My plan is to over haul the whole unit :-
1. Demolish existing flooring & wall tiles @ living & dining, kitchen & toilets, bedrooms, balcony
2. Supply & lay homo floor tiles c/w skirting to living & dining, kitchen & toilets, bedrooms, balcony
3. Supply & lay homo wall tiles to kitchen & toilets
4. Construct false ceiling @ living & dining
5. Repainting the wall @ living & dining, bedrooms, balcony
6. Repainting the ceiling @ living & dining, kitchen & toilets, bedrooms, balcony
7. Construct full length & full height kitchen cabinets c/w solid worktop
8. Construct full length & full height built-in wardrobe @ bedrooms
9. Supply & install doors to bedrooms & toilets
10. Electrical installation
11. Sanitary & Plumbing works
12. Air-con system (Inverter System-3)
13. Furniture
14. Electrical appliances
Remarks
1. Demolish existing gypsum board partition @ living & dining (not shown on floor plan)
2. Supply & install 4m long full height sliding glass door @ Balcony
3. Construct gypsum board partition c/w timber door @ store (removed by previous owner)
4. Demolish existing internal brickwall @ kitchen entrance & between master bedroom & bedroom