  1. Hi Can someone give me HP contact to Jason Goh from U&B Design Renovation. Email: Calypso_w76@yahoo.com.sg Thanks !!
  2. Hi all Anyone has Ah Soon Hp? Have tried so manytimes to contact him but looks like her has changed his HP no. Can someone give me his no? Pm pr Email Thanks Email: Calypso_w76@yahoo.com.sg
  3. Hi all This is story: Just got keys to my 4RM (90m)flat in Compassvale Lane. Personally, i felt like "Chpped Carrot". Pls advise... Meet up with 1st contractor and this is his quotation presented to mi this morning: 1.0 GENERAL WORK 1.1 To supply labour and material to delivery of sand and tiles. 1.2 To supply labour to haulage and debris removal. 1,000 2.0 WETWORK 2.1 To supply labour and material to lay selected 60 x 60cm homegenous tiles c/w skirting at: i) Living / Dining / Passage way & 3 Bedrooms 4,800 ii) Household Shelter 360 2.2 To supply labour and material to construct U shape cabinet base at Kitchen area c/w 320 tiles skirting. 2.3 To supply labour and material to construct 1 No. washing machine base c/w selected 120 tiles finish. 2.4 To supply labour and material to overlay selected homogenous floor tiles at Master 450 Bathroom. 2.5 To supply labour and material to overlay selected homogenous wall tiles at Master 600 Bathroom shower area. (L1800mm) 2.6 To supply labour and material to construct 1 No. shower kerb at Master Bathroom. 150 2.7 To supply labour and material to construct 1 No. L-shape shower kerb at Common 150 Toilet. 3.0 CEILING WORK 3.1 To supply labour and material to install light holder cum L-Box **** area. 3.2 To supply labour and material to install false ceiling at Dining area. 3.3 To supply labour and material to install L-box at Master Bedroom and Bedroom 2 area. 1,200 4.0 PLUMBING WORK 4.1 Supply labour and material to install inlet and outlet piping at Kitchen area. 4.2 Supply labour to install tank heater at Common Toilet area. 4.3 Supply labour to install I No. Kitchen sink. 4.4 Supply labour to install 1 washing basin at Master Bedroom area. 4.5 Supply labour to install shower set at Master Bathroom and Common Toilet. 4.6 To supply labour to install Mirror set. 700 5.0 WINDOW 5.1 Supply labour and material to install 1 set sliding window at Service Yard area. 650 PAINTING WORK To supply labour and paints (Nippon) for whole unit painting. $1,300.00 7.0 SHOWER SCREEN 7.1 To supply and install 1 set 10mm thk tempered clear glass shower screen at Master Bathroom area. 750 8.0 CARPENTRY WORK Living 8.1 To supply and fabricate 1 No. T.V console c/w feature wall in selected laminated 1,680 plywood finish **** area. 8.2 To supply and fabricate 1 No. shoe cabinet c/w selected laminated plywood finish. Kitchen (Cooker Hood, Hob, oven, sink and kitchen accessories by owner) 900 8.3 To supply and fabricate 1 No. top kitchen cabinet cum tall unit c/w selected laminated plywood finish. 8.4 To supply and fabricate 1 set u-shape bottom kitchen cabinet c/w selected laminated plywood finish. 3,300 8.5 To supply and install 1 No. selected U-shape solid surface table top. 1,600 8.6 To supply and install 1 No. 8mm thk tempered white glass at cooker wall area. 950 Master Bedroom / Master Bathroom 8.7 To supply and fabricate 1 No. Bench c/w selected laminated finish at Master Bedroom. 1,400 8.8 To supply and fabricate 1 No. suspended vanity cabinet in selected laminated plywood 750 finish and c/w 1 No. selected solid surface top. Bedroom 1 8.9 To supply and fabricate 1 No. Bench c/w selected laminated finish at Master Bedroom. 1,400 8.10 To supply and fabricate 1 No. suspened writing table c/w drawers in selected laminated 1,500 plywood finish at Bedroom 1 area. Bedroom 3 8.11 To supply and fabricate 1 No. L-shape full height wardrobe c/w selected laminated 4,650 plywood sliding door and heavy duty track at Bedroom 3 area. Total: 30,780.00 9.0 ELECTRICAL WORK PER POINT 9.1 To run Lighting Point $40.00 9.2 Installation of light $12.00 9.3 To run !3 Amp x 1 Single Power Point $50.00 9.4 To run 13Amp x 2 Double Power Point $70.00 9.5 To run Tel Point $60.00 9.6 To run SCV Point $100.00 9.7 To run cooker hob Point $40.00 NOTE: i) Any items not mentioned above will be charged accordingly. ii) All sanitary W.C toilet bowl, washing basin, kitchen sink , shower set, mixer, heater, kitchen accessories and lighting by owner. iii) Tiles range $2.50per sqft, Border or mosaic tiles Not Included. iv) Any change after installation / completion will be charges separately. v) Work will only commence upon signed confirmation on the above and receipt of downpayment. Pls advise/gossip
  4. Bad experience with them. 1 month ago (my first visit) a nice gentlemen quoted me sofa before discount $1799. Last week, another man quoted me $1999 for the same sofa and its AFTER discount!! A total turn off for me. I will NEVER NEVER buy anything from them.
  5. Hi Charon88/Andymiom Can you share contact of electrcian pls.. Thanks
  6. Hi anyone has the shower screen contact from rendell pls PM me Thanks
×