leeonline2011
Members-
Content Count
23 -
Joined
-
Last visited
Community Reputation
0 NeutralAbout leeonline2011
-
Rank
Bronze Member
Previous Fields
-
Gender
Male
-
Hi Aron, Can help to quote for the mitshibushi system 4? PM me, Thank
-
Hi Eric, Thanx for the excellent after sales service that you provided. Since my installation in 2011 till now, you service to me and my relatives had been great and please keep it up... Appreciate your fast response to my LED Light replacement for my ceiling fan and the job well done. Cheerss....
- 2,867 replies
-
- onsite visit
- installation
- (and 8 more)
-
I think u can consider Soon Seng Movers as what SophiaCheng had mentioned. Their price may not be cheap but I can also consider that your is also not cheap. Thus do more comparison first as most of them will offer free quotation with no obligation. For mine, I choose the cheapest one but no impressive thus no recommendation. As for Soon Seng, I think i did the research and they were well comment by sg forumers. Thus, call them and compare if u ok, I think they can do better job. Take care...
-
Can PM Me the list too. Thanx.
-
Hi pal, Glad that u move in. A vice nice vanity top u have. Finally ur reno is over and u better rest well to recoup all the effort that u have spent on this reno. It is never easy to oversee the whole renovation and u exceed the oversee more than most of us. Ha ha Time to relax
-
My Shortlisted Ids
leeonline2011 replied to deerixp's topic in Renovation Contractors, Interior Designers & Suppliers Reviews
Hi, Firstly if u need a quotation, you have to ask yourself what is the thing to be done. Most of those promotion one is standard package and definitely will result in more additional cost incur. Look for the below blog by one of our members which her post serve as a useful stuff for me to refer: http://diva79.blogspot.com/2011/03/hidden-costs-in-renovation-quotes.html All in all, u have to decide what u need to do just like me to state down the things that I want and I send the same requirement to all the ID firm and most responded cos it show u r sincere customer. If u need a copy of what I sent PM me so that u can reference it. Currently, my renovation is almost done and will be moving in soon. Will update my T-BLog once I consolidate all the pictures. BTW, u r new flat or resale flat. -
How u managed to clean so well for ur pole? Really tough on u. As for hole found at main door, is due to the renovation that caused it? How come ur common toilet change now then change? Ur initial quot nvr covered or they delay u again? Really admired ur effort and time u spend on ur reno. Take care....
-
So u engaged any painter to do the job. Hope everything works well for u. Take care and be careful.
-
Hi idealistic, Can PM me ur electrician? Thanx. Can't send PM to u
-
Hi ivy, may I have the list too. Thanx.
-
My Hard Found Home In The North.....
leeonline2011 replied to leeonline2011's topic in Reno t-Blog Chat
My Floor Plan Today is my 8th day and everything had been smooth. -
My Hard Found Home In The North.....
leeonline2011 replied to leeonline2011's topic in Reno t-Blog Chat
Indeed the search is over and now I concentrate on the reno. The next post will be my floor plan. -
Will definitely ask u lot of question since u volunteer lol To be honest, my ID really patient. Today, I told him of my new requirement to change the toilet door position. Instead of rejecting me, he explain the process needed such as reapply permit and additional cost to me and he will do it if I want. I told him to proceed and he comply to my request. Maybe more money coming to his company lah. (Ha Ha). Overall till date I can only said that he impressed me and my family with his professionalism. Cos I really got very tight schedule (to complete all flooring/tilting work by 15 June and carpentry work by 23 Jun 2011). Just a quick question how fast ur carpentry work complete? I refer from selecting of color ==> measurement ==> install. It seems like all ur carpentry is up but there is some minor hiccup tt u refer. I afraid tt I also will have to hiccup since both of us is the same carpentry. Hope u resolve ur carpentry issue soon. Take care. FYI, I also started my T-Blog which I will also upload my pic soon. Refer to below link: http://www.renotalk.com/forum/index.php?showtopic=41214
-
Finally, I decide to share my experience of getting this house of mine and also to thanx this forum for providing so many useful and valuable information in my selection of ID. Short Description of how this thing goes around: 28 Nov 2010 ===> Sign exclusive letter for selling my hse. (Mistake) 10 Dec 2010 ===> HLE approved. 03 Jan 2011 ===> After ard 8 - 10 buyers viewing, mostly insincere as offered under valuation but one sincere buyer offered slightly lower my COV and subsequently discuss with family and let go 04 Jan 2011 ===> Sign Option Period 17 Jan 2011 ===> Buyers exercise the Option to Purchase After the above, is my turn to search for hse. But my Property Agent simply very slow in searching for me due to my location requirement. A bit disappointed as before signing the exclusive letter, he claimed the searching for my flats is no problem and he wanted me to sell mine first before looking. I took his advie and I sold my hse. However he cannot find mine and keep mentioning my location to restrictive but he will try. Thus this is the mistake that I mentioning.... and I believe that we shdn't sign any exclusive with any property agent unless they can produce what u want... Just for sharing. Due to his slowness in finding my reuqirement, I decided to DIY for my buying and save the commission (To recoup my commission loss in the selling). I took a few day after work to search the HDB procedure and also search through the net for thing to look out. Surprisely, the DIY process is not that difficult if u doing research. At the mean time, I also serach the net and newspaper for any available hse that fit my requirement. I even arrange for the hse viewing myself thinking that I'm the agent. Ha Ha After a 3 or 4 hse view, I hook on to one which my family and myself think that it shd be the one and I neg with the buyer on the COV. Eventually after neg, we agreed on the amt and I exercise my OTP on 14 Feb 2011. Due to my urgency to get the resale hse soon so that I can give to my buyer, I also had to push my existing owner for the hse. He also had to wait for his buyer due to his buyer is doing contra. So, I checked with my family and with the HLE going to expire soon, I went ahead for my buying of resale first and got the first HDB appt on 04 Mar 2011 and the second appt on 15 April 2011. With my buying done by myself, my seller also pushed me for the first appt date and we finalize on 19 Mar 2011 and subsequently neg with my seller for extension (Offically as per seller) on 31 May 2011 for 2nd Appt. Wow so taxing as I have to give my existing owner 1.5mths to stay!!! Now I am stuck in between of my selling and buying so sian........... But no choice lah what thing done cannot be undone, have to manage myself and get the whole thing work lor.... Apologies for the longwinded story and let come back to the purpose of this topic. Luckily, I bump into Renotalk (thanx to the google) and found this wonderful forum with full of advices and tips. Of course have to filter yourself on which is advice and which is advertisement based on self judgement. Through this forum, I make multiple of calls to the famous IDs and also some through the newspaper for quotation and finally streamline to my current ID which I manage to click with him and thus sign the contract with him on May day. Due to my very very very tight schedule, my IDs will have to complete it within 4 weeks starting from 30 May 2011. Till date, today is the 5th day and I hope that everything will go smooth and ideal to me. Will post some pics which my wife took in the next few days.