Went up this morning to see the work done for the past few days Electrical work - Didnt get designer socket/switch but normal switch/socket looks good to us. Common toilet - simple wash basin, toilet bowl & shower set from poh joo Master toilet
-
haha thats good! mine prefer hug. leave him to play by himself, after awhile he will come to me and stick to me like super glue.
-
haha ok. sometimes very difficult to do that cos of my boy! kept wanting hug then sometimes hubby cannot tahan so ask me to hug =( if I hug means cannot do anything! difficult to write.
-
Oh must send them email ah. Some stuffs like plastering not done well, toilet entrance skirting is uneven, change of windows handles, change of 1 grille rivet in MBR ect. I can't even remember all myself haha
-
Work done from 28 - 29th April. 1) Kitchen cabinet, fridge, washing machine base + tiling. 2) remove of electric wiring (end up rewiring) 3) Plastering of living/dining Today. 1) gas pipe 2) water pipe Renovation going smoothly but contractor didn't note down those misc/small items which I want to do/fix. =( Don't know if he remember or not. Haiz! ____________________________ Poh Joo delivery Piping! First time taking photo for my "baking area" (right side) Cabinet base tiling done Washing machine base tiling done
-
went to my place this morning, plastering of living room is done. today is installing water piping =) nothing much to see haha samgalz u are welcome =)
-
samgalz this is the quote she quote me. i am also getting doors from her. anyway the company's name is Doors Gallery Doctor. email add is d_doorsgallery@yahoo.com.sg (Serene). Supply & install 10mm frameless tempered glass shower $ 330.00 screen (1 fixed 1 swing) (60" by 71") (clear glass) Supply & install white powder coating top track aluminium $ 228.00/unit (my contractor quote $260) bi-fold door with acrylic panels for master toilet & kitchen toilet (3ft by 7ft) (Top track without bottom track using roller)
-
samgalz Thanks! Mine is contractor, not ID. But I am out sourcing for shower screen as my contractor quote me $420! Got a quote from dr door for $330 only. gimz Thanks for the link! dish rack Anyone have any idea where to find this type of 2 tier dish rack? Can mount onto the wall. Poh Joo OOS. =(
-
omg, so if we want shower screen, have to build a kerb?? wont it looks funny?
-
Oh normal ah. like this I can't install shower screen right? dont have kerb for shower screen. *puzzled*
-
MBR toilet. the shower area floor is weird... why is it but lower than the other parts? is this better? wall tiles will continue after change of window common toilet tiles kitchen cabinets base and fridge base. my drinks area is so small and squeezy - about 50cm width only =( Hood area Floor tiles is quite dark. hopefully will looks good with my kitchen cabinets color.
-
haha ok i am uploading now. i find something weird about my toilet floor =(
-
simon, actually nothing much now. today tiling is done, next is plastering of my living room. thats all. haha cant wait till kitchen cabinets is up. but thats like about 2 weeks time.
-
Anyone contacted this electrician before? Ong Teck Seng - 9827 7269. Read from one of the post in renotalk forum and contacted him but can't find this electrician in the EMA license website. The company name he gave was ks sunlight and license #:52986026R. He mentioned he can only do after office hour or weekend and sometimes he have to drill holes on wall. But HDB rule states that noisy work can only be done from 9am - 5pm mon - fri. Further questioned him about it and he simply told me he does not want to do the electrical work anymore because it is too troublesome...
-
Middle - love the way they tile difficult areas like the box in the middle! Right side How tiling is done... Cutting of tiles
-
21 April New store room and common toilet entrance Kitchen Right part of kitchen (where my hood and baking area is) Left part of kitchen (back splash for sink area is up) Master bedroom toilet tiles - Left side
-
Been busy these few days. Finally went to Poh Joo today and bought all the kitchen and toilet necessaries. Decided to let our contractor do the windows work since we are only changing bedroom 2 window grille, service yard windows, toilets windows. Too much headache for me to outsource for windows work as the MBR toilet window must be installed asap so that tiling can be done. Met up with our carpenter today. Finalised wardrobe and kitchen cabinets. No more changing for me haha! I was being real indecisive and can tell that Patrick is sick of it already. lol Hopefully the end product turns out ok. 16 April Hacking of toilets, kitchen tiles is done. 20 April - Cement screeding day Old common toilet door is sealed up. Kitchen entrance. Moved the entrance to the right so that it is not align with my main door. Fengshui master said "Qi" will flow out of the house and it is bad for us. Next 2 weeks, tiling.
-
Simon, Thanks! Will look through one of these days. Very stressed up with reno now regarding kitchen cabinets. Haha Jaden is so cute! Yah, they grow up really fast. It feels to me that my boy was still a newborn yesterday. in less than 4 months will be 1 year old already!
-
Hi Simon, Can I check with you where did you purchase your roller blind? Thanks!
-
Where can I find people that does reparing for windows and grille? Does BCA approved windows contractor does it?
-
wordangel yup, installation of windows must be done before tiling. but thats just for toilets windows. tiling starts next mon... =( headache... gim both my contractor and windows supplier say that =( windows supplier say can start tiling but must leave spaces so when taking out of old windows, wont risk the tiles getting damaged.
-
Just found out that I need my window installer to come install my window for the toilet before tiling. What about rooms windows? *headache*
-
valuehunter thanks for the compliment =) will drop by today to take photos again hahaha
-
Kitchen cabinets doors out The corrugated paper is here at 4:47PM. Hopefully my current living, bedrooms floorings are ok.
-
Yesterday was the big day! So excited! Woke up early in the morning 6 o'clock... disturbed neighbours cos have to knock real hard to chip off the wall. =( saw 2 next door neighbours and apologized to them. Went there again in the afternoon to meet up with windows supplier. Heavy rain and loud thunder... what a day! Common toilet Service balcony Master Toilet