Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

myln02

Members
  • Content Count

    38
  • Joined

  • Last visited

Everything posted by myln02

  1. material i will ask him tmr.hope cheap bt gd.
  2. ya door i think might as well change new one.bt where can i find fire protected door less than 1k? the touchup wall n floor,he say have to c hw first cause i nt doing my kitchen floor n the previous owner tiles think cant be found le so he say will try find similar one to cover.i dunn think will cost much right? abt the carpentary,i nt sure.is he measure n quote one.my kitchen is those old type long one.doing a L shape.
  3. i dun think will be very lousy since mine is $80pfr.jus cross my finger.
  4. he only quote the quotation bt didnt say wat material is he gg to use for wardrobe or kitchen cabinet. nw worry he will give cheap material.
  5. actually its a quote from my fren's fren whose is working as a contractor.so i nt sure if he will give this kind of quote for others.sori abt that.izzit really cheap? the kitchen cabinet total around 4k plus,consider cheaper than market rate?
  6. here is my 4room 104sqm reno quotation from a contractor. can someone tell me is it reasonable ? 1 Hacking & Dismantling : a To hack off two toilet wall and floor tiles $800.00 b To dismantle two toilet bowls , basin , doors & door frames - c To hack off sink and stove support. $220.00 d To hack off 2 panels walls at kitchen entrance. $150.00 e Haulages & clearnce of debris include $200.00 f Chemcial wash after completion $120.00 2 Wet works : a To supply & lay floor tiles at 2 toilets c/w waterproofing. $880.00 b To supply & lay wall tiles @ two toilets up to celing height w/o border $2,280.00 c To construct cabinet base. $180.00 d To touchup damaged wall and floor after hack off sink / stove and walls. KIV 3 Plumbing Works a To supply and install cols stainless steel pipes at 2 toilets. $380.00 b Installation charges for 2 toilet bowls. ( toilet bowl to be supply by owner ) $140.00 c Installation charges for 2 ceramic basin at 2 toilets. ( sink to be supply by owner ) $120.00 d To supply & install inlet & outlet w/machine pipe $60.00 e Connection of kitchen sink. $60.00 4 Others a To supply and install 2 nos. aluminium bifold doors. $380.00 c To supply and install false ceiling at centre of master bedroom. $380.00 d To supply and install L-box light holder **** hall. $520.00 e To supply and install wrought iron main gate. $420.00 f Electrical Works KIV 5 Carpentry Works a To supply and install top kitchen cabinet. ( Est. 19ft x $80 ) $1,520.00 b To supply and install low kitchen cabinet. ( Est. 22ft x $80 ) $1,760.00 c To supply and install wooden top c/w stainless steel support. $280.00 d To supply and install solid surface. ( Est. 25ft x $60 ) $1,500.00 e To supply and install suspended tv console. ( 6ft x $80 ) $480.00 f To supply and install featured wall at tv area. ( 24sqft x $15 ) $360.00 g To supply and install casement wardrobe. ( 6.5ft x $80 ) $1,040.00 h To relaminate existing main door. $480.00 Total Amount : $14,710.00
  7. dun complain.jus talk to them nicely.say u are moving in,starting reno.scare all those dust will get to their clothes,better shift far away. all say in a tactic way.i believe they will auto n maybe happy to have a considerate neighbour!
  8. bingo.thats my house. yes 305 is the first to be taken up.150 n 621 is also within my choice. this 3 are all walkable distance to mrt so quite popular. congra to ur upcoming wedding.mine nt so fast.cash all used up,think have to wait for next yr. reno n stay in first. will be waiting for ur new update.by the time u start i shld alrdy tk my keys,so will c urs as refence. do update n let us knw wat u did. as my budget is tight,i nt intending to do much bt still hard to say.reno can really comes up alot.
  9. oh no thats my 6th choice. mine is more nearer to church there.hehe..ur parents must be living at 200plus there? i wonder who took the 305. thats my first choice.more higher in price bt location n floor level is gd.bonus is i went outside n saw its quite nicely done.can save alot on reno.bt anyway still contend with this coming home. think box up is the only option.btw when are u starting ur reno? excited to see the photos.i posting mine up once i take keys.
  10. yes,same layout except mine is opposite urs. my q num is 17,lucky.thought want to get bto but num nt gd,then came this balance flat.u are quite lucky,the first day i went, alot taken up,only saw 1ppl gave up.mine is at 200plus there.still within my 5 choices. Mr Yeak is located near my new home.i will visit him when i take my keys.thx for the information.maybe i will drop by the rangers design to have a look too.the common toilet is really small.still thinking how to do it.there is a big pipe near the toilet door.thinking whether to reorganize the pipe thing. i been staying in yishun all my 20plus years so really like this place.hope u will too.welcome to yishun.
  11. hi bugetice,i am the same as u,gt a house from the oct balance flat. 4a also n my floorplan is exactly the same bt jus opposite urs. maybe due to some delay for our hle n ahg so didnt manage to get keys early.will be getting next tues.very excited.jus wan to ask u,which contractor u are using n where is this Mr Yeak located at yishun?i didnt manage to get the email add of him. saw u already purchase alot of furnishing for ur home,i still havent find a contractor,needless to say furnishing.u are fast. my common toilet is small also.think this apply to all 4a old flat in yishun.i m new here,so kindly help.thx
×