Re : PROPOSED OF RENOVATION WORK AMOUNT A HACKING WORK $1,750.00 1 To supply labour to hack living hall and 3 bedrooms skirting only 2 To supply labour to hack kitchen floor tiles only 3 To supply labour to hack both bathrooms floor tiles 4 To supply labour to hack kitchen cabinet 5 To supply labour to hack store room wall 6 To supply labour to dismantle existing cornice **** hall and 3 bedrooms (NOTE : Hacking of wall MAY BE REQUIRE P.E. Endorsement BY HDB upon submission of permit. Estimate cost for endorsement $500) B MASONRY WORK 1 To supply labour to make good wall after hack off store room wall $200.00 2 To supply labour to make good wall after hack off existing skirting at 3 rooms $200.00 3 To supply labour to make good wall after hack off existing skirting at L/H $180.00 4 To supply & raise kitchen floor to same height as living hall with polyfoam $250.00 and welmesh (extent living hall area) 5 To supply & erect 65mm thk hollow block and in tiles finish to divide kitchen $280.00 and laudry 6 To supply & erect partition wall between M/B and M/Bathroom dry area $350.00 7 To supply & install s/steel rubbish chute (flat type) $190.00 8a To supply & lay laminate floor **** hall c/w skirting & profile $1,600.00 8b To supply & lay pebbles and matt homogeneous tiles for steps at $360.00 entrance 9 To supply & lay laminate floor at 3 bedroom c/w skirting & profile $1,900.00 10 To supply & lay matt homogeneous floor tiles ($3/sft) c/w waterproofing at : a Kitchen $1,400.00 * Deduct : $0.30/sft (actual tiles select : $2.70/sft) $(40.00) b M/Bathroom include dry area $500.00 c Common Bathroom $400.00 * Deduct : $0.80/sft (for both bathrooms ; actual tiles select : $2.20/sft) $(40.00) 11 To supply & construct kitchen cabinet base c/w tiles $280.00 12 To supply & over lay homogeneous wall tiles ($3/sft) till 8ft ht at :- a M/bathroorm(only wet area) $1,380.00 b Common Bathroom $1,450.00 * Deduct : $0.30/sft (for both bathrooms 3 side of wall, $(60.00) actual tiles select : $2.70/sft) * Additional : $0.60/sft (for M/Bathroom 1 panel featured wall) $30.00 * Additional : $0.60/sft (for Common Bathroom 1 panel featured wall) $30.00 13 To supply & overlay cement and paint finish to kitchen exposed wall only $1,400.00 C CEILING, PAINTING AND PLUMBING WORK 1a To supply & construct false ceiling at dining hall $300.00 1b To supply & construct Light Cove **** hall $1,150.00 2a To supply labour to plaster whole house wall & ceiling with ultra hard $1,900.00 compound corner of wall plaster with beading (to prevent easy crack at edging) 2ai To supply & construct M/Bedroom (headboard) recess wall F.O.C 2aii To supply & box up air-cond window at M/Bedroom $180.00 2b To supply labour & oil sealant to paint plastered wall and ceiling (to prevent $300.00 water mark and anti mould) 3 To supply labour & paint to paint whole house with ICI/Nippon include of $1,150.00 piping & door frame (Col : 6 + 1) 4 To supply & construct S/Steel pipe to kitchen & both Bathroom $580.00 5 To supply labour only to install :- a 1no.. Kitchen sink & sink tap $80.00 b 1no. w/m inlet & outlet $20.00 c 2nos. instant heater and 2 way taps $200.00 e 2nos. Sitting to sitting w/c $160.00 f 2nos Spray gun $40.00 g 2nos. Basin & basin tap $140.00 h 2 sets bathroom accessories $40.00 6 To provide chemical washing to whole house include $280.00 (2 TIME, 1st time with acid washing, 2nd time general cleaning inlcude window) D DOOR AND WINDOW WORK 1a To supply & construc 1pc 10mm tempered frameless glass panel between $380.00 kitchen and dining hall between dining and kitchen 1b To supply & construct 2panels top track sliding glass door with 10mm $1,700.00 tempered clear glass at kitchen entrance c/w handle 1c To supply & construct hollow section to hold glass panel $100.00 2 To supply & construct 1no. Fix panel (750mm L x 1800mm Ht) with 10mm $300.00 tempered frameless clear glass 3 To supply & install 2nos. Bi-fold door with white powder coated frame and $460.00 acrylic panel at master and common bathroom entrance 4 To supply & install adjustable louver window with white powder coated frame and wired glass at :- a M/bathroom $220.00 b Common Bathroom $220.00 5 To supply & install main door with veneer solid ply (non fire rated door) $580.00 c/w press lock handle, door eye and s/steel stopper at main entrance 6 To supply & install double panel wrought iron gate with galvanized at $580.00 main entrance 7 To supply & install alum casement window with white powder coated frame & tinted glass at :- a Living Hall $600.00 b Kitchen $560.00 c Master Bedroom $280.00 d Bedroom 2 $280.00 e Bedroom 3 $440.00 9 To supply & install alum. Window grille with white powder coated frame at :- a Living Hall $300.00 b Kitchen $280.00 c Master Bedroom $150.00 d Bedroom 2 $150.00 e Bedroom 3 $220.00 SUB TOTAL $28,310.00