Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

vinder79

Commercial Companies
  • Content Count

    52
  • Joined

  • Last visited

Everything posted by vinder79

  1. Unless u are doing hacking u do not need to gat a hdb permit and if u are free to co ordinate then u should get seperate ppl but u also have to consider after installation and rewiring if your toilets leak its additional cost for u as they might not come back when u call them and if they do u pay labour and transport charges.But if u get a contractor they oversea everything any thing goes wrong u push it to them.Worst case senario is whole house gets short circuit its their fault u get it done free.Thats the benefit of a contractor anything u not happy dont be scared just tell them off.U pay for it what no free service in the world. My guy charged me $180 to change toilet bowl and basin. gallon heater $80 for installation.My electrician charges $90 1 heater point and $44 per single plug double is $65.(5 above)For shelves u can get them to just drill on for you per toilet *** $20. U can use this as a pricing guide line.
  2. I am also going through this till now and previous owner left since dec.Lawyer letters bank statement ious all except loansharks.So what i did wasi have doc with place next owner is working.I called up his company and asked him to change add on IC he did and all that depts that were auto involved were changed but till 2 day i get his car installments and bank bills.Cross them out and rtn to sender every mth the same.I think ICA should really upgrade system so should all relevant depts. Dean:bad person he 1 day sure go JAIL. hate this type of indian people. never never engage indian painter I believe this remark is totally uncalled for.From the name u can know its a woman but ur remark was directed to a man.If u can say indian painter got problem let me inform u that many OTHER RACE sub cons got problems 2.My painter for my house(not my mum's) was a chinese who fxxked upp my painting .AND TRIED TO CHEAT ME luckily my main contractor was alert and told him off.My friends's house employed a malay plumber(she did co ordination herself.Wanted to save money)and her toilet bowl still leaking till now.So how we **** all of them is it then how to get reno done ??Use singaporeans be prepared to pay 40% more. Curryqueen:For me as I've only gone for 1st appt and have not paid the balance amount yet, I've told my lawyer that I will not be proceeding with the sale of the flat until they give me a photcopy of the owner's IC with the change of new address I wish i had done all this at least now no problem.But u know its not against the law for them not to present it to u .Unless u can prove that u have some reason to doubt their credibility.U can go to HDB to ask them to ask the seller for this proof. But still as said above ppl wanna be cheats they can also tear out the piece the police stick on our IC. gUYS THIS IS JUST MY 2 CENTS WORTH.
  3. No if your tiles are chipped they can use hand chippng to take out the tiles and replace.If your cup laminates are damaged they can relaminate the whole thing.And if the tiler uses the machine they have to cut it will not chipped after drying it will be CRACKING effect not chipped corners.U see if u call a tiler on your own he charges u labour and transport so why pay again??And for first wash u should not use bleach as it removes the shine.
  4. Yup u can and check how much they charge u cause they get it cheaper than us.
  5. Hi just wanna ask if u really on tight budget why dont u overlay instead??Cause 18mm kitchen cabinet is only$95 per ft run and solid top is $65.And how abt power points and connecting pipes tpo your WC and basin??And are they going to give u hot and cold water piping or u using instant heater?Are they going to charge u for lighting?How abt the chipping needed when they are going to hack nearby your kitchen cabinet?Haulage or Hdb permit?Waterproffing and acid wash??Sorry but when looking for a reno contractor for my mum i realised there were a lot of hiddden cost.
  6. Hi my 2 cents worth,acid wash should be done before your cabinets are install after installing carpentary if the workers made a mess call up the ID and tell him/her.Then take photos and hire those $10 per hr to clean up and deduct from final payment but u have to havr date ND TIME ON THE PHOTO,.And all put final touch up for everything.My mum' house is undergoing reno and 2 of the tiles are chipped.I called up the co-ordinator and the next day tiler came to replace.
  7. He gave me disc via all switches prices.So happy.Hey if any one wants to use him call his assistant-Sonie- 90432723
  8. Hi i am paying $1000 for my marble living and 3 bed room and he does it all.Call his assistant if u like -90432723.
  9. Yup i have gone to his factory and seen my mum's products being done its 18mm thick and she is getting Jennings Walnut outline laminates with brass handles.Cant wait for it to be done and i stucked to the same guy and electrical disc was given to us.
  10. Hi i just saw another track here abt someone having problem from palace of lights.Maybe before u buy from them u should check the post out.(sorry 4 got where)And its located in balestier.
  11. Yup i bought lights for my old house from there they were wonderful.What happened??
  12. No but i think my contractor said he have to double glaze it or so.kNOCK THE WALL DO U HEAR ANYTHING??Anyway i dont come on line here much anymore i had a mad dog who accussed me like ****.so anything just pm me.Thks
  13. SORRY U HAVE TO LOOK IT UP WENT THERE RECENTLY AND BOUGHT wc and washbasin 1 set $198.Its located naxt to the audio house at balestier.If u go yourself and buy paying cash/nets still got discount U MUST BARGAIN.
  14. Hi just to clear your doubt and not be hurl accusations.i only confirmed with him regarding my tiling.The reason i am posting is so thhat i am able to find cheaper quotes for carpentery and electrical which i only told him to quote but will get back to him soon.For my own house i only did tiling and painting from him and that cost me over 10k.I HAVE READ THROUGH THIS FORUM BEFORE I WANNA POST ANYTHING.Shall i take pics for u to understand what i am saying.And I AM ONLY TRYING TO SAVE MONEY FOR MY MUM! AND I FIND HIS TILING PRICES REASONAABLE SO I DID POST REGARDING HIS WORK IS THAT WRONG??????????????? This is another quote i got from another firm and i told them i want an electrical quote. Thanks for your comments lovely. Kitchen 1[ To supply and lay kitchen floor tiles -950 2) To supply and lay kitchen wall tiles to ceiling height except behind cabinet -2300 3) To construct fridge ,washing machine and cabinet base 21ft run -400 4) To supply and install kitchen bottom unit with laminated finishing and ABS trimming 21ft run -1995 5) To supply and install kitchen top unit with laminated finishing and ABS trimming 21ft run -1995 6) To supply and install cabinet top using solid surface 21ft run -1,500 7 To supply and install stainless steel dish tray c -FOC 8) To supply and install alum frosted glass - FOC 9) To supply and install kitchen middle unit 2ft run - 190 10) Labour charges to install built in oven - FOC 11) To supply and install long cabinet at piping area with laminated finishing and ABS trimming 5ft run -470 Common Toilet 1) To supply and lay toilet tiles till ceiling height.1250 2) To supply and lay toilet floor tiles -500 3) To supply labour to install toilet bowl and basin-130 4) To supply and install aluminum bi-fold door at toilet entrance-180 5) To change sewage pipe (change to plastic) -600 6) Labour charge to install 2 nos of toilet accessories-60 7) To supply labour to install 1 nos gallon heater.-50 Master Toilet 1) To supply and lay toilet tiles till ceiling height.-1250 2) To supply and lay toilet floor tiles -500 3) To supply labour to install toilet bowl and basin-130 4) To supply and install aluminum bi-fold door at toilet entrance-180 5) Labour charge to install 2 nos of toilet accessories-40 Carpentary 1) To design and fabricate full height casement wardrobe for Master bedroom 5ft run -960 2) To design and fabricate full height L-shaped casement wardrobe for c/m rm1 bedroom 10 ft run-1950 3) To design and fabricate full height L-shaped casement wardrobe for c/m rm1 bedroom 10 ft run-1950
  15. i can check for u with my hubby cause i dont know much all i know is a good price energy saving and great design.
  16. I am paying this Electrical wiring 1) Living room - To change position and supply new MCB board $350 4 down light wiring $128 4 down light installation $40 2 down light switches $60 1 ceiling fan wiring $32 1 ceiling fan switch $32 1 ceiling fan installation $50 1 ceiling light wiring $32 1 ceiling light switch $32 1 ceiling light installation $10 1 telephone point $40 1 scv point $90 2 double plugs $124 2) master bedroom- 1 aircon point $90 1 scv cable point $90 2 double plugs $120 1 toilet light wiring $32 1 toilet light switch $32 1 toilet light installation $10 1 ceiling fan wiring $32 1 ceiling fan installation $50 1 ceiling fan switch $32 1 bedroom light wiring $32 1 bedroom light switch $32 1 bedroom light installation $10 3) Common room 1- 2 double plugs $120 1 ceiling fan wiring $32 1 ceiling fan installation $50 1 ceiling fan switch $32 1 bedroom light wiring $32 1 bedroom light switch $32 1 bedroom light installation $10 4) Common Room 2 - 2 double plugs $120 1 ceiling fan wiring $32 1 ceiling fan installation $50 1 ceiling fan switch $32 1 bedroom light wiring $32 1 bedroom light switch $32 1 bedroom light installation $10 5) Kitchen 2 kitchen lights wiring $64 2 kitchen light switch $64 2 kitchen light installation $20 1 single point $42 3 double points $180 1 gallon heater point $90 1 toilet light wiring $32 1 toilet light switch $32 1 toilet light installation $10 is it cheaper ????????If u want his contact e mail me at vinder79@yahoo.com.sg
  17. Hi i posted a topic just now but cant find it.I need some advise badly.I took this guy to renovate my house last year now using him again for my mum house but i am wondering if these prices are really favourale compared to others.Pls take a look and advise me he is fast and workman ship is gd but my mum needs to save as much as she can thks to her 47 ft run kitchen cabinet. Kitchen 1[ To supply and lay kitchen floor tiles -950 2) To supply and lay kitchen wall tiles to ceiling height except behind cabinet -2300 3) To construct fridge ,washing machine and cabinet base 21ft run -380 4) To supply and install kitchen bottom unit with laminated finishing and ABS trimming 21ft run -1995 5) To supply and install kitchen top unit with laminated finishing and ABS trimming 21ft run -1995 6) To supply and install cabinet top using solid surface 21ft run -1365 7 To supply and install stainless steel dish tray c -80 8) To supply and install alum frosted glass -110 9) To supply and install kitchen middle unit 2ft run - 190 10) Labour charges to install built in oven -60 11) To supply and install long cabinet at piping area with laminated finishing and ABS trimming 5ft run -475 Common Toilet 1) To supply and lay toilet tiles till ceiling height.1250 2) To supply and lay toilet floor tiles -500 3) To supply labour to install toilet bowl and basin-160 4) To supply and install aluminum bi-fold door at toilet entrance-180 5) To change sewage pipe (change to plastic) -600 6) Labour charge to install 2 nos of toilet accessories-60 7) To supply labour to install 1 nos gallon heater.-60 Master Toilet 1) To supply and lay toilet tiles till ceiling height.-1250 2) To supply and lay toilet floor tiles -500 3) To supply labour to install toilet bowl and basin-160 4) To supply and install aluminum bi-fold door at toilet entrance-180 5) Labour charge to install 2 nos of toilet accessories-6o Carpentary 1) To design and fabricate full height casement wardrobe for Master bedroom 5ft run -975 2) To design and fabricate full height L-shaped casement wardrobe for c/m rm1 bedroom 10 ft run-1950 3) To design and fabricate full height L-shaped casement wardrobe for c/m rm1 bedroom 10 ft run-1950 Others 1) To rerun stainless steel cold piping-580 2) To run water heater piping-380 3) To hack 2 toilet wall and floor.To hack kitchen wall and floor. To hack kitchen cabinet.-1800 4) To spray rockstone on walls.Painting of ceilings.-1700 5) To plaster living room wall and toilet ceiling -300 6) To remove wall paper -400 7) To supply labour to repolish existing terrazzo flooring-990 8) To supply and install white aluminum window for living,3 bed rooms and kitchen-2066 9) To supply and install white aluminum window grills for living,3 bed rooms and kitchen-911 10) To supply and install 3 side L- box cornice in living room 12 inches-300 11) To supply and install 1 classic door at store room 160 12) To supply and install stainless steel rubbish chute-180 13) Installation of basin at solid top-100 14) To box up 3 no. of windows above c/rms and storeroom door.-120 15) To supply labour and change main door lock set-100 16) To supply labour and change main gate lockset- 100 17) To suppply and install Samsung system 3 aircon - 1800 18) Haulage -200 Electrical wiring 1) Living room - total- $2732 To change position and supply new MCB board - 4 down light wiring 4 down light installation 2 down light switches 1 ceiling fan wiring 1 ceiling fan switch 1 ceiling fan installation 1 ceiling light wiring 1 ceiling light switch 1 ceiling light installation 1 telephone point 1 scv point 2 double plugs 2) master bedroom- 1 aircon point 1 scv cable point 2 double plugs 1 toilet light wiring 1 toilet light switch 1 toilet light installation 1 ceiling fan wiring 1 ceiling fan installation 1 ceiling fan switch 1 bedroom light wiring 1 bedroom light switch 1 bedroom light installation 3) Common room 1- 2 double plugs 1 ceiling fan wiring 1 ceiling fan installation 1 ceiling fan switch 1 bedroom light wiring 1 bedroom light switch 1 bedroom light installation 4) Common Room 2 - 2 double plugs 1 ceiling fan wiring 1 ceiling fan installation 1 ceiling fan switch 1 bedroom light wiring 1 bedroom light switch 1 bedroom light installation 5) Kitchen 2 kitchen lights wiring 2 kitchen light switch 2 kitchen light installation 1 single point 3 double points 1 gallon heater point 1 toilet light wiring 1 toilet light switch 1 toilet light installation FOC 1) To hack tiles at hall at kitchen arch 2) To supply labour and material to errect hall and kitchen arch. 3) To hack existing cornice in living room 4) To construct 4 ft run extended washing machine base. 5) To hack door frame at master bedroom toilet. 6) To supply and install cooker hob and 3 knob cooker 7) HDB Permit 8) Waterproofing for kitchen and bathroom 9) Chemical wash for kitchen and 2 toilets upon completion
  18. Hi was trying to get an idea if my quote from contractor was 2 much.He is a fast worker who has already done my hacking and laying of kitchen wall,floor and toilet wall and floor.Can take a look and tell me wahat u think. Kitchen 1[ To supply and lay kitchen floor tiles -950 2) To supply and lay kitchen wall tiles to ceiling height except behind cabinet -2300 3) To construct fridge ,washing machine and cabinet base 21ft run -380 4) To supply and install kitchen bottom unit with laminated finishing and ABS trimming 21ft run -1995 5) To supply and install kitchen top unit with laminated finishing and ABS trimming 21ft run -1995 6) To supply and install cabinet top using solid surface 21ft run -1365 7 To supply and install stainless steel dish tray c -80 8) To supply and install alum frosted glass -110 9) To supply and install kitchen middle unit 2ft run - 190 10) Labour charges to install built in oven -60 11) To supply and install long cabinet at piping area with laminated finishing and ABS trimming 5ft run -475 Common Toilet 1) To supply and lay toilet tiles till ceiling height.1250 2) To supply and lay toilet floor tiles -500 3) To supply labour to install toilet bowl and basin-160 4) To supply and install aluminum bi-fold door at toilet entrance-180 5) To change sewage pipe (change to plastic) -600 6) Labour charge to install 2 nos of toilet accessories-60 7) To supply labour to install 1 nos gallon heater.-60 Master Toilet 1) To supply and lay toilet tiles till ceiling height.-1250 2) To supply and lay toilet floor tiles -500 3) To supply labour to install toilet bowl and basin-160 4) To supply and install aluminum bi-fold door at toilet entrance-180 5) Labour charge to install 2 nos of toilet accessories-6o Carpentary 1) To design and fabricate full height casement wardrobe for Master bedroom 5ft run -975 2) To design and fabricate full height L-shaped casement wardrobe for c/m rm1 bedroom 10 ft run-1950 3) To design and fabricate full height L-shaped casement wardrobe for c/m rm1 bedroom 10 ft run-1950 Others 1) To rerun stainless steel cold piping-580 2) To run water heater piping-380 3) To hack 2 toilet wall and floor.To hack kitchen wall and floor. To hack kitchen cabinet.-1800 4) To spray rockstone on walls.Painting of ceilings.-1700 5) To plaster living room wall and toilet ceiling -300 6) To remove wall paper -400 7) To supply labour to repolish existing terrazzo flooring-990 8) To supply and install white aluminum window for living,3 bed rooms and kitchen-2066 9) To supply and install white aluminum window grills for living,3 bed rooms and kitchen-911 10) To supply and install 3 side L- box cornice in living room 12 inches-300 11) To supply and install 1 classic door at store room 160 12) To supply and install stainless steel rubbish chute-180 13) Installation of basin at solid top-100 14) To box up 3 no. of windows above c/rms and storeroom door.-120 15) To supply labour and change main door lock set-100 16) To supply labour and change main gate lockset- 100 17) To suppply and install Samsung system 3 aircon - 1800 18) Haulage -200 Electrical wiring 1) Living room - total- $2732 To change position and supply new MCB board - 4 down light wiring 4 down light installation 2 down light switches 1 ceiling fan wiring 1 ceiling fan switch 1 ceiling fan installation 1 ceiling light wiring 1 ceiling light switch 1 ceiling light installation 1 telephone point 1 scv point 2 double plugs 2) master bedroom- 1 aircon point 1 scv cable point 2 double plugs 1 toilet light wiring 1 toilet light switch 1 toilet light installation 1 ceiling fan wiring 1 ceiling fan installation 1 ceiling fan switch 1 bedroom light wiring 1 bedroom light switch 1 bedroom light installation 3) Common room 1- 2 double plugs 1 ceiling fan wiring 1 ceiling fan installation 1 ceiling fan switch 1 bedroom light wiring 1 bedroom light switch 1 bedroom light installation 4) Common Room 2 - 2 double plugs 1 ceiling fan wiring 1 ceiling fan installation 1 ceiling fan switch 1 bedroom light wiring 1 bedroom light switch 1 bedroom light installation 5) Kitchen 2 kitchen lights wiring 2 kitchen light switch 2 kitchen light installation 1 single point 3 double points 1 gallon heater point 1 toilet light wiring 1 toilet light switch 1 toilet light installation FOC 1) To hack tiles at hall at kitchen arch 2) To supply labour and material to errect hall and kitchen arch. 3) To hack existing cornice in living room 4) To construct 4 ft run extended washing machine base. 5) To hack door frame at master bedroom toilet. 6) To supply and install cooker hob and 3 knob cooker 7) HDB Permit 8) Waterproofing for kitchen and bathroom 9) Chemical wash for kitchen and 2 toilets upon completion
  19. Hi all i have just joined cause i wanna get some ideas to further improve my mum's house renovation costing.I have just renovated my own house last year.I felt he overcharged me.But he was fast to do things and his workmanship was good.So this time after looking at 12 contractor/id companies i decided to go with my previous contractor.Following is her quote pls advise me if i was overcharged for anything.
  20. I just removed wall paper from my mum's new resale flat yesterday and the wall although it was removed professionally($600 for hall)still was very sticky. And the wall had 4 layers of wall paper the last layer was faded and the owners just carried on putting on new ones without removing the old ones.
  21. Palace of light has gd lights 2.U pay only for the lights they deliver and install 4 u.Reasonable pricing wonderful svc.
  22. Hi my mum is doing this to one of the walls in her hall as it is fully tiled.We decided to make it a feature wall instead.Maybe u can paint it a darker shade and use the wall stickers they have to make it look better if u are concern abt it looking boring.Kitchen 2 can have feature wall i feel.
×