  1. Its ok. The lesser the furniture the more space u have to move abt and less cleaning too
  2. Hi Kumiko He is a contractor but they do have designer. A designer was assigned to me, she provides me with the layout plan for carpentary work but no 3D drawings. 24k DOES NOT include the following : 1) kitchen sink, tap, hood and stove. 2) lightings and fan. 3) air-conditioning system. 4) shower mixers and taps for both toilets. The rest is are all provided for. The vanity top and mirror is given FOC.
  3. We didn't do much actually but glad that everything seems to be on time and nicely done. Yesterday they have already started to clean the place. Will be going there again tonight and hope to take more pictures yah...
  4. Hello.. I just realise we have the same floor plan..hehehe. Hope you'll have a smooth reno journey
  5. New grilles for 3 bedrooms. The painting of the bedroom doors. Feature wall and TV console installed. There are still touch ups to be done here and there. Hopefully they will be able to finish of end of the week. As we will be moving in next Monday. More pictures will be updated soon. Thanks for viewing.
  6. The stove has yet to be installed. The platform at the study room. Vanity top, cabinet in masterbedroom toilet. The mirror frame. The mirror, still wraped.
  7. The installation of the our kitchen cabinets. Breakfast table.
  8. Yeah! 1 more week to go. Its picture time again. Its been 27 days since our renovation started. Below are the updates. More work is done in the kitchen and common toilet. The slightly washed kitchen floor tiles.
  9. Hi timtim, Thanks. The tap in the pic above is for hot n cold water but ours is for cold water only. We bought it from Hoe Kee and it cost us almost $200. We really love the tap. Will update pic of the installed tap on our kitchen sink soon.
  10. Hi Blue_rain, My renovation is abt 80% - 90% complete. Only waiting for the kitchen cabinets to be up. Today citigas will be coming to install the stove piping. Hope to drop by later and take some pictures Which part of Jurong West are you? My block is very near to Pioneer Mall
  11. yeah i totally agree with you. They trust us to fullfill what has been promised (payment) and we trust that they will give in their best into our renovation (their service)
  12. wah! your house is so so nice. Really love the black and white combi.
  13. My contractor did not asked for a single cent too. The first half of the payment was made after 50% of the renovation work is done. Now my house is almost done but the contractor has yet to ask me for the other 50%.
  14. Wall and floor tiles for the common toilet are also up. Thanks for viewing. That's all for now. Will be update more pics after the weekend Have a great week ahead!
  15. Cool Lime for the kids room. Mulberry for the multi-function room I choose this colour as I'll be using it more often to do wedding gifts decorations.
  16. Hi Everyone.. Hope you had a great weekend. More pictures update. The wall tiles are up for the whole kitchen and service balcony. All the bedrooms are painted, lights changed and the floor laminates are done too. The master bedroom. I think I wld want to change the bulbs to warm white.
  17. Floor tiles, the shower area. Can you see the step down portion...i couldn't at first. Gold tiles to the 'throne' The bedrooms are painted but still need to do some touch ups. Will update more pics soon Take care and enjoy the weekend!
  18. The kitchen entrance.. Now lets re-visit the master bedroom toilet... Wall tiles, we just love the wallpaper effects. As you can see, the tiler really makes the effort to match the designs nicely...
  19. TGIF! Hi everyone.. More pics update on the renovation process, the living room is more messy than ever. Lets re-visit the kitchen, the wall tiles and borders are up...no grouting yet. Close up of the border...
  20. hehehe ya lor we keep each other updated hor..
  21. Kitchen cabinets gone. Wall and floor tiles for kitchen, common toilet and masterbed room toilet were also gone. Debris were also cleared. When we were about to leave we saw a huge lorry. As kepo as I can be ..took a peep and guess what! The huge lorry was carrying OUR tiles!!! hurayyyyy! Ok lah thats all for now...will visit our house soon...according to the schedule given by the contractor, they should be doing the tiling now. Will update you all soon.
×