Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

blue8179

Members
  • Content Count

    88
  • Joined

  • Last visited

Everything posted by blue8179

  1. Hi nestlee, May I know how much for your tv feature brick wall? Is it around 4m length? Thank you.
  2. Hi kingandbin, May I have the contact of your contractor? Thank you
  3. Hi Reiken, May I have the contact of your contractor? Thank you!
  4. Hi Mich Clare, Sorry for the delay... Here u go.. Yako Lighting Centre Sdn. Bhd. No. 399A, Batu 3 1/2, Jalan Tebrau, 80250, Johor Bharu Tel : 07-334 2985, 333 0989, 334 2128 h/p : 012-784 8666
  5. Hi, ur kitchen layout seem alright to me May I know what is the problem? Ur house layout is big. I love it
  6. Hi Mich Clare, I'm oversea right now. Will check the address when I back to spore.... FYI, is not worth to buy a bedframe only from JB due to the transport fee... If u plan to buy more then can save more $$.. All my purchases from jb need to pay gst. Table lamp also from JB... Will check the address for you..But better call them 1st coz that time they mentioned this is the last piece. There have another lamp but is a cat. Also last piece...
  7. 3rd item : Curtain and blind Zoom in MBR Zoom in
  8. Hi Wind, The strips length varies from 450mm to 1200mm and the width is 70mm. The workmanship not very good. Still have room to improve. For example, the gap in between strips can be seen. I can see the cement screed in between the gap. They should fill up probably, right? Skirting wise they didnt put on silicon to seal up the gap in between wall. So I can see the alignment between wall and skirting is not in line. So we request to put on silicon... Not a happy experience but we learn to accept..
  9. Can't wait to turn on the cute elephant table lamp while waiting carpenter to change the flip up panel for me... 1st item arrived our new home - King size mattress and bedframe from Serta 2nd item arrived
  10. Day 2: Laminate for open shelving changed Little breakfast counter Laminate for bottom cabinet to be change tv feature wall level down & cabinet shift to left instead of right to cover the gap Laminate for flip up panel will change to black color
  11. Day 1 of carpentry works... Shoe cabinet and door for store room Altar table Living area kitchen full height cabinet cum tv console @ MBR
  12. Hi Mich Clare & Yummy, My L-shaped sofa is RM3350, black color settee is RM399 & coffee table is RM999. Mich Clare : queen size divan bedframe is RM490 w/o headboard & RM690 w/ headboard (Just a simple divan bedframe) Wish you all enjoy your shopping.
  13. Hi Yummy, U r welcome. Btw, will check the price tonight and let you know..
  14. Hi Mich Clare, Sofa should be about RM3300 and the queen size divan bedframe w/o headboard is about RM600 if I'm not wrong. Let me check for you tonight. Both are from jb but different furniture shop..
  15. Hi Steelze, I used pole system for my wardrobe so not sure about the price. For console is a bit expensive if $230/ft?? Full height console? Feature wall is hard to judge...depend on design and material...
  16. Hi Yumiko, Thanks. I do browse through quite a lots of magazine to get ideas Understand the “cant wait” feeling. I used to “cant wait” too
  17. Hi Singabox, The carpenter is from JB. Let me share a bit here then u rate it urself... Appointment for carpentry measurement by 10 sept (Fri) morning. Wait till 4pm still didn’t turn up so we called and he said will come about 7pm. Measurement done and we proceed to confirm the details on 13 Sept (Mon). He said carpentry works take 2 weeks time. Due to we are having main-con for our major reno so I inform him that will let him know the actual available date for installation. 16 Sept (Thu) - We manage to get confirmation from my main-con date of carpentry installation can be on 27 Sept. So we inform carpenter about that. But he said he is fully booked already for 27 Sept onwards and only be free by 3rd Oct. Not happy with it coz that time I thought 2 weeks after confirmation of detail should be around 27 Sept or at least end of Sept. Told him we want to move in by 10 Oct. Lastly he promise to install by 1st Oct. We have no choice so accepted. Day 1 (1st Oct – Fri) : Kitchen bottom cabinet, shoe cabinet, altar table, tv console for living and MBR all done w/o doors. I satisfied with the progress and he said will be finish within 3 days which is Fri, Mon & Tue. Only left kitchen top cabinet, bedside table, half height cabinet @ MBR & all doors to be continue. Mistakes : 1) tv feature @ MBR is too high so request to lower down 2) Inaccurate measurement for the full height tv console cabinet @ MBR 3) Incorrect laminate for the open shelving of shoe cabinet 4) A big gap (10x10cm) at the bottom kitchen cabinet due to the inaccurate measurement as well Day 2 (3rd Oct – Mon) : No one turn up…Called and ask…Carpenter said they are rushing some doors for my house so will come up by the following day and will finish all on that day too. Feel irresponsible attitude coz never inform us earlier. Luckily hubby applied leave for day 3 only Day 3 (4th Oct – Tue) : Continue all the items but cant finish it on that day… All cabinet w/o doors except kitchen bottom cabinet. Mistakes : 1) Incorrect laminate for the kitchen bottom cabinet’s door. *Should be white color instead of black color. 2) Incorrect laminate for the flip up panel of half height cabinet @ MBR. * Should be black instead of white color.... They said will come back by following day to finish the job… Day 4 (5th Oct – Wed) : Missing again so we called and he said all door for kitchen bottom cabinet need to redo so cant come to install today and need to delay till 11 Oct (Mon). Remind him again the date of move in then he said will try…. 8th Oct 11pm received his call and mention will come to install all the doors and rectify all the mistake by 9th Oct. Happy that he willing to make it before we move in but worry he cmi again. All the items successfully fix on 9th Oct. Yeah!!! So, in terms of quality & workmanship will leave for you to judge.... Will post the carpentry work soon...
  18. Hi Yumiko, My reno is done and moved in for 1 week already. Busy to unpack right now.. Will upload more photo once I settled down.. Renovation cost from 3 different contractor for the whole reno:- 1) Main contractor - hacking, wet works (tiling for bathroom, kitchen, living, & 2 bedrooms / parquet flooring @ MBR, WIW & study room) - false ceiling, door & door frame, plastering, , painting, plumbing, glass/ mirror/partial window - $37520 2) Rewiring - $3259 3) Carpentry - $9990 (Shoe cabinet, store door w/ mirror, altar table, kitchen cabinet, tv console for living & MBR, bedside table & half height cabinet @ MBR) I’m not sure can save lots or not... Decided to go for contractor is because we already know what we need and we prefer to sketch our 1st home by our self How is your progress? Wish you enjoy and all the best to you!
  19. Hi Astro, We get it from metal world located at causeway point. You can refer to http://www.metalworld.com.sg All the best to you.
  20. Hi Yummy, Yes. Hubby and me love blue color. haha. You can refer to http://www.guccaitaly.com There are two shops in JB which located at Taman Johor Jaya and Taman Molek. They did charge for transport & gst if purchase less than RM5000. Purchase above RM5000 transport fee will be waive. Cheers.
  21. Tony : 97307585 Mine one is W1500mm X D450mm X H1800mm (4 tier) & W1200mm X D300mm X H1800mm (4 tier). Quoted $260 for both.
  22. Electrical 1st, then false ceiling & follow by painting
×