Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

adah

Members
  • Content Count

    195
  • Joined

  • Last visited

Everything posted by adah

  1. Yeeps...so far progress has been good. Carpentry is so far ok. Good workmanship. Im doing solid surface. So i dunno about granite cost...yikes!
  2. hi tulips, yes mine is under batch 7. When is yours?
  3. hello pinkieberrie, check out my blog: http://www.renotalk.com/forum/index.php?sh...28521&st=40 for updates... more to come...almost come to an end... some photos to share: http://www.renotalk.com/forum/index.php?s=...st&p=535364 http://www.renotalk.com/forum/index.php?s=...st&p=541209 http://www.renotalk.com/forum/index.php?s=...st&p=541238
  4. i think it can be done. it is the method of construction of the gypsum board how you will make your overall L box straight. Even if you are concealing a structured column, they can actually put an alignment to make the whole thing straight.. So it is a no no "can't be done"thingy.
  5. i think u call either one of them first then u email them the plan or u can meet them to discuss your requirements... via PM.
  6. Lucky mine went well. Only need to check once in a while.. mine today a lot of things happening.. will update...cos my black glass coming later...
  7. hahaha...u noe...i everyday also go and c..if not me n hubby..hubby will be so excited to go n c himself thou...
  8. the kitchen breakfast table which not yet place at the right location but the solid surface done.. our toilet doors - photos retake.. Common toilet door that goes well with the colour.. Masterbed room Toilet Door my MBR rotating tv feature wall..
  9. more and more to come... yesterday the tempered glass at masterbed room toilet were done... My black bluish mosaic... today the solid surface top are already completed... Vanity top at MBR Toilet Kitchen Kitchen...Oh my lovely kitchen..
  10. Here are more of my house reno updates... 27th - 30th May where all the ceiling and box up are in progress...The round ceiling was done by mistake which I actually wanted but Kevin has no confident as he never done it before. BUT thru mistake, he managed to do his 1st round ceiling! BRAVO! 2nd June progress when all the 1st layer paint started, house cleaned and the tiles around the window completed.. Progess on 4th June is very fast and a lot of things happening where the carpentry all in, feature wall, kitchen cabinet inz, laminate flooring laid... Progress on 7th June where most of the carpentry works are completed.. More to come...Stay tune..
  11. yes..great..my handover is next week. Hope can make it. Yesterday they installed the tempered glass at MBR toilet. So far my carpentry almost done except some works.
  12. Wow, your kitchen cabinet nicey...Like mine...But i think urs is matt right?
  13. i tot he is back on sunday? btw, i noe u bought legrands sockets. If u dun wan to use thiers, u can just ask them take back becos they can use for other projects. Then u use urs...
  14. i like ur toilet...simple with a touch of random design..nice...
  15. i told him to give me discount since i am the one going to supervise the job for him.. hahaha...urs left wat else? Mine still minor thingy left... Carpentry mostly completed...Left sold surface, 2nd layer painting..lighting..
  16. hahaha...lucky never sent wrong cabinet to wrong houses ah...
  17. so far kevin is very on...well coordinate only 1 - 2 hiccup but it is still within control. Still responds our calls and smses thou he is busy preparing for his wedding.. My ID coordinated with my own electrician and plumber making sure everything is in order..
  18. My latest damage bought on last Saturday an Living Luxury Expo Hall 6A (impromptu...got a nag nag nag from hubby... ) Bought it from INCH @ $1800. For me after so much surveying done, this is considered as designer look at affordable price. Original price thou is $2248.
  19. my latest add on item - THE SHOE CABINET!!!!!!!!! TADAAAAAAAAAAAAAAAAAAAAA
  20. Hey ya! I decided to get this fan at Suntec which is 2 for $178. The promo now ON at Suntec Exhibition 401 for Energy Savings Appliances from 28 May to 6 June. I wanted to buy at Courts and wanted to add on to our delivery but yesterday impromptu, I went to buy at Suntec instead.. Anyone wan to share with me? Hahahahahahahaha....
  21. Hi hub hub. congrats on getting ur own house! I had replied u via PM. You are welcome to see my progress..
  22. hi there, will advise you via pm ya.
  23. tq. got the idea from my workplace (which is also an ID for commercial only) where we did for offices... Even Kevin (my home ID) luvs it.
×