![](https://www.renotalk.com/forum/uploads/set_resources_4/84c1e40ea0e759e3f1505eb1788ddf3c_pattern.png)
![](https://www.renotalk.com/forum/uploads/set_resources_4/84c1e40ea0e759e3f1505eb1788ddf3c_default_photo.png)
countblessings
-
Content Count
28 -
Joined
-
Last visited
Single Status Update
See all updates by countblessings
-
Hi Tiler Seng
I will be renovating my old 12-year-old executive condo (already privatised). The work consists of:
1. Changing the concealed wire, water pipes and air-con pipes, and installing the necessary power points.
2. Hacking and laying marble for the living and dining rooms floors, and tiles for the kitchen and toilets walls and floors.
3. Changing