Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

nemphus

Members
  • Content Count

    15
  • Joined

  • Last visited

Community Reputation

0 Neutral

About nemphus

  • Rank
    Bronze Member

Previous Fields

  • Gender
    Male

Recent Profile Visitors

544 profile views
  1. heh i got 473...also odd shape...think i got go view ur house when it was still on sale...sold by a hong kong couple rite? nice place with good view but they asked for 30k cov
  2. seems like it....cant wait to move in and explore...bukit panjang is nice and quiet..heh
  3. wow nice place....very spacious living....just bought a unit there also.but living not as big....is it noisy facing the expressway?
  4. hi all im moving into segar soon...so wats the noise at 3am?
  5. thanks SFF received your quote. Looks pretty ok to me. Anybody else have comments or advice? Is anything major missing besides electrical?
  6. Hi Tiler Seng, how much do you charge for the following items? Please PM me if necessary please. Its a 5room resale. Thanks! Living hall area 01) To supply labour to lay marble flooring **** and dining hall 2 Bath room area 01) To supply and lay 2 bathroom Heavy Duty Homogenous floor tiles 02) To supply and lay 2 bathroom designer wall tiles Kitchen area 01) To supply labour to lay kitchen wall tiles 02) To supply labour to lay kitchen Heavy Duty Homogenous floor tiles 03) To construct cabinet base, fridge base and washing base
  7. ID tells me very personal...so i should set aside 1-2K for tat..he say wont amount to much can post ur quote here to compare?
  8. Hi can I have the carpenters contact also? chio house
  9. Are there any important items missing besides electrical? Intending to put rain shower in both bathrooms
  10. Hi all thanks in advance for your comments. Any advice is appreciated. Professional Service 01) 1 Years Warranty on Masonry work 02) 1 Years Warranty on Carpentry work 03) Budget Planning 04) Design Planning 05) Space planning 06) Furniture Layout planning 07) Material & colour Proposal 08) Project Management 09) Professional Site Supervision 10) Perspective Drawing 11) Apply HDB Permit FOC Hacking Works Living area 01) Labour to hack living and dining hall floor tiles Kitchen area 01) Labour to hack Kitchen Floor and Wall Tiles 02) Labour to hack kitchen cabinet 03) Labour to hack cabinet base 04) Labour to hack Fridge base 05) Labour to hack Washing machine base 06) Labour to dismantle existing water pipe 2 Bathroom area 01) Labour to hack 2 bathroom floor and wall Tiles 02) labour to hack 2 bath room sanitary ware 03) Labour to dismantle 2 bath room water pipe 04) Labour to hack 2 bath room door Bedrooms area 01) Labour to hack 3 bedroom existing cornices Amount : $2,600.00 Masonry Works (Exclude Tiles) Living hall area 01) To supply labour to lay marble flooring **** and dining hall [ Marble and polish by owner] 2 Bath room area 01) To supply and lay 2 bathroom Heavy Duty Homogenous floor tiles [within $3.00] 02) To supply and lay 2 bathroom designer wall tiles Kitchen area 01) To supply labour to lay kitchen wall tiles [within $3.00] 02) To supply labour to lay kitchen Heavy Duty Homogenous floor tiles.[within$3.00] 03) To construct cabinet base, fridge base and washing base Amount : $7,650.00 Carpentry Works Living area 01) To supply and install with L 6ft feature wall **** hall household shelter come with swing door using laminate finishing Amount : $900.00 Bedrooms area 01) To supply and lay parquet flooring at 3 bedroom [ size 2"x 8" ] Amount : $3,500.00 Bathrooms area 01) To supply and install 2 vanity cabinet at 2 bath room using laminate finishing 02) To supply and install 2 vanity solid surfcae top 03) To supply and install 2 vanity mirror Amount : $1,300.00 Plumbing Works [Exclude Sanitary ware ] 01) To run inlet Stainless steel pipe for kitchen and 2 bathroom sink 02) To run inlet stainless steel Pipe for washing machine 03) To run 2 hot pipe at 2 shower set 04) To run drainage PVC pipe for kitchen, and 2 bathroom sink 05) To run drainage PVC pipe for washing machine 06) Labour to connect pipe at kitchen sink 07) Labour to install 2 toilet bowl. 08) Labour to install wall mounted Wash Basin at 2 bathroom. 09) Labour to install kitchen sink 10) Labour to install instant tank heater at master bathroom 11) Labour to install 2 bath room accessories Amount : $1,500.00 Painting Works 01) Paint whole unit wall and ceiling. [ ICI / Nippon ] 02) Paint whole unit water pipe. 03) Paint whole all doors and frame 04) Paint main Gate Amount : $1,200.00 Aluminium door 01) To supply and install 02 PD door at bath room come with PVC finishing Amount : $700.00 Miscellaneous 01a) Load and unload goods b) Arrange Skip Tank c) Cardboard protection d) Supply sand and building material e) Water proof screed and waterproofing membrane upturned up 150mm against the wall at 3 bathroom . [ 2 layer ] f) Cleaning and acid wash Amount : $2,500.00 Promotion Items Promotion for first 20 set while stock last 01) To supply and install WITHIN L12ft low Designer kitchen cabinet completed with: $1,188.00 a) Laminate finishing b) Solid door with ABS trimming c) 4 pc drawer d) Cutlery tray e) Labour Install cooker Hood and Hob j) To supply and install within L12ft solid surface kitchen top $888.00 Total Package : $23,926.00 Additional Items Package B 01) To supply and install 10mm tempered frameless clear glass sliding at kitchen entrance [ 3x 7ft ] 02) To supply and install sliding door shower screen at master bathroom come with white aluminium frame and clear glass finishing 03) To supply and install 10mm tempered glass shower screen at common bathroom come with one fixed panel and swing glass door 04) To construct heavy duty gypsum board partition feature wall **** hall and master room T.V area come with paint finishing 05) To supply and install solid plywood backing at T.V area 06) To box up sewage pipe at 2 bath room using waterprooft plaster board come with paint finishing 07) To supply and install false ceiling **** hall 08) To supply and install 2 side false ceiling at master room Total Amount : $4,962.00 Grand Total : $28,888.00
  11. icic.....only move house once in a long time ....gotta be careful
  12. ha maybe i not enough posts yet....anw thanks for the info...i shall go check it out keep us updated on ur meetings with whitespace yea...better yet start t-blog
  13. hey noriko_sy got any link to the forum so i can see the comments? seems like hard to get feedback bout them here maybe coz few have used them b4... looks like u must be the first liao
  14. i visit their site...the designs r really nice and creative!!! thinking of getting quoatation from them... anyone had any experience with them?
×