  1. Hi all, Would like to know about 3 phase power. Is there any different in the wiring for single phase and 3 phase power within the house?
  2. Hi jumbopanther, your roof done by your main contractor or other subcontractor? If by other subcontractor, can pm me contacts?
  3. Got it thanks!! Still sourcing a builder to do my structure works ><
  4. Hi twothumbs, If I would install the system few months after I move in, would it require any hacking works? Or it should be done during the renovation ? Thanks
  5. Hi jumbopanther, Finally gotten my keys. Can pm me your contacts for electrician and plumber? Thanks in advance.
  6. Thanks minerat and pinkflower for the quote ) though the contractor told me his quote will be the upper bound as he don't like to give us surprises (VO) in future. But it's really good I don't need to pay that much. Minerat, thanks for advising the use of inverter and non-inverter which is very applicable in my case
  7. Really a responsible contractor Indeed the other day I was asking a contractor why there is water seepage from the toilet in my condo MBR to my MBR wooden floor .. Same theory like this is given. A concrete kerb should be done under the brick wall between the toilet and room to stop the water seeping through, even though the toilet is well waterproofed and passed the water ponding test.
  8. May I know how much it cost you on your electrical plus new aircons? Do you rewire the whole house? One of the quote I got , for aircons alone nearly 26k (6bedrooms with total built up around 3700 in future) the reason being told is exposed trunking in hdb are easier to do and hence cheaper.. But I still think i am being "chopped"
  9. Oh dear, what a typo haha.... It's a 30 yr old terrace Wish u a fruitful meeting with ID tiday abd Have a nice wkend ahead
  10. Thanks totsboy and jumbopanther ) Yes, I will definitely need to engage a PE to do the check and submit for me. Thanks jumbopanthee for the contact too )
  11. Hi Minerat, I will be collecting keys to a 30 storey old terrace next month and am busy looking for contractors. Learning a lot through your experiences here. Thanks for sharing
  12. Hi, I an buting a 20yrs old 3 storey inter terrace. I am going to do 1.5m extension at the front and 3m extension at the rear. The built in area will change from 2500 to 3700 approx. got to redo all the tiling, rewriting, plumbing and roofing. Anyone would be able to advice what would be the total cost like if piling is required?
×