Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

nobelleng

Members
  • Content Count

    39
  • Joined

  • Last visited

Community Reputation

0 Neutral

About nobelleng

  • Rank
    Bronze Member

Previous Fields

  • Gender
    Male
  1. This week has been the busiest week I ever had so far... 1. Coordinating my delivery of appliance and furniture. 2. Last minute source for storeroom rack. 3. Brought all curtains and rails. 4. Triple clean my house. <<< this job will kill... 5. With help of my ID Wee Kuang, he help to mount all my curtain rails. 6. Packing all belonging. 7. Throwing all unwanted stuff. 8. Schedule mover to move all my stuff. But, I will say this is all worthwhile.... finally i going to shift my stuff in on Friday and officially stay in at my own house , this Saturday onwards.....yipppeeeee
  2. Hi Dreaming, I don't think my 5rm is any bigger than yours. I see your floor plan, your kitchen is larger than mine. Probably I have yet to have my furniture in place so the place seem kind of spacy. Sometime our eyes play trick on us. I did not hack all my tiles, basically living floor, kitchen floor, and all bed rm floor tile is un-touch. Total reno cost including electrical is about $28k. Hmm for 3D, I will see I could upload tonight, but to me the 3D doesn't match what I have in mind, but the actual product actually match what I want. 39 Days (include weekends) started at 18 Aug. so is about there. My ID commit about 6 weeks for the renovations, but i told him as long as before mid OCT handover. Give and take cause I believe good product need times to develop.
  3. Day 39 Con't Master Bedroom Toilet View From Entrance Vanity View From Entrance Master Room Wardrode Sliding Door Installed, The design is wrong, carpenter will swap the correct one in. That's all for now. Most of my furniture will be in on 1st Week of Oct. Only then I will upload more picture. Thanks for comment and hope all fellow reno forumers all the best in renovations.....
  4. Day 39 Con't Kitchen View From Glass Door Entrance Kitchen View From Laundry Area 3rd Bedroom View From Entrance Door 2rd Bedroom View From Window with Wardrode Installed Master Bedroom View From Door Entrance
  5. Day 39 As promised by Wee Kuang, the house is almost 90% done. Although there is few rectification need to be done but nothing major. Did my own cleaning last weekend with wifey although she did most of the work I was busy measuring the length of window for curtains, cleaning the cabinet interiors. Shoe Cabinet and Foyer lighting Installed Living Room View From TV Console Living Room View from Main Door Living Room View From Room Passage Way Living Room View From Kitchen Glass Door
  6. Prody, very nice concept of your kitchen . I have the similar kitchen layout as you but did not think of the dry and wet kitchen. How about your living room? Any update sneak peek?
  7. Ejszaka, I have try the 1st day it got installed. Let it run for 30 minutes. Very good for me. Of cos max can only turn on 3 unit at one go. Even the installer say this model is good and is the one of the compressor still made in Japan. Except the blower are made in thailand. Thing to note that toshiba service warranty is subsidary of carrier now.
  8. Ejszaka, I have try the 1st day it got installed. Let it run for 30 minutes. Very good for me. Of cos max can only turn on 3 unit at one go. Even the installer say this model is good and is the one of the compressor still made in Japan. Except the blower are made in thailand. Thing to note that toshiba service warranty is subsidary of carrier now.
  9. Thanks J waiting for your reno pictures...
  10. No leh... didn't consult any Feng Shui. Just follow our heart. Feel good mean ok. Bro.. ,more pic more pic... later if got time, I will upload my 3D...
  11. Enrico.. congrat to you too Where's your place? Major overhaul?
  12. Day 27 con't Kitchen Carpentry 80% Done Shoe Cabinet (Wifey and Sis Favourite) Wee Kuang say based on current progress, by end of next week 95% works should be done. Just have minor defect need to be rectified. So far no major issue or hiccup. Mostly has been smooth for me.. except pocket having big big hole le....
  13. Day 27 Didn't have a chance to really update this t-blog. But today, my sis helped me to went down and took some picture. There is major changes.....more and more like a home to me... Master Bed Room (Me and Wifey Domain) Highlight Wall Color is Violet Bedroom 2 (My Sis Room) Highlight Wall Color is Scarlet Bedroom 3 (Guest Room or Mahjong Room LOL) Highlight Wall Color is Lime Green Living Room (Contractor Still Installing my TV console Highlight Wall Color is Mocha
  14. Bro Jacky, I got it here http://list.gmarket.com.sg/gmkt.inc/Goods/Goods.aspx?goodscode=403576705
  15. Brought an air multiplier online past few days. $71.20 include remote and shipping from S.Korea. Not sure if quality wise better than original Dyson.
×