Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

veronehoo

Members
  • Content Count

    62
  • Joined

  • Last visited

Community Reputation

0 Neutral

About veronehoo

  • Rank
    Silver Member

Previous Fields

  • Gender
    Female
  1. http://singaporemotherhood.com/forum/threads/wts-preloved-l-shape-sofa-and-square-table-with-stools.105459/#post-7199171
  2. Thanks for viewing P/S: Experience with my contractor Sam is a pleasant one (so far, haha...). He is very patient and responsible Although there was no impressive 3D pics/layout plan/project management schedule etc, we managed to put our ideas together and came out with the design and layout. He will give constructive inputs and never fails to came up with solutions. Feedback or queries twere promptly dealt with. Workmanship satisfactory.
  3. The tinted mirrors are up, marking my renovation is coming to an end (pending kitchen & some touch-ups by contractor). Showing some before and after pics
  4. Kitchen glass backing is up however unsatisfactorily done: The two adjoining pieces are also uneven (where the white line is) Some edge caps are too wide which I find it's unacceptable even sealed with transparent silicone. Paint chipped off and the installer fail to check before mounting, leaving behind a defect mark behind the glass. After talking to my contractor, he will get the supplier to re-do the entire glass backing.
  5. My MBR wc is just like urs, in between boxup wall and vanity cabinet, also no space for toilet roll holder at the side of wc. In the end, we place the toilet roll holder infront of the wc, better that taking the risk of a twisted back.. Haha...
  6. Noticed ur toilet roll holder is right behind, isn't it inconvenient after 'doing business' must turn back couple of times?
  7. It is not shaky at all. I am a happy customer
  8. Curtains MBR Night View Day View
  9. Curtains Study Room Before view After view DS's room
  10. Curtains Living room Before view After view Day view
  11. TV area @living room. Luv the floor lamp from Ikea. TV console Noticed the raffia string dangling from the ceiling? That is reserved for the opennet cable installation which will take place between 22 Aug 2011 to 10 Sep 2011 (too bad wasn't able to arrange installation during the renovation period) Will need to buy some decor item to place on the floor beside the speaker to conceal the cable. Still waiting for the following work to be done by this week. 1) Mirror for the living room 2) Kitchen glass backing 3) Curtains
×