

st96
Members-
Content Count
89 -
Joined
-
Last visited
Content Type
Profiles
Forums
Gallery
Everything posted by st96
-
Some Photographs:
-
Some photographs:
-
Sorry, I do not hv discounted price for each item. It is becos, she gave me as one lump sum discount for the whole bill. About 15% is a good gauge.
-
Identical WC & Basin & Heater for both toilets. Except the colour schemes are difference. These are normal "GEO" products: WC - $400 each bf GST & bf discount Basin - $200 each bf GST & bf discount "707" Princeton instant Heater - $300 each bf GST & bf discount
-
Extreme Makeover @ Pandan Gardens
st96 replied to mae29's topic in Reno t-Blog Chat - HDB Resale Renovation & Interior Design
Sama sama, but he provided better & more 3D dwgs for Mae & you ..... May be, becos my reno budget is not as high as both of you. -
It is nice to know that both May & Mae like this sink too! Yes, I chose this sink becos of it depth. Mae, I thought both of us purchased from the same shop!?
-
Progress: New Wall - done Foor Tiling & Wall Tiling - done Windows - done Air-Con - trunking done Ceiling Works - done Plumbing - done Wiring - done Relocation of OpenNet - done Installation of Doors & Gate - done Painting - done Installation of Lights & Fans - done Outstanding: Installation of Air-Con Compressor & Fan Coil Units, (Date: 14 May 11) Installation of Cabinet, (Date: 14 May 11) Installation of Solid Top, Hob & Hood, (Date: 21 May 11) Installation of Curtain, (Date: 21 May 11) Planned move-in date: Sat 28th May 2011 (Mover: 138 Professional Movers) Shall take some photographs to share .....
-
Some Photographs: Main Entrance Living Room (Wall for TV Console) Entrance to Bedrooms Master Bedroom Toilet
-
Progress: New Wall - done Foor Tiling & Wall Tiling - done Windows - done Air-Con - trunking done Ceiling Works - done Plumbing - done Wiring - done Relocation of OpenNet - done Installation of Doors & Gate - done Next 1-2 weeks: Painting, delayed and only start on Mon 9 May 11 Installation of Lights & Fans, delayed and only start on Mon 9 May 11 Installation of Air-Con Compressor & Fan Coil Units, (Date: 14 May 11) Installation of Cabinet, (Date: 14 May 11) Installation of Solid Top, Hob & Hood, (Date: 21 May 11) Installation of Curtain, (Date 21 May 11) Planned move-in date: Sat 28th May 2011
-
Extreme Makeover @ Pandan Gardens
st96 replied to mae29's topic in Reno t-Blog Chat - HDB Resale Renovation & Interior Design
Yes, same arrangement for my Sys 4 too. They already came three times: one time on trunking, another one on stainless steel bracket, one on further improvement on the box-up (upon request by my ID). Next trip, shall be installation of out-door compressor and in-door fan-coil units. -
The price is very much depend on material quality & source (eg China, Korean, Taiwan or Europe .....). My unit is HDB EA, and looking for single layer, source (either Korean or Taiwan). - Two window panels (full-ht and 4m width each), using alum track - Five window panels (1.5m ht x 1.75m width each), using wooden rod - One window panel (1.25m ht x 1.25m width), using alum track - One window panel (1.5m ht x 1.25m width), used roller blind One retail shop (at TradeHub21) quoted me more than $3K. I closed the deal directly with (w/o middle man) one company (at AMK industrial park 1, factory & not a retail shop), at less than $1.5K. Material: Valdez and Mercure. The lady boss is very friendly and helpful, during both site measurement and selection of material. They have many types of material (ranging from cheap to normal to expensive). Workmanship? The installation has been scheduled for 21 May 2011. Only can share my view then .....
-
Progress: New Wall - done Foor Tiling & Wall Tiling - done Windows - done Air-Con - trunking done Ceiling Works - done Plumbing - done Wiring - done Next 1-2 weeks: Painting, (Date: 3 - 6 May 11) Installation of Lights & Fans, (Date: 5 - 6 May 11) Relocation of OpenNet, (Date: 5 May 11) Installation of Air-Con Compressor & Fan Coil Units, (Date: 14 May 11) Installation of Cabinet, (Date: 14 May 11) Installation of Doors & Gate, (Date: 14 May 11) Installation of Solid Top, Hob & Hood, (Date: 21 May 11) Recent purchased: Curtain / Roller Blind - e-Curtains Trading, installation date: Sat 21 May 11 Planned move-in date: Sat 28th May 2011
-
Just came back from *** (thry my ID). Total damage closed to $3K for lights (whole unit) & fans (5 ceiling + 2 wall). Also obtain quotation from them: Full Ht Curtain - $1,800 (approx 9m run) Half-Ht Roller Blind - $1,800 (approx 10m run)
-
Sorry for not updating my Blog. Lost count of the number of days already ..... Progress: New Wall - done Foor Tiling & Wall Tiling - done Windows - done Air-Con - trucking done Next 1-2 weeks: Electrical Works Ceiling Works Relocation of OpenNet Running of Gas Pipe Piping Works Items need to be purchased: Lights & Fans Curtain / Roller Blind
-
Extreme Makeover @ Pandan Gardens
st96 replied to mae29's topic in Reno t-Blog Chat - HDB Resale Renovation & Interior Design
If you are looking for her ID/Asst PM, just to share, he is currently handling my renovation project. So far so good, he is very responsive. Not so much on drawings as I do not have much carpentry works. Actual test will be during inspection before taking over where detects come. -
Work Progress (end of 6th Day) After six days of solid hacking: 1. Master Bedroom - done 2. Bedroom No#2 - done 3. Bedroom No#3 - done 4. Living / Dining / Balcony / Storeroom - done 5. Study Room - done 6. Kitchen / Service Balcony - done 7. Master Toilet - done 8. Common Toilet - done 9. One & Half Wall - done 10. Clearing of Debris - done Tiles, Cement & Sand were delivered. Taken some photographs:
-
Noted. Was advised by the ID that 6" is adequate for HDB Toilet (size). Next higher size is 8". Yes, the exhaust shld be on when the door is closed (or toilet is occupied). There are standard two panels of window (louver). Thinking to change one panel to exhaust fan, and the other remains as either louver or top hung.
-
Thank you! Decided to go without top cabinet for (chimney & fridge position). Need another piece of advise - exhaust fan for toilet - effective? - cost (supply & install) 6" KDK?
-
Hi, Would like to seek opinion/feedback for kitchen cabinet: 1. Need or good to have top cabinet at Chimney Hood's position? 2. Need or good to have top cabinet at Fridge's position? If possible, pls share photo of your completed kitchen cabinet.
-
Work Progress (end of 4th Day) After four days of solid hacking: 1. Master Bedroom - done 2. Bedroom No#2 - done 3. Bedroom No#3 - done 4. Living / Dining / Balcony / Storeroom - done 5. Study Room - done 6. Kitchen / Service Balcony - done 7. Master Toilet - done 8. Common Toilet - done 9. One & Half Wall - not yet Now started the clearing of debris. Shld be able to complete this hacking item within this week. HDB approved the replacement of aluminium windows for the whole unit. Looking forward to next week: 1. Construct of new wall (extend the bedroom2) 2. Construct of new wall (convert the studyroom into bedroom4) 3. Tiling Works .....
-
Take pictures within the war-zone !? Ha! Ha! No lah, thought nothing much to show, only debris .....
-
Work Progress After two days of solid hacking: 1. Master Bedroom - done 2. Bedroom No#2 - done 3. Bedroom No#3 - done 4. Living / Dining / Balcony / Storeroom - done 5. Study Room - not yet 6. Kitchen / Service Balcony - not yet 7. Master Toilet - not yet 8. Common Toilet - not yet Was told they need another two/three days more to complete the hacking & clearing.
-
Hi, Jurong West Address of Chelsea Lighting, please. Only find one at 353 Jurong East Street 31