Segarians, some good news for us staying in bukit panjang.... http://www.channelnewsasia.com/stories/sin.../272864/1/.html an excerpt from the report..... Phase 2 of the Downtown Line or DTL, will extend from Bugis along the Bukit Timah Road corridor. Mid way, it will also make a stop at the Botanic Gardens, before making a connection with the Bukit Panjang LRT network. This 16.6 kilometre stretch will have 12 stations, and is likely to be completed in 2015. It is estimated that a trip from Bukit Batok and Choa Chu Kang to downtown will be cut by some 15 minutes. And trips from the Bukit Panjang area to the city centre, which takes 60 minutes currently, will be shortened by a third.