Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

omelil

Members
  • Content Count

    3
  • Joined

  • Last visited

Community Reputation

0 Neutral

About omelil

  • Rank
    Newbie

Previous Fields

  • Gender
    Male
  1. Yes it is possible. eg. 20 feet kitchen cabinet $1800, 10 feet solid surface top at $800, dismantle and dispose of kitchen cabinet $300 purchase a turbo hood & hob package price $600 +/- purchase a standard double bowl kitchen sink & normal sink tap $200 +/- Total is $3700, can be done!
  2. Hi Lim, pricing for cabinets usually calculated in per foot run. 30 centimeters is 1 feet. if your cabinet is 3 meters long then it will be calculated as 10 feet. top cabinet 3 meters 10 feet, bottom cabinet 3 meters another 10 feet, tat equals to 20 feet. Most carpenters charge between 75 to 90 dollars pfr for standard specs. $90 pfr will be $1800 for a 20 feet kitchen cabinet EXCLUDING solid surface top. solid surface top cost from $65 to $80 pfr depending you are getting from a contractor or from a ID firm. At $80 pfr, a 10 pfr solid surface top will be $800. The pricing above usually does NOT include disposal of your existing kitchen cabinets. that is a seperate charge. fyi base on my own experience
  3. you should consider getting an alternative quote from another contractor or ID you might happen to know or recommended by other frds.. 37k is a lot of $$ for a premium flat's design and renovation. can understand that he/she is your frd and would be sincere in doing a good job for you for a premium price but really are you gg to spend 37k? dont rush, get another quote and ask to see completed unit to view if possible at least you can see e workmanship for yourself. And you can consider saving your $$ for good furniture instead of tons of built in carpentry because built-in furniture does not add much value to your house should you decide to sell in 3 to 5 yrs. And when you move, you still can bring your furniture with you.
×