Everything posted by amokduke

  1. Sure! Yesterday we tried jumping on the platform... feels ok. There is a lot of "ribs" underneath so it should be able to hold haha. Send you the quotation via PM..
  2. Day 13: The laminated platform for the master bedroom The workmanship for the laminated platforms are good... Found a crack in the bathrom tiles! (edit: found to be caused by electrician... in the end, the bill for the repair sent to him) Arranged to speak to ID on monday to rectify all the faults found so far...
  3. Day 12 continue 2x Ceiling lights for the study.. The KDK wall fan M40MS ($130 from KONG TAI TRADING) is positioned to blow into the walk-in wardrobe too.
  4. Day 12 continue... Platform Bed for the master bedroom: The KDK Ceiling fan M11SU is installed properly here. For $180, it is a good buy. Will throw a king-size mattress on top and that's it! no need for bedframe. Ceiling lights for the walk-in wardrobe: The individual light bulb can be adjusted to shine where light is needed. The view of walk-in wardrobe from inside the master bathroom Matching ceiling light with the master bathroom tile highlight
  5. Day 12 continue... T5 lights outside the TV room... Laminated platform inside the TV room. =) KDK Ceiling fan M11SU "Silver" ($180 from KONG TAI TRADING) for days when aircon is not needed. Too bad the electrician didn't install it well. The fan is a bit off center and gives a "scratching" sound everytime it spin. Don't dare to turn it on untill it is fixed. Matching Kitchen lights and service balcony lights Somehow one of the light inside the the service balcony light is not working... will check with ID tmr. Storeroom uses this "ES holder" that cost $10 only including the bulb. Cheap!
  6. Day 12: Most of the lights are up... Got all of them from lightings.com.sg Excellent services and timely delivery. They also allow me to return 2x downlight that was not used due to mis-communication between ID and electrician. Admin fee for refund is only 3% hee.
  7. Day 11: Part of the dining lights is up! Effects it has on the living room wall Bedroom2 Light DB board installed in the storeroom Floorings has arrived
  8. Master Bathroom: The curb is for the showerscreen Like the wavy 3D effect from the wall tiles... Excellent workmanship from the tilers:
  9. Study view from master bedroom: Study: (Network CAT 6 point and double power point will be installed where the wires are) Toilet view from inside walk-in wardrobe:
  10. Common Bathroom water piping: Bedroom2: (Painter painted wrong colour for the wall on the right... sigh.. supposed to remove the hook from the ceiling too) Outside storeroom: Master bedroom entrance: (The floor within the bedroom will be covered with laminated flooring) Master bedroom:
  11. Washing machine base: (Washing machine drainage is the white pipe behind) Kitchen sink drainage: Water piping for washing machine and kitchen sink:
  12. Day 10 (Water piping and lights installation) Living: Sealed entrance's skirting to be done tomorrow. TV Room: down light installed halfway Kitchen: Kitchen Cabinet base:
  13. Day 9 (1st round of painting completed) Study: Unlike the living room, the sealed toilet entrance is rather uneven... Master bedroom: Living:
  14. Day 8 (28/3/2011) The new door frame is up. (Change the door frame because the old door opens to the right; which will block the newly hacked entrance) Living... There is no trace of the sealed entrance Living another view
  15. Hi, just want to ask, "What is the difference between the copper diameter for a 9k btu blower vs a 12k btu blower (Inverter)?" If I am not wrong, Liquid is 1/4 inch while gas is 3/8 inch for 12k btu? Thanks
  16. Day 6 continue Kitchen: All the flooring is hacked away. New tiles are being laid and the base for the kitchen cabinet is in progress) Master bedroom: The view of the walk-in wardrobe through the hacked entrance linking to the study. Study: The old entrance to the toilet is sealed. The new entrance can be seen inside. Walk-in wardrobe: The view of the toilet from the walk-in wardrobe Aircon piping for the 12,000 BTU blower inside the Master bedroom/study
  17. Day 6: My ID works very fast... The progress is astonishing! Living: The old entrance to the Master bedroom is sealed already Living: Even the partition for the TV room is up already. The big lobang is for the glass panel. so that one can see the TV from the dining area. Living: The false ceiling for the dining area is up also. Living: Installers from GAIN CITY came to install piping for the house. The L-box for the TV room is also done.
  18. Day 5 continue... Master bathroom. The new entrance to the walk-in wardrobe will be hack later today
  19. Day 5 continue... Living room. Partition Boards have arrived. Storeroom with the temporary DB board. Kitchen with the temporary tap. Master bathroom. (a bit of the new titles can be seen on the left)
  20. Day 5: Today the Opennet installers came to install the fiber optical terminal (guy in purple). The terminal's cables ran along the trunking done by my ID and will be concealed by the TV wall feature/console. The friendly opennet uncle even snip off a bit of the cable to show me how thin they are. How the living room looks like now.
  21. Hee, anyway problem solved. HDB approved the plan today. =)
  22. Day 3: Master bathroom Storeroom Rewiring the house... so moved the DB board into the storeroom.
×