Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Devilaz

Members
  • Content Count

    708
  • Joined

  • Last visited

Everything posted by Devilaz

  1. try not to get for the brand and price. see wherethe are they suppliers or distributor companies in Singapore. They didnt have companies here but some brands need to get their spare parts from overseas. therefore the price will be more exp in the long run. then u can decide what to get. also power consumption too.
  2. Most or i should say all IDs will be given a 2 weeks time frame to settle the quotation and some wonderful drawings. If more than that i think you can drop them and kiss goodbye to them. as jt88 mention yes going to their showroom would be a idea too. but still will be good to see their current worksite too. at least u will get to see how they work how is it to be done. can flip magazines and online renovation ideas too. think of a concept which you want and then set a budget to it too.
  3. Where is it being leak? the piping area there or?
  4. happy ur inbox is full. cant send things to u.
  5. Well you can email to them first. U may leave ur contacts on the email or while fax to them. Most ID will be finish the quote in 2 weeks time. If they delay more than that you may give them a call. Still if they delay for more then 2 days u can drop the idea of going to their worksite or their shops.
  6. everything would be nice to have a black and white. since that HDB fellow change the table around and counter back to u. Did you know who is the person who you speak to? Also the time and date. Speak to him again. If cant help best is to seek advise from the higher management. Due to that person just dont bother the regualtion just anyhow state and now problems occur. who is going to pay the hacking and the tiles? That hdb fellow/ ID or u?
  7. well i can understand how you feel. as i had been through this before. still while getting quotes you will gain more on what you will know for your house.
  8. Good morning, U can try to get quotes from them and post it here. we will be able to tell you is it good or not. also please check on their materials too.
  9. Well it depends. some freelance ID will be friendly to you. Once you sign the contract they wont give will change and give you all the negative attitude. So actually all depends on luck and how firm you can settle them when things happens. There are sure to have hippcups along the way.
  10. hmmm.. werid. i have been using toshiba air-con for nearly half a year. i dont see anything happen to it. if their chance of breaking down is high then why they still sell this brand of air-con at their shop? For single unit u can get non-inverter. But for system 3 and above it will be adviseable to get inverter. due to saving more electricity and ur monthly bills too. Also for the big shops like gain city and other organisation it will be good to ask their air-con contractor wherethe is it from the 3rd party. Most of the 3rd party contractor they will just anyhow install. Some are like bengs and sengs. We as consumers spend so much and get this service. I dont think so right? If you want i can recommed a contractor whom do mine air-con to you. he is the boss and his staff are profession in it. feel free to pm me for his contacts if you want.
  11. im not sure for now as i seldom call mine friend liaoz. last time AC5 is in good hands. now unsured. anyway most brands are about there. just tat the service and their terms and condition.
  12. LG got quite a number of negative feedback. so i dont think will be good to get that.
  13. supreme wise better dont take engineering laminated. as mine friend who work in told me that. normal AC5 is already good enough. but do take note on the cost psf.
  14. Air u add me liaoz hor? got msn bo?
  15. lolx.. dont block me hor... receive and send.
  16. ermz... as i also need to hunt one too... as i feel that if got together one will be better also.
  17. not sure yet... ya, want do let u "fu dao" me also ma... hahaha...
  18. First of all, did they mention when they will finish their reno? Also u got give them a deadline? Then count from the dealine till now what things u have done for the house and also the money u spend. My renovation is delayed for at least 2 months, and the worse thing was, some of the carpentry(including main door and features) and lightings accessories were damaged during installation/due to improper installation. All the capentry how badly damage is it? As they be able to solve it? If serious damage, make them redo a new one. Not worth to cover it. For lightings, they break it they pay for it. Just wondering how do you guys calculate the compensation amount? The conservancy fee? Rubbish collection? and what else? Do you think we shall also clock in the time and effort wasted at our side(eg rental incurred while waiting for handover)? How do you measure them by $$$? Conservancy fees quite hard to say. It depends on hows ur comversation with them. Rubbish collection are to be done by them not u. It will be good u discuss with them.
  19. Nothing is free in the world. Play safe rather be sorry. Just like renovation the more freebies, more things will need to be worried. Material and the qualilty of the product might not be up to the required standard. As they mention class 0, it sounds good but first of all do u really required up to this? Class 1 is far more then enough. There are a few things which also need to take note on it. 1) Thickness of the insulation 2) Grade of class use ? <<< u are using Class 0 3) What is the gadge (copper pipe) use ? is it gadge 23 ? 4) Is it using "3 cord 70" wiring cable ? 5) Is the drainage pipe insulation all the way ? And last but not least, who is the contractor whom is going to install for you. 3rd party contractor or directly from them. Keep a look out on this. Hope this help you clear ur doubt.
×