Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

payton

Members
  • Content Count

    178
  • Joined

  • Last visited

Everything posted by payton

  1. i like your kitchen wall tiles. very nice
  2. enjoy! but remember to go in early early to prevent being stucked in jammmmm
  3. Hi, Read about your rather painful n frustrating reno experience putting up the wall is nice but takes up space. for MBR toilet still not so bad. however, our common bathroom is very cramp. guess we would be sitting rather close to the wall once wc is up lol u mean console for the living room? that one cost us $980, before 8% discount (7 ft). seems like your ID make u pay for alot of extras huh how much did he charge u for your console? the 3d pic for MBR is dated. did not update the new 3d pics. feature/console for living also have changes but lazy to upload new 3d pics.. we took out the cove lights for mbr so now only left with downlights for mbr.
  4. how's your reno getting along?
  5. Initially, we took out alot of stuff from our reno quote trying to save cost. Not only did we add all those stuff back, we added even more stuff! Our reno budget has totally burst big time. Just hope the outcome will be as good as the 3D drawings. Feature Wall, Console & Study Table for Bedroom 2 Glass panel in the middle will be black instead of the one shown in 3D drawing. Feature Wall & Console for Bedroom 3 Have added in black glass panels for the console to prevent dust from collecting hence lesser cleaning for me Recessed Cabinet for Study Room must really control to NOT add any more stuff!!
  6. I'm also looking for a table like this. Please let me know if you hv find anything similar at a cheaper price. Thanks
  7. This is going to be the arrangement of our big furniture. As you can see, the empty space beside the dining area is meant for mahjong session As for the rest of the items, we will plan again when the house is ready.
  8. Actually its not alot. One can of spray can settle all. Just remember this, if you are getting Legrand, get it from Choo Chiang. For Zencelo, buy from YES Electrical and make your trip worth.
  9. As requested by our dear photog ,we proudly present the switches we used for our place. Clipsal Zencelo Sliver for living/dining/bedroom DIY spray work for the switches backing : We do not know what spray paint to use initially, but decided to try our luck with Nippon Paint Pylon (Sliver Chrome 471) And we are quite satisfied with the result. I would say the color is about 90% similar to the the face plate.
  10. Very nice! What kind of lightings are you using? LED or Halogen?
  11. Work resumed earlier than on schedule. Though the schedule showed a two week break during the CNY period, painting works started on Monday, 7 Feb 11. Painting Works (1st Coat. Sealer has already been applied before CNY) The pics are rather dark as I did not bring my camera yesterday so could only shoot with my phone's camera. Common Toilet Tiling works are done for the common toilet. As the initial towel hooks we wanted were out of stock, we bought a different hook. Marble gum was applied just before the CNY break and hopefully polishing can start by end of this week. So happy to see works progressing smoothly so far and the transformation of the house.
  12. Thanks JCase. That is why we choose to do certain things ourselves to save cost like buying of the marble, arrange for transport and workers and later on, will apply sealant oursleves after ID has polished the floor..
  13. 22 Jan 11 Waterproofing was done to the marble. And we found this piece of marble damaged. SO and I were both wondering what could have caused such a big impact for the whole piece of marble to crack into pieces.
  14. Further updates!! 21 Jan 2011 My ID told me that today is the day his nightmare starts for finally it's time to load the marble.. LOL Loading of Marble Total of 7 Pallets It's really alot of work loading the marble up to the unit. Each trolley could only carry like 10 pieces of marble each time and we have about over 380 pieces of marble!! Luckily we managed to loan 4 workers to help out. Dry-Laying Yet another tedious job. We had to dry-lay the marble in the unit itself. Our ID was kind enough to lay protective cover on the floor for our dry-laying process. The workers were telling us they have aches all over their bodies at the end of the day from all the carrying of marble and dry-laying process. Really appreciate their help for it's really no easy job. Protective cover to prevent damages to the marble The Process Ceiling works were also completed and plastered nicely. MBR Room Toilet
  15. Anyone know the web source or supplier contact of these LED strips? I need to get some for my new place. Thanks in advance
  16. Hi Mafacifa, have PM-ed you.
  17. Aircon for Studyroom Fixed panel at L iving room's window has been covered up.
  18. Went to the Harvey Norman Warehouse Sales over the weekend and bought more stuff for the house. Fridge - Hitachi R-Z582EMSX Home Theatre System - ONKYO HT-5828B Thought we would do without a system but this was really a steal during the sales so we couldn't resist buying it TV - Sony 46EX710 Some progress pics to share. Ceiling Works Electrical Works Wires and cables are dangling everywhere
  19. I'm also interested in the model and price. PM me if not convenient to reveal here. thanks
  20. Nice progress. I must say kevin's workers work really fast. I also just finished plastering and now doing up false ceiling.
  21. Hi Berry! Very nice to hear from you. I tried messaging you but no reply from you. Have been wanting to pay u a visit for a very long time. I love your MBR toilet!! Did you change your number? Also looking forward to seeing how the unit will look like after renovating. lol
  22. MBR Toilet Common Toilet Cistern and Ibox for rainshower are up for both toilets. All water piping are done too.
  23. Reno has been smooth and things are on the right track n schedule so far. Here are some progress pics to share... Dining Area (Old Kitchen Entrance Sealed) Walkway to Bedrooms New Kitchen Entrance on the Left Service Balcony Walls Erected for Study Room Windows for MBR, Bedroom 2 & 3, Study Room and Living
  24. Hey, we have the same ID. So did the 7% GST impact you? And when is your estimated completion date?
×