Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

LADY_R

Members
  • Content Count

    445
  • Joined

  • Last visited

Everything posted by LADY_R

  1. How much they quote u for the window..if u wanted to change all? Just my suggestion.. instead of changing the grilles now..y don't u change together with the window in 2yrs time.. keep the cash for window grilles now n do together later..& u might be able to ask for discount since u do the whole house..
  2. heee how misleading can it be? Even if the door is small, the smallest for wardrobe is 600mm.. so base on my calculation, total length for 5 doors will be 3000mm.. with that, can play hide & seek inside Btw, why u need to reduce ur wardrobe? What will be the new size now?
  3. 7 more days to go..start to do the countdown
  4. DAY 13 Had a meet up with Neo last night at my parents plc. Mostly we discuss about the progress and also to settle all the doubt regards the reno. So far, my experience with him is a good one. Easy to talk, responsible guy and a joker.. Usually when there things need to explain we will discuss before work begin..Eg A few weeks ago he called me and say the wall tiles for my MBR toilet is OOS. And gave me a few option. Option 1 - To reselect a new tiles and hack the existing (Reject) Option 2 - To keep the existing but at some area use a new colour tiles (Reject) Option 3 - There is same colour tiles like mine BUT instead of 600x300, the tiles is 600x600. And funny guy, he wanted to put the whole big piece on my wall . I agree on Option 3, provided he have to cut the big piece to half..which after that make no diff as my existing tiles, the size be the same So far from day 1 till now, any issue we able to solve on the spot..hopefully it will continue this way. And last night after the meet up when over to see the reno progress.. Though they slow down a bit, Im still happy to see all the wall tiles are up, my base for Island and cabinet have been construct. Today, will be day 1 for plastering..was told it will take them 5 days to do the whole house aiyaiyai I start to feel very tired nowadays. Everyday including on wkends we will drop by to see the progress..
  5. still doing the tiling..suddenly I find it too slow.. Got to know my tiles for MBR toilet is OOS, so no choice have to wait. If u need a quotation from my contractor, let me know.. I can PM u his contact & who knows he can do ur dream toilet heee
  6. heee..no laa I think sis Ely is bigger and hers is 5 doors all by herself lei.. Mine all share with the partner.. n urs all by urself
  7. Custom made Wardrobe and Toilet Cabinets that I design. Hopefully their shipment arrive before end of this month.
  8. Hi Joyousonline, have u got any quotation for ur reno?
  9. Thanks Ely! my aunt took my cat last sat. She stay in KL..so she travel all the way here to take him.. She been eyeing for my cat since few years ago, begging me to give her..at last I have to admit..I GIVE UP.. my whole life is with cats..so now for me to rest..heee..once we even have 14 persian running around. Just last night she called and say my cat name CONGO..is doing fine. I guess he must be happy now that he be staying in a semi-d with garden Just that, now is durian season..and whenever I see durian I will always think of him He loves durian so much..I hope he enjoy his whole life over there and I promised him I will visit him whenever we free
  10. Have u select ur contractor? When will ur reno start?
  11. RB, I totally agree with you. I have a few conversation & meet the same officer as csingeu. From what I can see, yes, she is a nice officer BUT somehow she lack of technical knowledge. When I apply for a permit to hack part of my toilet walls, I have to keep on arguing and make sense with her regards my new layout. Example, if a top hung ventilation located on top of the door is not allowed, definately a share ventilation (an opening on top of wall) shouldn't be a problem. After a series of explanation to her how the things should work, finally its approved.
  12. hmmm Flannel Cherry looks good.. it will actually outstand and bringten up the area. colour not so dark and not so dull heee...only old timer can do this type of hand drawings...ID nowadays need software to visualise what we want. So old timer are much more hands on
  13. WELCOME Congrats on ur new purchased.. Ur toilets still look good, especially the wall tiles
  14. Hellooo!!! ::WELCOME:: Finally.. u create ur T-Blog. Hope to see ur reno progress picture
  15. Gosh! I love ur cat..so adorable. Pls dont tempt & make me regret.. Im giving away my cat this week. He turning 7yrs old this december.. BUt he start to pee outside of his cage twice a day & my husband have to keep on washing the service balcony without fail. Few days now he keep to himself..he try to reach out to me whenever he saw me.. Guilty feeling lingering in me now
  16. Its true u know. I think ur method is the best laa, especially for those who have small children and senior citizen.. Lol! May should paste a notice at all tiles shop. *How To Choose Save & Suitable Tiles For Your Home* *Copyright: May_Dream1*
  17. no laa...my timing all swee swee..have to rush my contractor. If can I want to shift-in end of this mth same like u Till now I still haven't buy my bathtub, and Neo already asked me when they deliver..I guess he going to fix it end of this week. So later apply 1hr time off to buy.
  18. What type of tiles u choose? I selected all the rough surface. Mayb u can follow maydream method, pour a bit of water to have a feel if its slippery or not. When u choose ur tiles colour, always focus on the colour & theme that u have in mind Btw, do u have any blog?
  19. RENOVATION DAY 8 PEEK-A-BOO! Super duper excited!!!
  20. hee yup... Hope everything will look acceptable.. and seems like hubster who love the new toilet layout, while me just keep to myself and pray for the good outcome.. Love the new balcony space. Before, while waiting for the approval, hubs keep on commenting not to hack the wall since can hack only 1 wall might as well dont do. But once he saw the outcome, he is more excited than me.. LoL! and how he wish we can hack both wall.. Now he keep on hinting to me for his Chengal decking..since i'm the accountant..
  21. sister, that was last week. Now wall already up..seems like small to me. Hope once tiles done, I don't have any guilty feelings. I tink my island will only be ready in two weeks time. I can't wait to see urs too..& ur progress is very fast..few days I didnt log in..a lot of things has been done
  22. Day 7 Went to view last night.. Luck not on my side, camera went dead Saw part of the kitchen tiles already up.. Hopefully more tiles be ready today Husband took this from one of our neighbour hse.. heee classic Our scenery.. Im Loving It!
  23. RENO PROGRESS As promised, here are the reno progress pictures from Day 2 to Day 5
  24. yup, I check with my Mechanical Engineer and he remind me to ask for drain tray since my compressor will be at balcony. Im still in dilema whether to run my trunking inside false ceiling or below.. Engineer ask me to put inside as what he say, it will look nice and hardly FCU get spoilt..but contractor ask me to put it below, if anything wrong can easily repair.. now I got 2wks to think
  25. heee.. will upload once my tiles is up.. & for the 1st time yesterday we have a meeting with tilers..discuss everything how it shoud be done.. And my contractor requested 2 more of my drawings for him to pass to carpentry, and 1 more for him to frame up..LoL!
×