  1. So many people in the house today, Tiler, Citygas, electrician...etc Pipes for CityGas
  2. Door frames Entrance to Daughter room and WIW 1 View inside WIW 1, false wall separate the WIW 2 Entrance to WIW 2 from Master bedroom Feature stone for the Vanity Area facing the Master Bedroom toilet
  3. Updates... Family area flooring in progress Wall cemented Backing of switches spray SCV and Tel splitter up
  4. Tiles in the Kitchen Balcony underway Floor Tiles in the vanity area entrance of Master bedroom toilet Use the same tiles as the balcony False Ceiling in the Bedroom 1 and 2 in progress Wardrobe will occupy the space below it and Cove lighting above it Aircon blower will sit above the door
  5. Updates... Balcony tiles in progress Living area False ceiling for Cove Lighting Cove Lighting in Family area They won't cover up till citygas lay the Gas pipe
  6. Updates False Ceiling at family and balcony in progress Balcony Family Area For Cove lighting at the side For Balcony
  7. Sorry to hear this and hope it will not slow down your reno.
  8. Hi, I got the same issue, i go all the way to screw them up and see what is the reply i got from opennet We have done an assessment of your appeal; however, we regret to inform you that we are unable to extend the first 15-metre free offer. We understand that you were not the owner during the period of the installation, which was from 05/04/10 - 24/04/10, but we have sent two letters of offer to the address in question. It would be up to the owner to respond to the offer. However the HDB transaction for your unit as mentioned was completed on the 17 Sept 2010. It was approx 4 months after the installations period. Henceforth, we are sorry to inform, as the free installation only applies during that stipulated period of time, the estimated installation charge of $220 (excluding GST) would apply should you wish to proceed with the installation.
  9. Other bathroom accessories, Toilet paper holder, cup and cup holder and clothes hanger
  10. The chosen one, Toilet Bowl for both toilet The second one from the right with the lid open Stainless steel Bidet sprayer for both toilet Towel Rack
  11. Lighting for Kitchen and service balcony Lighting for both WIW Lighting for Both common and Master Bedroom this will be in silver frame
  12. More damage on the weekend. Sink for the Vanity area in the Master bedroom Tap for the Vanity area Sink for Common toilet and master bedroom Tap for both common and master bedroom toilet
  13. Water piping in progress, city gas guys will come on Friday to run the piping This area at the wet area will be box up to cover the piping. Finally the mess is clear up Glance of the kitchen wall again
  14. The side opening for Cove lighting in the dining area Kitchen flooring and toilet flooring in the progress The difference between kitchen and bathroom flooring
  15. More updates, sorry on the poor quality. Vanity area in the master bedroom in the progress Beams for the false ceiling in the living area
  16. I'm ID is from Inwork projects Pte Ltd
  17. Reno cost is around 75k and those clipsal switches cos me almost 1.2K.
  18. Currently, i have 2 rest area, one living and one family area. So im not going to fix mio and starhub onto one area. so i make use of RJ45 cable to HDMI to share the connection for both area.Since RJ45 is cheaper so i choose this option. the downside you need to move inorder to change the channel.
  19. Some updates today Feature wall tiles up Before and after One of the toilet door seal n cement Before and after Kitchen wall tiles up
  20. Some updates on the kitchen wall Entrance to the Dining area from the kitchen,partially done. Tomorrow partition wall for WIW wardrobe will resume and the false ceiling All the item are here
  21. To tell you the truth. we take 4 hrs just to decide on the tiles..crazy right
  22. Most of the wiring done in the living area, dining, bedroom 1 and 2. The rest will continue tomorrow. Sorry picture quality very bad as no proper lighting it was 9pm. Super Messy Aircon job will continue once the false wall for the WIW is up.
  23. Just went over to have a quick glance of what have been done. Here are the pictures Wall up to form up one bedroom and behind the wall suppose to be 2 WIW. Previous layout and current One of the door to the master bedroom toilet have been cover up. Aircon trunking up
×