Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

adamteo

Members
  • Content Count

    26
  • Joined

  • Last visited

Everything posted by adamteo

  1. All done and staying there liao...need to update pics again.
  2. Nearly finishing...last stretch...will post pics when all done...
  3. hmmm....it is actually maroon/pinkish red.
  4. Wanted to reveal when most are done to be fair to both parties. So far so good. Our ID is Shawn from http://visualdreams.com.sg/
  5. Kitchen Cabinets coming 29 Apr....now the real work starts.
  6. Our toilet bifold doors. Toilet Shower Screens
  7. Hihi, Which BLK u at? Our ID is Shawn from http://visualdreams.com.sg/ Have not been updating for a while. As of now, window grills are up, doors in, all more or less done....waiting for carpentry coming in end of this month. Will post some pics soon....
  8. got another id to do for me. so far so good. see my blog here. http://www.renotalk.com/forum/topic/64809-2nd-home-bto-segar-vale A bit lazy to update liao....
  9. mine is at carpentry stage now.
  10. Did cabling for my place to take advantage of the already ran cat6 phone cables. Busy day today. Lights and flooring all done up.
  11. Hi Makanology, I am the hubby and was the one whom suggested...haha...more of maroon.
  12. Foyer area (imagine the altar flipped and facing the door) Living Area (a lot of amendments here) Master Bedroom (Mostly ok) My boy's room Kitchen (Slight additions)
  13. Our reno officially started on 14 Mar. As of today when we checked. All the tiles are done, pulling of lighting cables more or less done. Kitchen water pipes/gas pipes, base all done. Service yard tiles settled. Will post some pics when back home tonight.
  14. Over the 2 months since Dec 2013 to Feb 2014, think we met up with more than 15 reno id/contractors. Most of them tried to push their standard package and design which we were not keen. We had our ideas as to what we want, there was no theme...just practicality, some fengshui criteria and utilizing every bit of space for storage. As we did not take the standard tiles, doors, etc. Our quotes based on our requirements or the ID' ideas range from $28k to $55k ! We ended up signing with the first reno ID whom we met and intro-ed by a fren as we felt we can "connect" with him and felt comfortable with. Even my kid loved him. When a small kid likes a person, it shows a lot. Will arrange my 3D pics and be posting soon.
  15. Even though this is my 2nd BTO and 2nd renovation. There is always something to learn. Learnt a lot from the seniors in these forums and guess it is time to pay it forward. Keys collection was on 11 Mar 2014. Started sourcing around for reno id/contractors since Dec 2013. Practically emailed to nearly most of the recommended reno id/contractors within renotalk. Totally swarmed by quotes and emails and calls. Ended up it is about our budget. It is not exactly going for the cheapest per se but with one whom we can talk to and relate to. Here is the floorplan as per usual. 5 room BTO. More updates in a bit.
  16. mine is moving fast and furious...haha....am at Segar Vale also.
  17. Hi, may I know the price for Mitsubishi Starmex Inverter system 2?
  18. wow...u are quick...haha...I am most prob going to confirm my ID this week.
  19. My facebook name is the same. Most are all done...now at certification stage.
  20. We are also going to be at Segar Vale.
×