatoh main door, finished by: -main level door lock -stainless steel door stopper -eye viewer -non fire-rated finish 2 Supply & instal 4 no's solid nyatoh bedroom door frame according to existing doors' measurements 3 Supply labour to re-install 4 no's 3ft x 7ft solid nyatoh bedroom door, included new: -door lock -stainless steel door stopper 4 Supply & install 1 no's 3ft x 7ft wrought iron main gate, finished by: -Non Galvanize finish -Include lock 5 Supply & install 2 no's aluminium frame bi-fold door in powder coated & acrylic glass finish @ both toilet. 6 Supply & install Silver aluminium sliding window in embossed glass finish @ living area. (3 or 4 way track) (46 Sqft) 7 Supply & install Silver aluminium sliding window in embossed glass finish @ bedroom 3. (3 or 4 way track) (59 Sqft) 8 Supply & install Silver aluminium casement window in embossed glass finish @ kitchen. (3 panel) (32 Sqft) (Optional) 9 Supply & install Silver aluminium casement window in embossed glass finish @ master bedroom. (2 panel) (18 Sqft) (Optional) 10 Supply & install Silver aluminium casement window in embossed glass finish @ bedroom 2. (2 panel) (18 Sqft) (Optional) 11 Supply & install Silver 48" x 24" adjustable louver window in wire glass finish @ master & common toilet. 12 Supply & install 1 no's aluminium overhead sliding door in powder coated & acrylic glass finish @ kitchen entrance. 13 Supply & install tempered glass shower screen @ master bedroom. Sub Total: $- Misc. Work 1 To paints whole unit wall & ceiling using Nippon all-in 1 paints. (Unlimited Colour) Included: -main door frame = sand & re-vanish or paint glossy paints -all door = sand & re-vanish or paint glossy paints -all door frame = sand & re-vanish or paint glossy paints -whole house severage UPVC pipe = paints gloosy paints -To touch/plaster up where necessary whole unit wall & ceiling defect area. 2 To lay protection sheet @ living room & all bedroom. 3 Chemical wash & general wash for whole house. (move in condition) 4 Uplifting sand & material & debris fees. 5 HDB permit handling Sub Total: $- Carpentry Work 1 Designed & fabricate kitchen cabinet C/W drawer, cultery tray, in laminate & ABS trimming & soft closing system finish by: -Top Unit (12ft) -Bottom Unit (15ft) -Solid surface worktop. (15ft) -Stainless steel disk rack -1 panel frosted glass with aluminium frame -1ft box up piping tall unit 2 Supply & install 1 x hob unit 3 Supply & construct wardrobes @ 3 rooms. (Optional) 4 Supply & construct shoe cabinent. (Optional) 5 Supply & construct TV console. (Optional) Sub Total: $- Electrical Work 1 Supply & install new DB switch board (12 way) 2 Rewiring of whole house (Optional) 3 Run 2 x light point & reinstate the existing 8 light point 4 Reinstate 9 lights. 5 Run 3 x SCV points 6 To reinstate 2 tel point 7 To install 15 double points 8 Supply & install Inverter Aircon for 4 rooms with power points & piping works. (Optional) Sub Total: $- Other Work 1 Supply & construct false ceiling for bedroom passage way. 2 Supply & construct L-box for living room & 3 rooms. 3 Supply & construct L- shape rack in store (4 levels). Sub Total: $- Total Amount Quoted: $- Less Discount: Total Amount: $-
×