Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

lauwy77

Members
  • Content Count

    6
  • Joined

  • Last visited

Community Reputation

0 Neutral

About lauwy77

  • Rank
    Member

Previous Fields

  • Renovator Engaged
    nil
  • Gender
    Male
  1. Quotation for Wiring Light Point @ $32 Fan Point @ $35 Single Socket @ $45 Double Socket @ $55 SCV Point @ $105 Telephone Point @ $40 Heater Point @ $85 Hood Point @ $ 45 Air Con Point @ $85 D/B Box @ $280 Earth Bonding @ $80 Installtion fee for Light @ $8 Pendant Light @ $35 Fan @ $35 The price of the above does not include GST.
  2. Re : PROPOSED OF RENOVATION WORK AMOUNT A HACKING WORK $1,750.00 1 To supply labour to hack living hall and 3 bedrooms skirting only 2 To supply labour to hack kitchen floor tiles only 3 To supply labour to hack both bathrooms floor tiles 4 To supply labour to hack kitchen cabinet 5 To supply labour to hack store room wall 6 To supply labour to dismantle existing cornice **** hall and 3 bedrooms (NOTE : Hacking of wall MAY BE REQUIRE P.E. Endorsement BY HDB upon submission of permit. Estimate cost for endorsement $500) B MASONRY WORK 1 To supply labour to make good wall after hack off store room wall $200.00 2 To supply labour to make good wall after hack off existing skirting at 3 rooms $200.00 3 To supply labour to make good wall after hack off existing skirting at L/H $180.00 4 To supply & raise kitchen floor to same height as living hall with polyfoam $250.00 and welmesh (extent living hall area) 5 To supply & erect 65mm thk hollow block and in tiles finish to divide kitchen $280.00 and laudry 6 To supply & erect partition wall between M/B and M/Bathroom dry area $350.00 7 To supply & install s/steel rubbish chute (flat type) $190.00 8a To supply & lay laminate floor **** hall c/w skirting & profile $1,600.00 8b To supply & lay pebbles and matt homogeneous tiles for steps at $360.00 entrance 9 To supply & lay laminate floor at 3 bedroom c/w skirting & profile $1,900.00 10 To supply & lay matt homogeneous floor tiles ($3/sft) c/w waterproofing at : a Kitchen $1,400.00 * Deduct : $0.30/sft (actual tiles select : $2.70/sft) $(40.00) b M/Bathroom include dry area $500.00 c Common Bathroom $400.00 * Deduct : $0.80/sft (for both bathrooms ; actual tiles select : $2.20/sft) $(40.00) 11 To supply & construct kitchen cabinet base c/w tiles $280.00 12 To supply & over lay homogeneous wall tiles ($3/sft) till 8ft ht at :- a M/bathroorm(only wet area) $1,380.00 b Common Bathroom $1,450.00 * Deduct : $0.30/sft (for both bathrooms 3 side of wall, $(60.00) actual tiles select : $2.70/sft) * Additional : $0.60/sft (for M/Bathroom 1 panel featured wall) $30.00 * Additional : $0.60/sft (for Common Bathroom 1 panel featured wall) $30.00 13 To supply & overlay cement and paint finish to kitchen exposed wall only $1,400.00 C CEILING, PAINTING AND PLUMBING WORK 1a To supply & construct false ceiling at dining hall $300.00 1b To supply & construct Light Cove **** hall $1,150.00 2a To supply labour to plaster whole house wall & ceiling with ultra hard $1,900.00 compound corner of wall plaster with beading (to prevent easy crack at edging) 2ai To supply & construct M/Bedroom (headboard) recess wall F.O.C 2aii To supply & box up air-cond window at M/Bedroom $180.00 2b To supply labour & oil sealant to paint plastered wall and ceiling (to prevent $300.00 water mark and anti mould) 3 To supply labour & paint to paint whole house with ICI/Nippon include of $1,150.00 piping & door frame (Col : 6 + 1) 4 To supply & construct S/Steel pipe to kitchen & both Bathroom $580.00 5 To supply labour only to install :- a 1no.. Kitchen sink & sink tap $80.00 b 1no. w/m inlet & outlet $20.00 c 2nos. instant heater and 2 way taps $200.00 e 2nos. Sitting to sitting w/c $160.00 f 2nos Spray gun $40.00 g 2nos. Basin & basin tap $140.00 h 2 sets bathroom accessories $40.00 6 To provide chemical washing to whole house include $280.00 (2 TIME, 1st time with acid washing, 2nd time general cleaning inlcude window) D DOOR AND WINDOW WORK 1a To supply & construc 1pc 10mm tempered frameless glass panel between $380.00 kitchen and dining hall between dining and kitchen 1b To supply & construct 2panels top track sliding glass door with 10mm $1,700.00 tempered clear glass at kitchen entrance c/w handle 1c To supply & construct hollow section to hold glass panel $100.00 2 To supply & construct 1no. Fix panel (750mm L x 1800mm Ht) with 10mm $300.00 tempered frameless clear glass 3 To supply & install 2nos. Bi-fold door with white powder coated frame and $460.00 acrylic panel at master and common bathroom entrance 4 To supply & install adjustable louver window with white powder coated frame and wired glass at :- a M/bathroom $220.00 b Common Bathroom $220.00 5 To supply & install main door with veneer solid ply (non fire rated door) $580.00 c/w press lock handle, door eye and s/steel stopper at main entrance 6 To supply & install double panel wrought iron gate with galvanized at $580.00 main entrance 7 To supply & install alum casement window with white powder coated frame & tinted glass at :- a Living Hall $600.00 b Kitchen $560.00 c Master Bedroom $280.00 d Bedroom 2 $280.00 e Bedroom 3 $440.00 9 To supply & install alum. Window grille with white powder coated frame at :- a Living Hall $300.00 b Kitchen $280.00 c Master Bedroom $150.00 d Bedroom 2 $150.00 e Bedroom 3 $220.00 SUB TOTAL $28,310.00
  3. MBR Toilet Bedroom 2 Bedroom 3
  4. Let me introduce on my little humble house. My wife and I have finally found a unit which we have fell in love with during our first viewing. After finalising on the unit, we begin to research on reno matters through renotalk and both of us realised that the planning and decision making process are definitely worse than organising our wedding. It was really a headache as there are so many things to be taken into consideration. The first step which we have carried out was to research for ID. Searching for a good ID was not an easy task. However, after sourcing out for at least 5 IDs firm, we have finally decided to engage our current ID. Quotations given by different ID were competitive but the main reason why we have decided to engaged our ID was mainly due to the workmanship. Some of the ID brought us to their completed unit (finished renovation)but only my current ID's workmanship is the best so we decided to go for it and most importantly, her price was quite reasonable after my wife has made a comparision (apple to apple) for all 5 IDs via excel. Although the place was well maintained by the previous owner but both of us decided to overhaul the unit since it was our FIRST home. We are a young couple and decided to go for a comtemporary theme. We wanted our house to look as spacious as possible. Our plan are as follows: 1) To hack away the current 'tiny' store room 2) Extend our current living room to kitchen and the extension area will be converted into a dining area 3) A small portion of our MBR will be partitioned up to create a dry area for our toilet since the current toilet is too pathetic. 4) Storage area will be created in both common rooms. 5) Built in wardrobe for all rooms 6) L shape kitchen cabinet 7) full length shoe cabinet Affter we have dicussed with our ID, she proceeded to draw the plan and lighting points. Below is our floor plan Living Room 1.1 Living Room 1.2
  5. It happened to me too. My wife and I went for a quotation duriong 11th Jan 2011 by a woman. She asked us to sign a ACE Design Hub membership at $50. Then she will send the same request to other ID, then they will send their quotation to us for comparison. In the end, till today, only other IDs called us to arrange for meet up. She never even bother to call us to follow up. So dissappointed with their service.
×