Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

AbbyRosita

Members
  • Content Count

    292
  • Joined

  • Last visited

Everything posted by AbbyRosita

  1. After taking R2, black hair reappears again She took TRA & R2 together, look at her tummy differences only for 10days. Doesnt he look young again after R2? Be the first to experience anti aging products, pm me for details.
  2. ageLOC R2 able to reset yr genes.. And say good bye to wrinkles, sagging breast/tummy/buttocks, white hair, pimples....and many more.. you practically look 10-20yrs younger! Email (abby_rosita@hotmail.com) for more info!
  3. NO side effects, NO starving, NO exercise required and guarantee NO rebound of weight! PM or email (abby_rosita@hotmail.com) for more details.
  4. Thanks holyavartar! u shld, if not future change abit troublesome i feel.
  5. Thanks! Soon will be ur turn Thanks!
  6. thanks! ya, now all over. glad to past through smoothly in the end.
  7. Peep into MBR MTM Sliding Wardrobe TV wall feature (With swivel bracket mounted to cater to my bed position)
  8. Living Area (Sofa View) Living Area (TV Wall Feature View) Common Bathroom (With T5) MBR Bathroom (With Downlight)
  9. I've happily moved in to my new place ytd Kitchen - Left Kitchen - Right (still pending for microwave) Altar Feature Wall (Cant take the complete set cos Buddha already stay there liao) Dining Area
  10. I will share more after completion. Left 4 more days to go...
  11. Photos nice cos of dslr. Lol! Like what my Id said, workmanship is the best she find. But things not done on time, and my surface top get affected n delayed another week.
  12. Haiz... Don understand others carpentry can be done within a week. Mine drag for 3weeks still not done
  13. haiz.... schedule not met. delayed for 3 weeks for now. ya, footprint know best liao.
  14. Ya Lor. Sofa comIng in this week
  15. yup! but im aching all over for all the cleaning n packing.
  16. u start ur reno later than me leh... no need sad... very fast will be completed.
  17. It's been awhile i logged in to RT. alot of drama going on during the last stage of reno - esp on the carpentry works. i shall not comment further as i already half-hearted, sianz 1/2 Current progress:
  18. 4 panes rather crampy I feel, I prefer bigger working space
  19. Thanks! I asked for it, prefer 3 window panes rather than 4 panes. if wanna hang bedsheet all these more easier mah...
  20. Day 31 - Shower Screens Installed! Common Bathroom Master Bathroom Carpentry works are starting now, there's a slight delay from our schedule though. I will only have the handover by 10 June instead. Haiz... just hope everything can complete in time and no more hiccups along the way.
  21. hmm ard there. eat the space abit. but then still ok.
  22. I moving in to my new flat on 25june, I dOn think I can join for that whole week. Sad
×