Here are some pics of the existing condition
Balcony/main entrance area. We will be adding a red painted tempered glass above the tile area for the altar.
Need to hack and cement screed part of the living room area that has wall tiles.
Kitchen view
Other things we wanna do.
1. Do up both toilets and kitchen with bottom cabinets and 1 full height cabinet. India granite for kitchen top.
2. Install laminate wood flooring in MBR and BR3
3. Hack the left side of the kitchen entrance and extend the other side, idea is to block the view of the L-shape kitchen cabinet part that has the sink
4. Hack a door opening between MBR and BR3 as that will be the children room
5. Polish the marble flooring at the living room, BR2, study and store
6. Seal up the ventilation outlets above the doors
7. Change the BR doors to veneer and re-varnish the main door. Also change to wrought iron gate
8. Change rubbish chute to stainless steel
9. Shower screen in MBR toilet
10. Feature wall with side cabinet in living room
11. Divider between balcony and living room
12. 6ft top book shelf in BR2
13. Feature wall with sliding door in MBR
14. Painting, plumbing and wiring work
We have brought in the lightings and taps ourselves. Managed to save some $ there.
That's about all for the time being.