Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

robintan

Members
  • Content Count

    4
  • Joined

  • Last visited

Community Reputation

0 Neutral

About robintan

  • Rank
    Newbie

Previous Fields

  • Gender
    Male
  1. Thinking of doing my study area and a shoe rack for my wife, the stair also want to redo...ask a quote and was given this price. thinking of putting addational aircon too. What is fellow renotalk senior think about the price 1 To fabricate and install 9' shoe cabinet in laminate finish w/ ABS trimming. 1,800.00 2 To fabricate and install 15' low cabinet in laminate finish w/ ABS trimming. (under window) 1,500.00 3 To fabricate and install 25' low study table in laminate finish w/ ABS trimming. 2,500.00 4 To fabricate and install 12.5' top hung cabinet in laminate finish w/ ABS trimming. 1,450.00 5 To provide labour and tools to dismantle existing hand rail at staicase. 350.00 6 To provide labour and tools to remove expose tiles at staircase wall. (optional) 250.00 7 To provide labour and material to install low partition at staircase. 1,200.00 8 To provide labour and material to paint low partition at staircase. 350.00 9 To provide labour and material to install system 4 inverter aircon. (Estimate) 3,880.00 Total: $13,280.00
  2. Just brought a EM in yishun. Most ask for alot like 30 to even 100k. Insane price. Lucky I only pay 20k COV. Maybe it just next to the new hospital
  3. Sorry for missing out the information. I very noob in this that why not sure what to put in I just brought a HDB EM unit in yishun It a overhaul renovation Got 3 room and 2 toilet upstairs and 1 toilet downstairs. Basically downstair tearing down almost all the so call room to make space bigger Most of the item include the part maybe that why it expensive? such as aircon unit, light ,heater oven and so on.... anything else i need to put up?
  4. Hi all, Being looking through the forum and found the advice here very the good. I am doing a renovation soon and was quote the price $75481.88 Kindly advice? A Preliminaries INCLUDED 1 Consultation and Design 1.00 LS 2 Hand-sketch drawings 1.00 LS 3 Material choosing and color coordination 1.00 LS 4 Application to the related authorities 1.00 LS 5 Project management and supervising 1.00 LS B Dismantle/Demolition and Disposal $ 3,980.00 1 Dismantle all the fixed joinery work 1.00 LS 2 Dismantle all the existing false ceiling 1.00 LS 3 Dismantle the existing windows 1.00 LS 4 Dismantle the existing window grills 1.00 LS 5 Dismantle the existing gate 1.00 LS 6 Dismantle the existing main door and frame 1.00 LS 7 Dismantle the existing bed room and toilets doors and frames 1.00 LS 8 Dismantle the existing light fittings, light points and power points wiring 1.00 LS 9 Dismantle the existing 3 toilets sanitary wares and accessories 1.00 LS 10 Dismantle the existing balcony awning 1.00 LS 11 Hack the existing 3 toilets wall and floor tile 1.00 LS 12 Hack the existing utility area floor tile 1.00 LS 13 Create opening from bed room 2 to WC 2 1.00 LS 14 Hack the existing bath 1 corner wall 1.00 LS 15 Create opening from bed rrom 2 to bedroom 3 1.00 LS 16 Disposal 1.00LS C Masonry Work $ 2,038.00 1 Brick wall to create back the kitchen area 108.00 sqf 2 Brick wall to seal-up the existing WC 1 door and create new opening from bed room 332.00 sqf 3 Brick wall to create back WC 1 area 56.00 sqf 4 Brick wall to seal-up the existing WC 2 door and create new opening from bed room 240.00 sqf 5 Touch up the new opening from bed room 2 to bed room 3 1.00 LS D Tiling Work and Water proof $ 10,783.88 1 Supply and lay new floor tile with skirting to utility area 108.00 sqf 2 Supply and apply water proof to the WC 3 floor 36.00 sqf 3 Supply and lay new floor tile to the WC 3 floor 36.00 sqf 4 Supply and apply water proof up to 1200mm height to the WC 3 wall 120.00 sqf 5 Supply and lay new wall tiles to WC 3 192.00 sqf 6 Supply and apply water proof to the WC 2 floor 125.00 sqf 7 Supply and lay new floor tile to the WC 2 floor 125.00 sqf 8 Supply and apply water proof up to 1200mm height to the WC 2 wall 252.50 sqf 9 Supply and lay new wall tiles to WC 2 404.00 sqf 10 Supply and apply water proof to the WC 1 floor 48.00 sqf 11 Supply and lay new floor tile to the WC 1 floor 48.00 sqf 12 Supply and apply water proof up to 1200mm height to the WC 1 wall 160.00 sqf 13 Supply and lay new wall tiles to WC 1 256.00 sqf 14 Supply and lay new wall tile to kitchen 33.75 sqf E Plumbing Work $ 2,510.00 1 Supply and install new incoming water stainless steel pipe 1.00 LS 2 Supply and install kitchen sink water inlet and outlet 1.00 no 3 Supply and install washing machine water inlet outlet pipe 1.00 no 4 Supply and install WC 3 water inlet outlet for toilet bowl, basin, and jet spray 1.00 set 5 Supply and install WC 2 water inlet outlet for toilet bowl, basin, jet spray and bath tub 1.00 set 6 Supply and install WC 1 water inlet outlet for toilet bowl, basin, and jet spray 1.00 set F Sanitary Wares $ 2,895.00 1 Supply and install kitchen sink 1.00 no 2 Supply and install kitchen sink tap 1.00 no 3 Supply and install washing machine double outlet tap 1.00 no 4 Supply and install WC 3 toilet bowl 1.00 no 5 Supply and install WC 3 jet spray tap 1.00 no 6 Supply and install WC 3 basin 1.00 no 7 Supply and install WC 3 basin tap 1.00 no 8 Supply and install WC 3 toilet accessories 1.00 set 9 Supply and install WC 1 toilet bowl 1.00 no 10 Supply and install WC 1 jet spray tap 1.00 no 11 Supply and install WC 1 basin 1.00 no 12 Supply and install WC 1 basin tap 1.00 no 13 Supply and install WC 1 toilet accessories 1.00 set 14 Supply and install WC 2 toilet bowl 1.00 no 15 Supply and install WC 2 jet spray tap 1.00 no 16 Supply and install WC 2 basin 2.00 no 17 Supply and install WC 2 basin tap 2.00 no 18 Supply and install WC 2 toilet accessories 1.00 set G Electrical Work $ 5,077.00 Supply material and provide new wiring for all lights and power points 1 Light point 24.00 no 2 1x13A power point 3.00 no 3 2x13A power point 20.00 no 4 15A power point - heater 3.00 no 5 20A power point - aircon 2.00 no 6 1 gang switch 3.00 no 7 2 gang switch 7.00 no 8 3 gang switch 5.00 no 9 1 gang 2 way switch 2.00 no 10 2 gang 2 way switch 1.00 no 12 Dimmer switch 3.00 no 13 Light sensor 1.00 no 14 Bell point and switch 1.00 no 15 TV/SCV point 5.00 no 16 Telephone point 5.00 no 17 New DB box 1.00 no H Other Electrical Items $ 9,438.00 1 Supply and install storage heater 1.00 unit 2 Supply and install instant heater 2.00 unit 3 Supply and install bell unit 1.00 unit 4 Supply and install system 3 inverter air-con 1.00 set 5 Supply and install system 2 inverter air-con 1.00 set 6 Main entrance down light 2.00 no 7 Utility areas ceiling light 1.00 no 8 Living, dining and study ceiling light 4.00 no 9 Kitchen ceiling light 2.00 no 10 Toilet ceiling light 3.00 no 11 Kitchen ceiling wall light 3.00 no 12 Staircase light 1.00 no 13 Corridor light 2.00 no 14 Bed room ceiling light 4.00 no 15 Bed room down light 3.00 no 16 Toilet basin light 3.00 no J Gypsum Board Work $ 1,800.00 1 L-box for ceiling 1.00 LS 2 Box-up some exposed pipe 1.00 LS 3 False ceiling at main entrance 1.00 LS 4 Partition at bed room 1 1.00 LS K Gate, Door Frame, Door, Window and Window Grill $ 5,810.00 1 Supply and install galvanised wrought iron gate 1.00 unit 2 Supply and install main door and frame 1.00 unit 3 Supply and install rooms doors and frames 3.00 unit 4 Supply and install WC doors and frames 3.00 unit 5 Supply and install aluminium sliding and casement windows 7.00 set 6 Supply and install aluminium sliding window grill 7.00 set 7 Supply and install WC reinforced nako windows 3.00 unit L Carpentry/Joinery Work $ 28,670.00 Solid plywood, white PVC inner cabinet, laminate finish, heavy duty hinges, heavy duty drawer runner and ABS rimming around drawer front and cabinet doors 1 Shoe cabinet - full height 1.00 unit 2 Utility area seater cum low storage 2.00 unit 3 TV cabinet 1.00 unit 4 U-shape top and bottom kitchen cabinet complete with solid surface work top and incorporated iron table 1.00 set 5 Top and bottom study table 2.00 unit 6 Full height book cabinet 2.00 unit 7 Seater cum storage 1.00 unit 8 Bed room 3 plat form and low storage cabinet 1.00 unit 9 Bed room 2 full height wardrobe 1.00 unit 10 Bed room 2 full height storage cabinet 1.00 unit 11 Bed room 2 dressing table 1.00 unit 12 WC 2 basin cabinet with mirror 1.00 unit 13 Bed room 1 full height wardrobe A 1.00 unit 14 Bed room 1 study table A 1.00 unit 15 Bed rooom 1 wardrobe B 1.00 unit 16 Bed room 1 study table B 1.00 unit M Painting Work $ 2,160.00 1 Supply material and apply emulsion paint for the whole house ceiling 1.00 LS 2 Supply material and apply emulsion paint for the whole house exposed wall 1.00 LS N Clearing and Cleaning $ 320.00 1 Daily clearing work 1.00 LS 2 Daily cleaning work 1.00 LS 3 Final washing and cleaning work after the renovation 1.00 LS Total = $ 75,481.88
×