Hi I have move in to a 3 room resales flat at Tampines in Oct 08 which is almost two years. Then I did only a few things
1. A system 3 aircon for two bedrooms and the living rooom
2. Two instant water heaters
3. masterbed room toilet bowl
After paying a high COV, I basically have to save up to the renovation. Because I am living in, I have to renovate my home in stages.
The floor plan:
The first stage is the kitichen.
I first posted on the renotalk to seek for any recommendations for the contractor:
http://www.renotalk.com/forum/index.php?showtopic=33231