Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

hotzouk

Members
  • Content Count

    125
  • Joined

  • Last visited

Everything posted by hotzouk

  1. hi, welcome to RT, i got that at Designerlights at balestier, i think $78.
  2. hi got it from John at chelsea lightings jurong i think around 5-6 hundred, cannot remember exact price.
  3. hi, can the ip camera records image or snap image based on motion sensor? suppose if i mount it outside the main door pointing to the corridor.

  4. ya, good quality wooden shelves. I am not too sure if it will rust suppose not. I dont think so there are viewing of samples, maybe u can call him to check.
  5. Thanks, another brand also quite nice, but cost even more $440.
  6. Email kumwaikit@ymail.com does it include installation

  7. thought of that also end up didnt do and did the normal round cap type
  8. those shelves actually can buy ikea one than ask them to fix in to match the length and design rite?
  9. tomorrow re-varnish of parquet flooring and general cleaning will be done... time goes by.. so slowly.. so slowly..
  10. sure it cost $290 for both, his hp: 98524730. he also got those cheaper normal type
  11. can send me a pm on the ip camera

  12. All my LED lights works.... MBR toilet top warm white bottom warm yellow. Living rm tv console bottom and side daylight led kitchen daylight led, now waiting for tempered crystal glass backing to be mounted.
  13. My MBR tv wall with Ikea shelves, awaiting the arrival of the led tv to be mounted. Kdk ventilation fan fixed up liao. swee.. Boltless rack with shelves from William Koh. Each shelves can take up to 200kg
  14. Toilet fittings and led lights up undermounted sink and sink mixer up
  15. my fengshui required tilted door with a small enclosure for salt water vase. view of playground downstairs.
  16. Various lightings and fans in action
  17. Kitchen galaxy black granite top up with my undermount sink. Tues than they will fix the glass coloured backing, clear glass at dining, shower screen and kitchen sliding door. rinnai hob installed as well, buttons not fixed yet.
  18. Well was really busy the last few days and here are some of the things done and installed recently. Completed TV Console. MBR bathroom mirror up as well. View from Dining area.
  19. was told that my blanco sink will be under-mount on the granite. initially i had chosen the blanco granite stone look type of sink. its much bigger and looks nicer but last min change to this instead due to long term maintenance and another issue which i had read up on.. infact 2, 1st the stains and debris will not easily flow to the hole as its totally flat inside the sink. so u got to clear it every now and than. 2nd, its hard, if u accidentally slip n drop any mug or porcelin bowls there is a high chance of it being broke.
  20. My fengshui requested whole piece partition so i did a 2-in-1 with a half height shoe cabinet. The centre black portion laminates had been reflected by the glass panels. Wonder if i should remove it? Nite view of my living room... Study table completed as well but the lightings cable not connected yet. I didnt expect it to be there but i dont mind if its free.. see the 2nd pic it should be should lights inside ba.. nite view of kitchen now with stainless steel rack inside the sand-blasted glass panel.
  21. What a busy day it was today.. phew... just rush back from new house with the newly deliver Rinnai glass hob.. lady boss sent it personally here after knocking off from her shop cos she live nearby.. This was all the works done in the day MBR Toilet just left with the mirror to be stick on MBR wardrobe done up, the lighting condition doesnt help on the contrast of the matt white zebra wood grains. Same material used for the feature wall, notice the 2 familiar shelves there.. haha from IKEA but courtesy mounting done nicely with white silicon by the carpenters. The window bay seatee is also up, the material chosen is those leather look type but cannot see from here unless use macro mode.
  22. MBR wardrobe up as well, the door, mirror and glass above the pigeon hole not up yet.
  23. Most of the capentries work arrived today, only thing was the workers accidentally knocked the MBR bathroom mirror and caused a crack which got to be replaced. My self design tv feature wall.. last min design cos 1st design too hard to produce my orange and white kitchen, granite top and glass back splash not up yet.. Rinnai hob will only arrive on wed MBR toilet
  24. Fixing up of cabinets today and tommorrow. can't wait to see how it looks like. 1st cleaning already done on Sat morning.
×