Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

C&S

Members
  • Content Count

    49
  • Joined

  • Last visited

Everything posted by C&S

  1. hi guys.. I had sent the pm..
  2. Hi Beancurd and Ken, Had pm both of you on the quotation..
  3. Nope it doesn't include that. (cos we have no plans to do window grilles yet) And ya forget to mention, feature wall to cover the store rm is included in the quotation also..
  4. Hi Ginaor, had pm you the quote
  5. Hi Runner, Had pm you the quote..
  6. Hi , Have sent you a pm on that.. Cheers
  7. Yup we r frm 448 too.. Thx for the compliments..
  8. yup..hehe..we might be frm the same blk and same side
  9. Hi Hafiizh, thanks..yah we chose the colors ourselves.. haha.. but we might change the colors eventually to match with the living rm..
  10. yah never hack walls.. Spacious? Haha..We find it rather cramp.. the drawings not 100% accurate.. nope nvr opt for HDB flooring as well, chose our own tiles from the ID appointed contractor.. why headache from the quotes? over budget? maybe can do away from some of the non essential things..
  11. I see.. we will living very near..future neighbours thanks for the compliment, hope it really turn out nice.. nope we never hack any wall at all, didnt find a need to.. you can look for my id if you are interested.. Cheers
  12. 3D drawings continued.. (dunno why cannot show more than 5 pics in a thread, so got to continue frm here..) Another view of MBR --------------------------------------------------------------------------------------------------------- Common Rms Thinking of changing the wall colour..hmm.. ---------------------------------------------------------------------------------------------------------
  13. Hey~~ Thanks! Which blk you frm??
  14. Heres the initial 3D drawings.. --------------------------------------------------------------------------------------------------------- Living RM - The windows are not supposed to be totally full length, and the colour of the floor tiles we chose is slightly different from the one shown in the drawing.. Other than that, we like the feel here a lot.. --------------------------------------------------------------------------------------------------------- Another view of the Living RM - --------------------------------------------------------------------------------------------------------- Kitchen The layout and overall idea is there, but the laminate we chose is different from the drawings.. Instead, my wife chose a pink laminate with 3D feel..a daring decision by us.. Peter was quite shocked initially but agreed that it might turn out to be cute lets hope the final product will turn out nice *prays* --------------------------------------------------------------------------------------------------------- The other side of the Kitchen --------------------------------------------------------------------------------------------------------- MBR Might change the wall colour to match the living rm's one..
  15. Greetings Everyone~ Finally took the time to post our reno t-blog.. we got a lot of great ideas/advices ,"lobangs" and recommendations from this wonderful forum and its members..would like to take this opportunity to thanks those who given us help one way or another.. Heres our story, Got our keys on end Feb after close to 2.5 years of waiting.. quite fast we mus say.. Did a research on here, and found our preferred ID weeks later after a few rounds of selection from different firms.. After several meetings with my ID (frm Earnest Interiors) to finalise the design, the selection of tiles etc.. Our reno started today.. Here is our floor plan: Very small huh?
  16. Hey footprint, We see~~ ok thx for your advices.. will take note of them.. you mean HDB wont inform us when the cement screeding is complete? Hopefully they already done up our unit~_~ thats the only thing that is holding us back from reno..
  17. Hihi Footprint, We also from your same block hehe.. We bought the same aircon system too but we are confused when is the best time to have them installed? before all the renovation works or ? any advice? We also applied to do cement screeding by HDB a few weeks ago..but seems like no news from them Can we know how long did HDB takes to do the cement screeding from the day you applied? Thx ahead... Anyway, looking forward to see your reno progress =) Cheers~~
  18. hi Kamal, i am also from your same block love the design of your mbr and kitchen~ very good quotation you got.. cant wait to see your renovation progress~ Cheers~~
  19. hi all, can we have Mr Chew contact no? thx..
  20. Hi~~ we are interested in the group buy.. is it still on??
×