Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

prettyinpink

Members
  • Content Count

    38
  • Joined

  • Last visited

Community Reputation

0 Neutral

About prettyinpink

  • Rank
    Bronze Member

Previous Fields

  • Gender
    Female
  1. Apologies, your mailbox is full.
  2. Seems that this is a non-issue after all. Service guy from Fujioh came and switch the burner lids. Seems that my maid mistakenly used the wrong burner lids for the big burner. Problem solved.
  3. Today, i called Fujioh to ask them to come service my 793-SS gas cooker. The largest burner made an explosive sound when it's turned from the highest to the lowest flame and the flame goes off when it's turned to the lowest flame. Hope the issue can be rectified. Fujioh say they'll send someone down tomorrow but need to pick up service guy's call and make sure my phone is turned on. Sigh.....only one month old, has got issues already.
  4. 3D drawings (cont'd frm previous) Master Bedroom Children's bedroom wardorbe
  5. 3D drawings are as follow: Living room: Kitchen
  6. Anyone knows which furniture shop has a good variety of display / side table ? I need one to place my water feature, and the depth should not be more than 40cm preferably 30cm. Am looking for the contemporary and modern kind. Pls advise, many thanks
  7. Oh if anyone knows how to repair grout holes, appreciate it if you could share the tricks and pm me. I don't mind doing some DIY as there are some cement and solution leftover in my house.
  8. It's been 10 weeks now and i hv shifted in: Renovated home pics are as follows: Living room : Kitchen (partially completed) w/o backsplash and top: Dining room: (dining room viewed from study) I will try to post more pics of the kitchen, wardrobe and bathrooms when i have the time, been quite busy w shifting and unpacking lately. Overall, the renovation has been quite smooth. For some reason, maybe because of the CNY period, ID has not chased me to make final payments for the reno. Flooring was not satisfactory because 4 pcs of the living rm tile were hollow and we had to chase them repeatedly to make amendments.It was actually the fault of the tiler and not so much of ID. Even after rectification, there are still some small holes in grouting not completed yet esp in the toilets. There are some minor details like cabinet hinges, minor painting to skirting not done (again could be due to CNY period). There was also one side of the L-shaped kitchen which has a missing backsplash which i don't know will ever be completed or not (will need to check w ID once she's back frm her CNY hols). However, the carpentry, overall design and painting works are satisfactory. Main entrance angle adjustment which i thot was the most difficult part of the reno was also done very nicely.
  9. continue on Week 3: Floor tiles completed [/url Kitchen sink is up: Week 4: Mosaic for Master Bathroom up: Week 5: Bought Bed and Sofa -this is in coffee colour, mine will be in dark brown.
  10. Week 2: New bedroom door frames up: Master bathroom wall tiles up with an empty space for mosaic: (no idea what's hanging mid way, so don't ask ) Common bathroom wall tiles up : Kitchen wall tiles up:
  11. Continue from previous post: After week 1: Kitchen- arghh...doesn't look like a kitchen now. Bedroom door frames hacked to replace new:
  12. Hi, am in the East. It's been 2 weeks now and tilings are going well. One minor hiccup is that my floor tile for living and bedroom had some warping effects after preliminary test lay. The tiler requested for a change just to make sure since he felt that it is a tile problem. So we reselected our floor tiles to something slightly whiter. Have requested for a change one of the bedroom's wardrobe and living room console and our ID is making the amendments to the drawings accordingly. Drawings are a bit slow (sigh....). Hope yours goes smoothly too. A preview as to what's happened: After 1st week: most hacking done. Balcony tiled walls hacked: Hacked toilet windows: Kitchen sink arrived: Living room-piles of cement stacked everywhere aka "The Warzone"
  13. 14th Nov : Tile selection done, spent roughly 2 hours in the tile shop http://img130.imageshack.us/slideshow/webp...?id=mbtiles.jpg Hope can see- image a bit dark cos took using iphone resolution is quite bad. 4 types of mosaic for consideration for my master bathroom, have selected the shiny one on bottom left. We did a stain test on our living room floor sample tile with soya sauce, no stain after 1hour....not bad, of course quality for sample and actual product may differ, crossing my fingers that the quality remains. After that went to a Jln Besar shop to get bathroom stuff and hob, took about 2 hours to select everything. My 1-year old , turned cranky cos wanted to sleep in the end, otherwise i would have settled lights too. 17th, went back to same shop to select lights, took another good 2 hours. Selected covered lights for all my bathrooms and kitchen (w/o gaps) so since done that, selected roughly the same lights for other bedrooms too. 21st spent another day in showroom to select laminates- this time think took 3 hours. Seen preliminary drawings from ID, see whether got time to upload later. Need to change all colour scheme cos laminates selected doesn't match but ok with overall layout. There are so many choices for laminates, that it can be quite confusing. Some laminates are better than others, scratch resistant- much more ex......Actually, no laminates are scratch proof, we did a test on our samples using keys and scratches eventually turn up. Some laminates are harder o scratch cos there is a slippery coating. Scratches on glossy laminates are more obvious than on matte laminates. Count down to collection of keys....in 2-3 days time. Can't wait for reno to start.
×